Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
IM Inspection Worksheet_22-08-2023_15-27-59
INSPECTION WORKSHEET (FDTN-027352-2023) RC-0296-2023Case Number:Case Module:Permit Management 08/22/2023 PassedInspection Status:Inspection Date: Building FoundationInspection Type:Inspector:Charles Dyer Job Address:Parcel Number:98 West Mountain Rd Queensbury, NY 12804 315.6-1-18 Company Name NameContact Type Applicant Cerrone Builders Inc Contractor Cerrone Builders Inc Engineer Vision Engineering Granted Permission Cerrone Builders Inc Primary Owner Cerrone Builders Inc Checklist Item CommentsPassed Building Inspector Notes False Footing Drain Stone - 12 inch width False Foundation / Wallpour True approved Footing Drain Stone - 6 inches above footing False Foundation Dampproofing True Footing Drain Daylight or Sump False Footings True Footing Drain stone - 6 mil poly False Piers True Backfill Approval True backfill approved Rough Grade 6 inch drop within 10 ft.False Reinforcement in Place True 2 rows # 4 horizontally top and bottom Reinforcement in Place True 2 rows # 4... Permit Card Visible From Road True Poly Under Slab True approved 8/22/23 Footing Dowels or Keyway in place True August 22, 2023 Page 1 of 1