IM Inspection Worksheet_21-08-2023_14-48-38INSPECTION WORKSHEET (RPLUM-027338-2023)
RC-0539-2022Case Number:Case Module:Permit Management
08/21/2023 PassedInspection Status:Inspection Date:
Rough PlumbingInspection Type:Inspector:Charles Dyer
Job Address:Parcel Number:80 Rockhurst Rd
Queensbury, NY 12804
227.13-2-42
Company Name NameContact Type
Applicant Joseph Sheehan
Architect Rucinski-Hall Architecture
Contractor Vern Edwards
Granted Permission Joseph Sheehan
Primary Owner Joseph Sheehan
Checklist Item CommentsPassed
Building Inspector Notes False
Pressure Test True
Pressure Test True
3" Vent Through Roof - 18" min True
Washing Machine Drain 2 inch minimum True
All Return Air Hard Duct Work True
5 psi or 10 ft. above highest conn. for 15 minutes True
Rough Plumbing / Nail Plates True
Water Supply Piping True
Duct work sealed properly True
Cleanout every 100 feet change of direction True
Plumbing Vent Vents in Place True
Washing Machine Trap: 18"-42" discharge True
Air Head True
Air Head True
50 P.S.I for 15 minutes True
1 ½ inch minimum Drain Size True
Drain Vent True
Permit Card Visible From Road True
August 21, 2023 Page 1 of 1