Loading...
IM Inspection Worksheet_03-08-2023_10-41-29INSPECTION WORKSHEET (FDTN-026977-2023) CC-0241-2023Case Number:Case Module:Permit Management 08/03/2023 Partial PassInspection Status:Inspection Date: Building FoundationInspection Type:Inspector:Mark Smith Job Address:Parcel Number:355 Dix Ave Queensbury, NY 12804 303.15-1-27 Company Name NameContact Type Applicant Blueprint Engineering and Desing LLC Contractor Hunt Companies Inc Engineer Blueprint Engineering and Desing LLC Granted Permission Hospitality Syracuse Inc Primary Owner Hospitality Syracuse Inc Checklist Item CommentsPassed Building Inspector Notes False 7/26/23 partial approval for foundation. -footings approved 8/3/23 partial approval for foundation. -foundation walls approved. Footing Drain Stone - 12 inch width False PVC/Cast/Copper/Pex tubing False Pressure Test False Foundation / Wallpour True 8/3/23 foundation walls approved 5 psi or 10 ft. above highest conn. for 15 minutes False Masonry Wall False Air or head test False Footing Drain Stone - 6 inches above footing False Foundation Dampproofing False Plumbing Under Slab False Foundation Waterproofing False Footing Drain Daylight or Sump False Monolithic Slab False Footings True 7/26/23 footings approved Footing Drain stone - 6 mil poly False Piers False Backfill Approval False Rough Grade 6 inch drop within 10 ft.False Foundation Insulation Interior / Exterior False Reinforcement in Place True 8/3/23 foundation walls approved Reinforcement in Place True 7/26/23 footings approved Permit Card Visible From Road False Poly Under Slab False Footing Dowels or Keyway in place False August 03, 2023 Page 1 of 1