Loading...
IM Inspection Worksheet_30-08-2023_10-41-19INSPECTION WORKSHEET (FDTN-027510-2023) RC-0533-2022Case Number:Case Module:Permit Management 08/30/2023 Partial PassInspection Status:Inspection Date: Building FoundationInspection Type:Inspector:Charles Dyer Job Address:Parcel Number:6 Alessia Dr Queensbury, NY 12804 315.10-1-45 Company Name NameContact Type Applicant Cerrone Builders Inc Contractor Cerrone Builders Inc Granted Permission Cerrone Builders Inc Primary Owner Cerrone Builders Inc Checklist Item CommentsPassed Building Inspector Notes False Footing Drain Stone - 12 inch width False PVC/Cast/Copper/Pex tubing False Pressure Test False Foundation / Wallpour True for frost wall / with vertical dowels one row # 4 TOW / 8/18 /23 for remainder of foundation 5 psi or 10 ft. above highest conn. for 15 minutes False Air or head test False Footing Drain Stone - 6 inches above footing False Foundation Dampproofing True approved Plumbing Under Slab False Foundation Waterproofing False Footing Drain Daylight or Sump False Footings True approved Footing Drain stone - 6 mil poly False Piers True Backfill Approval True Rough Grade 6 inch drop within 10 ft.False Foundation Insulation Interior / Exterior False Reinforcement in Place True 2 rows # 4 Reinforcement in Place True 2 rows # 4 horizontally Permit Card Visible From Road True Poly Under Slab True approved 8/30/23 August 30, 2023 Page 1 of 1