IM Inspection Worksheet_25-07-2023_13-35-22INSPECTION WORKSHEET (FDTN-026799-2023)
RC-0275-2023Case Number:Case Module:Permit Management
07/25/2023 Partial PassInspection Status:Inspection Date:
Building FoundationInspection Type:Inspector:Charles Dyer
Job Address:Parcel Number:81 Assembly Point Rd
Lake George, NY 12845
239.12-2-27
Company Name NameContact Type
Applicant John Clarke
Architect Flynn Design Studios LLC
Contractor J. Clarke Constructiion
Granted Permission G. THOMAS MOYNIHAN JR
Primary Owner Joan Moynihan
Checklist Item CommentsPassed
Building Inspector Notes True for footings
Footing Drain Stone - 12 inch width False
PVC/Cast/Copper/Pex tubing False
Pressure Test False
Foundation / Wallpour True approved
5 psi or 10 ft. above highest conn. for 15 minutes False
Air or head test False
Footing Drain Stone - 6 inches above footing False
Foundation Dampproofing False
Plumbing Under Slab False
Foundation Waterproofing False
Footing Drain Daylight or Sump False
Footings True approved
Footing Drain stone - 6 mil poly False
Piers True
Backfill Approval False
Rough Grade 6 inch drop within 10 ft.False
Foundation Insulation Interior / Exterior False
Reinforcement in Place True 2 rows # 4 continous
Reinforcement in Place True 4 rows #4 horizontally
Permit Card Visible From Road True
Poly Under Slab False
Footing Dowels or Keyway in place True
July 25, 2023 Page 1 of 1