Loading...
IM Inspection Worksheet_25-08-2023_14-27-40INSPECTION WORKSHEET (FDTN-027428-2023) RC-0197-2023Case Number:Case Module:Permit Management 08/25/2023 Partial PassInspection Status:Inspection Date: Building FoundationInspection Type:Inspector:Mark Smith Job Address:Parcel Number:443 Lockhart Mountain Rd Lake George, NY 12845 252.-1-28.2 Company Name NameContact Type Applicant Patrick Gavin-Brynes Architect Miller Designs Granted Permission Patrick Gavin-Brynes Primary Owner Patrick Gavin-Brynes Checklist Item CommentsPassed Building Inspector Notes True not ready / call when formed up 8/25/23 partial approval for foundation. 2"ridged insulation at the interior of frost walls verified. Ok to back fill. Footing Drain Stone - 12 inch width False PVC/Cast/Copper/Pex tubing False Pressure Test False Foundation / Wallpour True approved 8/21/23 5 psi or 10 ft. above highest conn. for 15 minutes False Air or head test False Footing Drain Stone - 6 inches above footing False Foundation Dampproofing False Plumbing Under Slab False Foundation Waterproofing False Footing Drain Daylight or Sump False Footings True approved Footing Drain stone - 6 mil poly False Backfill Approval True 8/25/23 partial approval for foundation. 2"ridged insulation at the interior of frost walls verified. Ok to back fill Rough Grade 6 inch drop within 10 ft.False Foundation Insulation Interior / Exterior True 8/25/23 partial approval for foundation. 2"ridged insulation at the interior of frost walls verified. Ok to back fill Reinforcement in Place True 2 rows # 4 Reinforcement in Place True 2 rows #4 Permit Card Visible From Road True Poly Under Slab False Footing Dowels or Keyway in place True into ledge August 25, 2023 Page 1 of 1