Loading...
IM Inspection Worksheet_25-07-2023_15-22-04INSPECTION WORKSHEET (FRM-026785-2023) RC-0599-2022Case Number:Case Module:Permit Management 07/25/2023 Partial PassInspection Status:Inspection Date: Building FramingInspection Type:Inspector:Charles Dyer Job Address:Parcel Number:42 Old Assembly Point Rd Lake George, NY 12845 239.12-2-11 Company Name NameContact Type Applicant CGM Construction Inc Architect Curtis Dybas Contractor CGM Construction Inc Granted Permission Jeffrey Randles Nancy Randles Primary Owner Jeffrey Randles Nancy Randles Checklist Item CommentsPassed Building Inspector Notes False rough framing partial approved Air Seal all Plates and Sills False Joist hangers True Exterior wall outlets sealed False seal all exterior outlets 20 in. (W)True 5.0 sf grade False Design Professional Sign-off, if required False provide sign off from C. Dybas 24 in. (H)True Air Seal All Registers at Floor False <4:12 pitch double layer of ice/snow underlayment False Anchor Bolts 6 ft. or less on center True Ice and water shield 24 inches from wall True Bath fans connected to exterior vent False not yet connected 12 O.C.True Air Sealing all Joints Before Insulation False Notches Holes Bearing Walls True 5.7 sf above below grade False Truss Specification Provided True provide bracing where indicated on truss specs Windows Habitable Space Bedrooms True Metal Strapping for Notches Top Plate True Bracing Bridging True Garage portal framing True Deck (post beam connections hex head bolts)True provide "tension ties" Jack Studs Headers True Jack Posts Main Beams True Attic Access 22 x 30 minimum True Soffits-Insulation Baffel False provide baffles / "Accu vent" Exterior sheeting nailed properly True July 25, 2023 Page 1 of 2 INSPECTION WORKSHEET (FRM-026785-2023) Checklist Item CommentsPassed Hurricane Clips/Uplift Screws/Nail Holes Filled True Permit Card Visible From Road True Framing False Headroom 6 ft. 8 in.True July 25, 2023 Page 2 of 2