Loading...
IM Inspection Worksheet_29-08-2023_11-46-39INSPECTION WORKSHEET (SEP-027477-2023) SEP-0590-2022Case Number:Case Module:Permit Management 08/29/2023 PassedInspection Status:Inspection Date: SepticInspection Type:Inspector:Charles Dyer Job Address:Parcel Number:61 Seelye Rd Queensbury, NY 12804 227.17-1-32 Company Name NameContact Type Applicant DARWIN DELAPPA Contractor Chris Crandall Engineer Environmental Design Partnership (EDP) Granted Permission Cindy Delappa Primary Owner DARWIN DELAPPA Checklist Item CommentsPassed Building Inspector Notes False Soil Type: Sand True Size of Stone False N/A washed sand Final Electrical True please provide final electric / received 8/14/23 Waterline separation distance True Building to Tank True 4" SCHD 40 [Provide extension collar if Yes]False Tank to Distribution Box True 1 1/2" force main to manifold Opening Sealed:True 90% alarm level activates True End Cap True Absorbtion Fields: Total Length True Eljen pressure trenchs / 2 @ 32 ft= 64 ft Septic system field above flood plain True Foundation to Tank True 10 ft Engineer Report and As-Built True please provide engineer asbuilt / received Sump pump not connected to septic system False Location of system on property False see specs Inlet & Outlet manholes 12"+ below grade True at inlet Water softener not connected to septic system False Type of Water: Municipal / Well Water True Lake George Locations / Separations True Depth of Trenches True 14"- 16" Length of Each Trench True Eljen pressure trenches / 2 @ 32 ft= 64 ft System Use Status True Conforms as per Plot Plan False position of tanks changed from what's on plot Size of tank True 1000 gallon septic / 1000 gallon pump chamber Distribution box to Field / Pit True 1 1/2" with drilled holes 8' oc into 4" sewer and drain perforated Foundation to Absorption True 20 ft InletOutlet Pipes & Baffles True August 29, 2023 Page 1 of 2 INSPECTION WORKSHEET (SEP-027477-2023) Checklist Item CommentsPassed 50% alarm level activates True August 29, 2023 Page 2 of 2