IM Inspection Worksheet_29-08-2023_13-29-09INSPECTION WORKSHEET (FDTN-027465-2023)
AST-0511-2023Case Number:Case Module:Permit Management
08/29/2023 Partial PassInspection Status:Inspection Date:
Building FoundationInspection Type:Inspector:Mark Smith
Job Address:Parcel Number:289 Bay Rd
Queensbury, NY 12804
302.8-1-3
Company Name NameContact Type
Applicant Rozell Industries Inc.
Contractor Rozell Industries Inc.
Engineer Haanen Engineering
Granted Permission CR Bard Inc USCI Div
Primary Owner CR Bard Inc USCI Div
Checklist Item CommentsPassed
Building Inspector Notes False 8/29/23 partial approval for foundation.
-footings approved.
Footing Drain Stone - 12 inch width False
PVC/Cast/Copper/Pex tubing False
Pressure Test False
Foundation / Wallpour False
5 psi or 10 ft. above highest conn. for 15 minutes False
Masonry Wall False
Air or head test False
Footing Drain Stone - 6 inches above footing False
Foundation Dampproofing False
Plumbing Under Slab False
Foundation Waterproofing False
Footing Drain Daylight or Sump False
Monolithic Slab False
Footings False 8/29/23 partial approval for foundation.
-footings approved.
Footing Drain stone - 6 mil poly False
Piers False
Backfill Approval False
Rough Grade 6 inch drop within 10 ft.False
Foundation Insulation Interior / Exterior False
Reinforcement in Place False 8/29/23 partial approval for foundation.
-footings approved.
Reinforcement in Place False
Permit Card Visible From Road True
Poly Under Slab False
Footing Dowels or Keyway in place False
August 29, 2023 Page 1 of 1