Loading...
IM Inspection Worksheet_31-07-2023_15-45-29INSPECTION WORKSHEET (RESFINAL-026794-2023) RC-0261-2020Case Number:Case Module:Permit Management 07/31/2023 Partial PassInspection Status:Inspection Date: Residential Final InspectionInspection Type:Inspector:Mark Smith Job Address:Parcel Number:12 Shore Acres Rd Queensbury, NY 12804 227.17-1-11 Company Name NameContact Type Applicant Daniel Frazier Meghan Frazier Architect Phinney Design Group Contractor J. Clarke Construction Granted Permission J. Clarke Construction Primary Owner Daniel Frazier Meghan Frazier Checklist Item CommentsPassed Low flow toilet 1.3 gal/flushing cycle True Bathroom Fans, if no window True 3" Plumbing Vent through roof minimum 18 inch True Grade away from foundation: 6" down, 10' out False Complete site work. Final Survey Plot Plan False Window guards req:<2' above floor/6' above grade True Interior privacy/trim/doors/main entrance 36 True Emergency egress below grade True Safety glazing: w/in 5' of tub/shower True Seals on Garage Doors, esp. Wood True Gas Shut-off Exposed & Regulator 12" min abv grd True Platform at all exterior doors False Garage Floor Pitched True Inter Connected True Arc Fault Breaker Habitable Spaces True Dryer Duct Max Length 35', Labeled Over 35'True Furnace/Hot Water Heater operating True Fresh Air Intake True Basement stairs closed rise greater than 4 inches True Foam in basement/attics covered w/thermal barrier False Provide thermal barrier at laundry room attic Outside every bedroom area True Oil Furnace Shut-Off at Entrance to Furnace Area False Blower Door Test Certification False Fin Elect; Energy Saving Light Bulbs 90 Percent True Middle inspection service Gas Log In Sealed or Glass Enclosure False OK to Issue C/O False Truss ID Signage Installed at Electrical Meter True Check with Fire Marshal for placement of truss ID July 31, 2023 Page 1 of 3 INSPECTION WORKSHEET (RESFINAL-026794-2023) Checklist Item CommentsPassed Range Hood 400+ cfm-Fresh Air REQUIRED False 3/16/23 make up air for oven hood verified as operational, contractor to provide as build drawing of system. 4 inch Building Number Address visible from road False HVAC Vent Terminal 10' from Lot Line & Openings True Guard at deck, porches 36" or more True 6" clearance to sill plate True 5/8" Type X with Living Space Above True 20 Minute Fire Door/Self-Closing Hardware False Every level, Every bedroom True Furnace shut-off w/in 30 ft. or w/in line of site True Floor truss, draft stop- fin base 1,000 sq. ft.True within 10' of all sleeping areas True on all levels w/gas appliances (i.e. furnace)True Relief Valve ,Heat Trap/Water Temp 110 deg or less True Electronic as-builts False 1/2" Gypsum or House Wall and Gable True Basement Egress: 5s.f. window w/sill or Bilco door True Walk out basement Bathroom / Kitchen Watertight True HRV or ERV Installed per Bedroom Requirements True Duct work sealed properly True As Built Septic System True Outside Spigots have Air Gap True OK to Issue Temporary C/O False All Hot Water Systems: 3/4" or larger piping R-3 True Battery backup True Guard at stairwell at 34" or more True Fresh air supply 3' from grade True Interior/Exterior Railings 34 to 38 True Smoke Detectors:True Roof Complete / Exterior Finish Complete True Carbon Monoxide Detectors:True Handrail 4 or more risers True Guards at stairs,decks,patios 30" + above grade True July 31, 2023 Page 2 of 3 INSPECTION WORKSHEET (RESFINAL-026794-2023) Checklist Item CommentsPassed General Comments False 2/22/23 partial approval for for final inspection of single family dwelling. Please address the following items - provide letter of substantial completion from architect stating that the project was completed in accordance with the approved plans and specifications. -provide a maintenance agreement for the septic system -a 20 minute thermal barrier is required at the laundry room attic at the spray foam insulation. -20 minute fire door at garage is required to be self closing and latching. -complete work in theater room - complete exterior stone work and siding - any exterior door that with out a platform will need to be secured. -submit blower door test results - submit final stamped survey -- complete exterior site work. - a final inspection by Code Compliance officer Bruce Frank is required. -provide electronic as built drawings. 2/24/23 final inspection of single family dwelling approved for temporary Certificate of Occupancy only, the items listed above must be addressed before a C.O can be issued. 3/16/23 make up air for oven hood verified as operational, contractor to provide as build drawing of system. 7/31/23 partial approval for final inspection of single family dwelling. -temporary C.O. has been renewed. 3' from Baths True Plumbing fixtures True Attic Access 22 x 30 minimum True Handrail Termination at Newell Post or Wall True July 31, 2023 Page 3 of 3