IM Inspection Worksheet_25-07-2023_15-11-37INSPECTION WORKSHEET (RPLUM-026786-2023)
RC-0599-2022Case Number:Case Module:Permit Management
07/25/2023 Partial PassInspection Status:Inspection Date:
Rough PlumbingInspection Type:Inspector:Charles Dyer
Job Address:Parcel Number:42 Old Assembly Point Rd
Lake George, NY 12845
239.12-2-11
Company Name NameContact Type
Applicant CGM Construction Inc
Architect Curtis Dybas
Contractor CGM Construction Inc
Granted Permission Jeffrey Randles
Nancy Randles
Primary Owner Jeffrey Randles
Nancy Randles
Checklist Item CommentsPassed
Building Inspector Notes True rough plumbing approved
Pressure Test True
Pressure Test True
3" Vent Through Roof - 18" min True
Washing Machine Drain 2 inch minimum True
All Return Air Hard Duct Work False not completed
5 psi or 10 ft. above highest conn. for 15 minutes True
Rough Plumbing / Nail Plates True
Duct Testing Outside Conditioned Space False
Shower liner test (2" of water)False
Water Supply Piping True
Duct Insulation - if required in unheated spaces False
Duct work sealed properly False
Cleanout every 100 feet change of direction True
Plumbing Vent Vents in Place True
Air Test Gas Piping 10 psi for 10 Minutes False
Washing Machine Trap: 18"-42" discharge True
Air Head True
Air Head True
50 P.S.I for 15 minutes True
1 ½ inch minimum Drain Size True
Drain Vent True
Permit Card Visible From Road True new card at front door
July 25, 2023 Page 1 of 1