Loading...
IM Inspection Worksheet_02-08-2023_15-28-06INSPECTION WORKSHEET (RESFINAL-026955-2023) RC-000399-2017Case Number:Case Module:Permit Management 08/02/2023 FailedInspection Status:Inspection Date: Residential Final InspectionInspection Type:Inspector:Charles Dyer Job Address:Parcel Number:145 Eagan Rd Queensbury, NY 12804 315.8-1-4 Company Name NameContact Type Applicant David Bogue Granted Permission David Bogue Primary Owner David Bogue Checklist Item CommentsPassed Low flow toilet 1.3 gal/flushing cycle False Bathroom Fans, if no window False 3" Plumbing Vent through roof minimum 18 inch False Grade away from foundation: 6" down, 10' out False Final Survey Plot Plan False Sewer Dept. Inspection Sticker False Window guards req:<2' above floor/6' above grade False Interior privacy/trim/doors/main entrance 36 False Backflow Preventors where required False Emergency egress below grade False Fuel Tanks above flood plain elevation False Intake Openings False Safety glazing: w/in 5' of tub/shower False Site Plan / Variance required False Seals on Garage Doors, esp. Wood False Basement ceiling covered 2x8 fl joist or less False Attic Access Insulation = Attic R- Value False Gas Shut-off Exposed & Regulator 12" min abv grd False Platform at all exterior doors False Fireblocking at fl joist 80 s.f. or less False Garage Floor Pitched False Buried Fuel Tanks anchored in flood zone False Wood deck: 2'+ from grade dia bracing required False Inter Connected False Arc Fault Breaker Habitable Spaces False Dryer Duct Max Length 35', Labeled Over 35'False Energy Sticker on Elec. Panel:R-Val. & Heating Sys False Furnace/Hot Water Heater operating False Fresh Air Intake False Chimney Rain Cap Installed False Basement stairs closed rise greater than 4 inches False Foam in basement/attics covered w/thermal barrier False August 02, 2023 Page 1 of 3 INSPECTION WORKSHEET (RESFINAL-026955-2023) Checklist Item CommentsPassed Outside every bedroom area False Oil Furnace Shut-Off at Entrance to Furnace Area False Blower Door Test Certification False Fin Elect; Energy Saving Light Bulbs 90 Percent False Gas Log In Sealed or Glass Enclosure False OK to Issue C/O False Truss ID Signage Installed at Electrical Meter False Range Hood 400+ cfm-Fresh Air REQUIRED False 4 inch Building Number Address visible from road False CO in bedrooms w/gas appliances False CO in bedrooms w/gas appliances False HVAC Vent Terminal 10' from Lot Line & Openings False Attic Access Gasketed False Jack posts in basement lagged at top and bottom False Flood Plain Certification, if required False Guard at deck, porches 36" or more False 6" clearance to sill plate False 5/8" Type X with Living Space Above False Propane Tank: Proper Setback from Prop Line/Struct False Knee wall/Crawl space 18" x 24"False Plumbing fixtures False Duct work sealed properly False Guards at stairs,decks,patios 30" + above grade False Handrail Termination at Newell Post or Wall False Carbon Monoxide Detectors:False within 10' of all sleeping areas False As Built Septic System False Furnace shut-off w/in 30 ft. or w/in line of site False Every level, Every bedroom False Attic Access 22 x 30 minimum False Flex Gas Pipe Bonding False Battery backup False Floor truss, draft stop- fin base 1,000 sq. ft.False CSST/other piping in conduit if buried,if required False 1/2" Gypsum-Bsmt Ceiling<2x10 Frame/TJI/Fl. Truss False Handrail 4 or more risers False 1/2" Gypsum or House Wall and Gable False Encl. Stairs Sheetrock Underside minimum ½ Gypsum False Foundation insulation to floor False Outside Spigots have Air Gap False OK to Issue Temporary C/O False HRV or ERV Installed per Bedroom Requirements False August 02, 2023 Page 2 of 3 INSPECTION WORKSHEET (RESFINAL-026955-2023) Checklist Item CommentsPassed Deck Ledger-Bolted per Code False Fresh air supply 3' from grade False Roof Complete / Exterior Finish Complete False Interior/Exterior Railings 34 to 38 False 20 Minute Fire Door/Self-Closing Hardware False Bathroom / Kitchen Watertight False Smoke Detectors:False Guard at stairwell at 34" or more False Relief Valve ,Heat Trap/Water Temp 110 deg or less False Low water shut-off boiler False 3' from Baths False General Comments False "Camp" is on new foundation, but project is not completed. Spoke with David about renewing permit and to submit any revisions. 8/3/21 Please respond to this email as to know status of this project 518-761-8207 Chimney Height / B Vent / Direct Vent Location False All Hot Water Systems: 3/4" or larger piping R-3 False Basement Egress: 5s.f. window w/sill or Bilco door False 4+ Deck Joist Ledger Connections-24" From Ends False August 02, 2023 Page 3 of 3