IM Inspection Worksheet_24-08-2023_14-27-01INSPECTION WORKSHEET (RPLUM-027389-2023)
CC-0472-2022Case Number:Case Module:Permit Management
08/24/2023 Partial PassInspection Status:Inspection Date:
Rough PlumbingInspection Type:Inspector:Mark Smith
Job Address:Parcel Number:257 Dix Ave
Queensbury, NY 12804
303.15-1-3
Company Name NameContact Type
Applicant GARVEY SISTERS, LLC
Architect Rucinski-Hall Architecture
Contractor Hilltop Construction
Granted Permission GARVEY SISTERS, LLC
Primary Owner GARVEY SISTERS, LLC
Checklist Item CommentsPassed
Building Inspector Notes False 2/1/23 partial approval for rough plumbing
- sanitary drains and vents at kitchen area in mezzanine approved,
this plumbing will need to be rechecked when vent is completed
thru roof
- domestic water supply plumbing for sink in mezzanine kitchen
area verified.
3/15/23 partial approval for rough plumbing
-rough plumbing for bathroom in conference room approved.
Provide as built drawing for this change to approved plan. Page
A-3 of approved plans show a kitchenette in this area. Provide
access to studer vent as discussed on site. Plumbing for sanitary
drains and vents and domestic water supply approved for this
bath room only.
6/14/23 partial approval for rough plumbing
- plumbing for water supply to car wash approved.
- sanitary drains and vents and domestic water supply at
bathroom in break room area approved.
6/23/23 partial approval for rough plumbing
- domestic water supply plumbing, and sanitary drains and vents
at costumer lounge approved.
8/24/23 partial approval for plumbing.
plumbing under slab for floor drains at quick lube area approved.
3" Vent Through Roof - 18" min True
All Return Air Hard Duct Work False
5 psi or 10 ft. above highest conn. for 15 minutes True
Rough Plumbing / Nail Plates True Metal stub framing
Duct Testing Outside Conditioned Space False
Plumbing Under Slab False
Water Supply Piping True
Duct Insulation - if required in unheated spaces False
Duct work sealed properly False
Cleanout every 100 feet change of direction True
Plumbing Vent Vents in Place True
August 24, 2023 Page 1 of 2
INSPECTION WORKSHEET (RPLUM-027389-2023)
Checklist Item CommentsPassed
Air Test Gas Piping 10 psi for 10 Minutes False
Air Head True
Air Head True
50 P.S.I for 15 minutes True
1 ½ inch minimum Drain Size True
Drain Vent True
Permit Card Visible From Road False
August 24, 2023 Page 2 of 2