IM Inspection Worksheet_01-08-2023_15-46-21INSPECTION WORKSHEET (FDTN-026949-2023)
RC-0341-2023Case Number:Case Module:Permit Management
08/01/2023 Partial PassInspection Status:Inspection Date:
Building FoundationInspection Type:Inspector:Charles Dyer
Job Address:Parcel Number:11 Pershing Rd
Queensbury, NY 12804
302.14-1-19
Company Name NameContact Type
Applicant CERRONE BUILDERS, INC.
Contractor CERRONE BUILDERS, INC.
Engineer Daniel Ryan
Granted Permission JENNIFER HASKINS KRAUSE
Primary Owner JENNIFER HASKINS KRAUSE
Checklist Item CommentsPassed
Building Inspector Notes True for backfill 7/27/23
Footing Drain Stone - 12 inch width False N/A
PVC/Cast/Copper/Pex tubing False
Pressure Test False
Foundation / Wallpour True approved
5 psi or 10 ft. above highest conn. for 15 minutes False
Air or head test False
Footing Drain Stone - 6 inches above footing False N/A
Foundation Dampproofing True verified
Plumbing Under Slab True verified 8/1/23
Footing Drain Daylight or Sump False N/A
Footings True
Footing Drain stone - 6 mil poly False N/A
Piers True
Backfill Approval True approved
Rough Grade 6 inch drop within 10 ft.False
Foundation Insulation Interior / Exterior False
Reinforcement in Place True 2 rows # 4 continuous
Reinforcement in Place True 2 rows #4 horizontally / top and bottom
Permit Card Visible From Road True
Poly Under Slab False
Footing Dowels or Keyway in place True wet sticking
August 01, 2023 Page 1 of 1