IM Inspection Worksheet_14-08-2023_13-55-04INSPECTION WORKSHEET (FDTN-027184-2023)
CC-0241-2023Case Number:Case Module:Permit Management
ScheduledInspection Status:Inspection Date:
Building FoundationInspection Type:Inspector:Mark Smith
Job Address:Parcel Number:355 Dix Ave
Queensbury, NY 12804
303.15-1-27
Company Name NameContact Type
Applicant Blueprint Engineering and Desing LLC
Contractor Hunt Companies Inc
Engineer Blueprint Engineering and Desing LLC
Granted Permission Hospitality Syracuse Inc
Primary Owner Hospitality Syracuse Inc
Checklist Item CommentsPassed
Building Inspector Notes False 7/26/23 partial approval for foundation.
-footings approved
8/3/23 partial approval for foundation.
-foundation walls approved.
8/7/23 partial approval of foundation.
2" ridged insulation at interior of foundation walls verified.
8/11/23 partial approval of foundation.
plumbing under slab for sanitary drains and grease trap
approved.
8/14/23 partial approval of foundation
- poly under slab verified.
-hunched area at perimeter of slab verified.
-2" ridged insulation at permieter of slab, and under coolers
verified.
Footing Drain Stone - 12 inch width False
PVC/Cast/Copper/Pex tubing False
Pressure Test False
Foundation / Wallpour True 8/3/23 foundation walls approved
5 psi or 10 ft. above highest conn. for 15 minutes False
Masonry Wall False
Air or head test False
Footing Drain Stone - 6 inches above footing False
Foundation Dampproofing False
Plumbing Under Slab True 8/11/23 plumbing under slab for sanitary drains and grease trap
approved.
Foundation Waterproofing False
Footing Drain Daylight or Sump False
Monolithic Slab False
Footings True 7/26/23 footings approved
Footing Drain stone - 6 mil poly False
Piers False
Backfill Approval True
Rough Grade 6 inch drop within 10 ft.False
August 14, 2023 Page 1 of 2
INSPECTION WORKSHEET (FDTN-027184-2023)
Checklist Item CommentsPassed
Foundation Insulation Interior / Exterior True 8/7/23 2" ridged insulation at interior of foundation walls verified.
-8/14/23 2" ridged insulation verified under slab.
Reinforcement in Place True 8/3/23 foundation walls approved
Reinforcement in Place True 7/26/23 footings approved
Permit Card Visible From Road False
Poly Under Slab True
Footing Dowels or Keyway in place False
August 14, 2023 Page 2 of 2