Loading...
IM Inspection Worksheet_28-07-2023_12-40-21INSPECTION WORKSHEET (FDTN-026876-2023) RC-0275-2023Case Number:Case Module:Permit Management 07/28/2023 Partial PassInspection Status:Inspection Date: Building FoundationInspection Type:Inspector:Charles Dyer Job Address:Parcel Number:81 Assembly Point Rd Lake George, NY 12845 239.12-2-27 Company Name NameContact Type Applicant John Clarke Architect Flynn Design Studios LLC Contractor J. Clarke Constructiion Granted Permission G. THOMAS MOYNIHAN JR Primary Owner Joan Moynihan Checklist Item CommentsPassed Building Inspector Notes True for footings Footing Drain Stone - 12 inch width False PVC/Cast/Copper/Pex tubing False Pressure Test False Foundation / Wallpour True approved 5 psi or 10 ft. above highest conn. for 15 minutes False Air or head test False Footing Drain Stone - 6 inches above footing False Foundation Dampproofing True 7/28/23 approved Plumbing Under Slab False Foundation Waterproofing False Footing Drain Daylight or Sump False Footings True approved Footing Drain stone - 6 mil poly False Piers True Backfill Approval False Rough Grade 6 inch drop within 10 ft.False Foundation Insulation Interior / Exterior False Reinforcement in Place True 2 rows # 4 continous Reinforcement in Place True 4 rows #4 horizontally Permit Card Visible From Road True Poly Under Slab False Footing Dowels or Keyway in place True July 28, 2023 Page 1 of 1