Loading...
IM Inspection Worksheet_28-08-2023_08-01-05INSPECTION WORKSHEET (SEP-027439-2023) SEP-0403-2023Case Number:Case Module:Permit Management 08/28/2023 PassedInspection Status:Inspection Date: SepticInspection Type:Inspector:Charles Dyer Job Address:Parcel Number:36 Russell Harris Rd Queensbury, NY 12804 239.8-1-2 Company Name NameContact Type Applicant IBS Septic Contractor IBS Septic Engineer Wales Engineering Granted Permission JOHN MCDOUGALL Primary Owner JOHN MCDOUGALL Checklist Item CommentsPassed Building Inspector Notes True Soil Type: Sand True Size of Stone False N/A Final Electrical True Waterline separation distance True Building to Tank True 4" SCHD 40 [Provide extension collar if Yes]True Tank to Distribution Box True 2" SCHD 80 force main to 4" SDR 35 Opening Sealed:True 90% alarm level activates True End Cap True Absorbtion Fields: Total Length True Eljen matts / 3 rows at 36 ft = 108 ft Septic system field above flood plain True Foundation to Tank True Summer camp sits on piers Engineer Report and As-Built True please provide engineer asbuilt / received 8/25 Location of system on property True Inlet & Outlet manholes 12"+ below grade True Type of Water: Municipal / Well Water True Lake George Locations / Separations True See Engineer specs Depth of Trenches True roughly 7+inches atop 12 inches washed sand Length of Each Trench True 36 ft System Use Status True Conforms as per Plot Plan False septic / pump tank placed different from site plan / D box on south end of field other then north end according to site plan. Size of tank True 1500 gallon septic plastic fiber tank / 500 gallon plastic fiber pump tank Distribution box to Field / Pit True 4 " SDR 35 perforated Foundation to Absorption True See specs InletOutlet Pipes & Baffles True 50% alarm level activates True August 28, 2023 Page 1 of 1