Loading...
IM Inspection Worksheet_24-08-2023_15-46-27INSPECTION WORKSHEET (FDTN-027396-2023) RC-0480-2023Case Number:Case Module:Permit Management 08/24/2023 Partial PassInspection Status:Inspection Date: Building FoundationInspection Type:Inspector:Charles Dyer Job Address:Parcel Number:5 Reardon Rd Queensbury, NY 12804 289.7-1-6 Company Name NameContact Type Applicant Dana Roberts Contractor HD Construction Granted Permission HD Construction Primary Owner Mark Weidner Checklist Item CommentsPassed Building Inspector Notes True A permit has not been issued for this project Footing Drain Stone - 12 inch width False PVC/Cast/Copper/Pex tubing False Pressure Test False Foundation / Wallpour True 5 psi or 10 ft. above highest conn. for 15 minutes False Air or head test False Footing Drain Stone - 6 inches above footing False Foundation Dampproofing False Plumbing Under Slab False Foundation Waterproofing False Footing Drain Daylight or Sump False Footings True Footing Drain stone - 6 mil poly False Backfill Approval False Rough Grade 6 inch drop within 10 ft.False Foundation Insulation Interior / Exterior False Reinforcement in Place True 2 rows # 4 pinned into existing foundation Reinforcement in Place True provide 2 rows # 4 bar pinned to existing foundation / it was observed that side wall caving in please dig out, call when ready prior to pouring concrete for re-check 8/15/23 verified 2 rows # 4 Permit Card Visible From Road True Poly Under Slab False Footing Dowels or Keyway in place True August 24, 2023 Page 1 of 1