IM Inspection Worksheet_24-08-2023_15-46-27INSPECTION WORKSHEET (FDTN-027396-2023)
RC-0480-2023Case Number:Case Module:Permit Management
08/24/2023 Partial PassInspection Status:Inspection Date:
Building FoundationInspection Type:Inspector:Charles Dyer
Job Address:Parcel Number:5 Reardon Rd
Queensbury, NY 12804
289.7-1-6
Company Name NameContact Type
Applicant Dana Roberts
Contractor HD Construction
Granted Permission HD Construction
Primary Owner Mark Weidner
Checklist Item CommentsPassed
Building Inspector Notes True A permit has not been issued for this project
Footing Drain Stone - 12 inch width False
PVC/Cast/Copper/Pex tubing False
Pressure Test False
Foundation / Wallpour True
5 psi or 10 ft. above highest conn. for 15 minutes False
Air or head test False
Footing Drain Stone - 6 inches above footing False
Foundation Dampproofing False
Plumbing Under Slab False
Foundation Waterproofing False
Footing Drain Daylight or Sump False
Footings True
Footing Drain stone - 6 mil poly False
Backfill Approval False
Rough Grade 6 inch drop within 10 ft.False
Foundation Insulation Interior / Exterior False
Reinforcement in Place True 2 rows # 4 pinned into existing foundation
Reinforcement in Place True provide 2 rows # 4 bar pinned to existing foundation / it was
observed that side wall caving in please dig out, call when ready
prior to pouring concrete for re-check 8/15/23 verified 2 rows # 4
Permit Card Visible From Road True
Poly Under Slab False
Footing Dowels or Keyway in place True
August 24, 2023 Page 1 of 1