IM Inspection Worksheet_03-08-2023_08-41-26INSPECTION WORKSHEET (FDTN-027006-2023)
RC-0480-2023Case Number:Case Module:Permit Management
08/03/2023 FailedInspection Status:Inspection Date:
Building FoundationInspection Type:Inspector:Charles Dyer
Job Address:Parcel Number:5 Reardon Rd
Queensbury, NY 12804
289.7-1-6
Company Name NameContact Type
Applicant Dana Roberts
Contractor HD Construction
Granted Permission HD Construction
Primary Owner Mark Weidner
Checklist Item CommentsPassed
Building Inspector Notes True A permit has not been issued for this project
Footing Drain Stone - 12 inch width False
PVC/Cast/Copper/Pex tubing False
Pressure Test False
Foundation / Wallpour False
5 psi or 10 ft. above highest conn. for 15 minutes False
Masonry Wall False
Air or head test False
Footing Drain Stone - 6 inches above footing False
Foundation Dampproofing False
Plumbing Under Slab False
Foundation Waterproofing False
Footing Drain Daylight or Sump False
Footings False
Footing Drain stone - 6 mil poly False
Backfill Approval False
Rough Grade 6 inch drop within 10 ft.False
Foundation Insulation Interior / Exterior False
Reinforcement in Place False provide 2 rows # 4 bar pinned to existing foundation / it was
observed that side wall caving in please dig out, call when ready
prior to pouring concrete for re-check
Reinforcement in Place False
Permit Card Visible From Road False
Poly Under Slab False
Footing Dowels or Keyway in place False
August 03, 2023 Page 1 of 1