Loading...
IM Inspection Worksheet_03-08-2023_14-17-50INSPECTION WORKSHEET (SEP-027007-2023) RC-0056-2022Case Number:Case Module:Permit Management 08/03/2023 PassedInspection Status:Inspection Date: SepticInspection Type:Inspector:Mark Smith Job Address:Parcel Number:1481 Bay Rd Lake George, NY 12845 265.-1-21.2 Company Name NameContact Type Applicant Jesse Stevenson Concrete Contractor Ottens Concrete Contractor Ottens Concrete Engineer Infinite Engineering Solutions Granted Permission Jesse Stevenson Primary Owner Jesse Stevenson Checklist Item CommentsPassed Building Inspector Notes True 1/25/23 septic system not approved - unable to verify absorption field due to snow cover, call for recheck when snow has been cleared. 8/3/23 final inspection for septic system approved. Size of Stone True # 2 Roof gutters don't discharge over leach field True Waterline separation distance True Building to Tank True 4" sch 40 Tank to Distribution Box True 4" sch 40 Opening Sealed:True End Cap True Absorbtion Fields: Total Length True 5 lasterals at 50' each, 250; total Septic system field above flood plain True Foundation to Tank True 10' Engineer Report and As-Built True received Sump pump not connected to septic system True Location of system on property True front yard Type of Water: Municipal / Well Water True well water supply Locations / Separations True Well separation distance True Depth of Trenches True 24" Length of Each Trench True 50' System Use Status True system approved for use Conforms as per Plot Plan True Distribution box to Field / Pit True 4" sanarty lines Foundation to Absorption True 22' InletOutlet Pipes & Baffles True Soil Type: Loam True Permit Card Visible From Road True August 03, 2023 Page 1 of 1