IM Inspection Worksheet_10-08-2023_16-05-08INSPECTION WORKSHEET (RPLUM-027131-2023)
RC-0900-2021Case Number:Case Module:Permit Management
08/10/2023 Partial PassInspection Status:Inspection Date:
Rough PlumbingInspection Type:Inspector:Charles Dyer
Job Address:Parcel Number:25 Otter Track
Queensbury, NY 12804
316.14-1-9
Company Name NameContact Type
Applicant Mario Profita
Architect Blackbird Group Architect LLC
Contractor Superior Walls of Upstate NY
Wittig Construction
Granted Permission Wittig Construction
Primary Owner Mario Profita
Maria Lasala
Checklist Item CommentsPassed
Building Inspector Notes True please provide permit card and plans that must be onsite during
consruction
Pressure Test True
Pressure Test True
3" Vent Through Roof - 18" min False
Washing Machine Drain 2 inch minimum True
All Return Air Hard Duct Work False
5 psi or 10 ft. above highest conn. for 15 minutes True
Rough Plumbing / Nail Plates True
Duct Testing Outside Conditioned Space False
Shower liner test (2" of water)False
Water Supply Piping True
Duct Insulation - if required in unheated spaces False
Duct work sealed properly False
Cleanout every 100 feet change of direction True
Plumbing Vent Vents in Place False
Air Test Gas Piping 10 psi for 10 Minutes True
Washing Machine Trap: 18"-42" discharge True
Air Head True
Air Head True
50 P.S.I for 15 minutes True
1 ½ inch minimum Drain Size False
Drain Vent True
Permit Card Visible From Road False
August 10, 2023 Page 1 of 1