Loading...
IM Inspection Worksheet_08-08-2023_13-32-29INSPECTION WORKSHEET (FDTN-027083-2023) RC-0275-2023Case Number:Case Module:Permit Management 08/08/2023 PassedInspection Status:Inspection Date: Building FoundationInspection Type:Inspector:Charles Dyer Job Address:Parcel Number:81 Assembly Point Rd Lake George, NY 12845 239.12-2-27 Company Name NameContact Type Applicant John Clarke Architect Flynn Design Studios LLC Contractor J. Clarke Constructiion Granted Permission G. THOMAS MOYNIHAN JR Primary Owner Joan Moynihan Checklist Item CommentsPassed Building Inspector Notes True for footings Footing Drain Stone - 12 inch width True PVC/Cast/Copper/Pex tubing False Pressure Test True for PEX tubing / hydronic heat verified Foundation / Wallpour True approved Footing Drain Stone - 6 inches above footing True Foundation Dampproofing True 7/28/23 approved / 2'" foam Plumbing Under Slab True Footing Drain Daylight or Sump True Footings True approved Footing Drain stone - 6 mil poly True Piers True Backfill Approval True Rough Grade 6 inch drop within 10 ft.True Foundation Insulation Interior / Exterior True exterior Reinforcement in Place True 2 rows # 4 continous Reinforcement in Place True 4 rows #4 horizontally Permit Card Visible From Road True Poly Under Slab True Footing Dowels or Keyway in place True August 08, 2023 Page 1 of 1