IM Inspection Worksheet_28-08-2023_11-44-57INSPECTION WORKSHEET (BINS-027452-2023)
RC-0553-2020Case Number:Case Module:Permit Management
08/28/2023 Partial PassInspection Status:Inspection Date:
Building InsulationInspection Type:Inspector:Mark Smith
Job Address:Parcel Number:5 Palmer Dr
Queensbury, NY 12804
316.17-1-4
Company Name NameContact Type
Applicant Brian Hayward
Granted Permission Brian Hayward
Primary Owner Karen Hayward
Brian Hayward
Checklist Item CommentsPassed
Zip exterior sheathing, nailing & taping True
Building Inspector Notes False 8/16/23 partial approval of insulation.
- thermal insulation at second floor walls and ceiling only
approved.
R 49 @ ceiling, R 23 @ walls
8/28/23 partial approval for insulation.
-insulation at garage exterior walls and ceiling approved.
R 19 in walls with 1/2 ridged insolation continuous, R 30 in ceiling
with 1/2 ridged insolation continuous.
U Factors = .3 cfm for windows, .5 cfm for doors False
Tub Shower R-20 with Vapor Barrier False
Exterior wall outlets sealed True
All Return Air Hard Duct Work False
Duct work sealed properly / No duct tape False
Duct Testing Outside Conditioned Space True
House Wrap Taped at all Seams False
Door / Window Sealed (No Insulation)True
Air Seal Outside Penetrations False
All Ductwork Sealed Return and Supply False
Air Barrier behind Knee Walls False
Blower Door Test False
Duct Insulation - if required in unheated spaces False
Combustion Air Supply for Furnace False
Window Sealing True
Duct Blaster Test for duct work, R-8, unhtd spaces False
Permit Card Visible From Road True
Proper Vent, Attic Vent True
Insulation ResCheck ComCheck True R 49 @ ceilings, R 23 @ walls, second floor
August 28, 2023 Page 1 of 1