Loading...
IM Inspection Worksheet_31-08-2023_13-40-30INSPECTION WORKSHEET (SEP-027533-2023) RC-0413-2022Case Number:Case Module:Permit Management 08/31/2023 Partial PassInspection Status:Inspection Date: SepticInspection Type:Inspector:Charles Dyer Job Address:Parcel Number:32 Forest Rd Lake George, NY 12845 226.19-1-41 Company Name NameContact Type Applicant RONALD SEGULJIC Contractor Dufford Construction Designer Williams & Williams Designers Inc. Granted Permission RONALD SEGULJIC Primary Owner RONALD SEGULJIC Checklist Item CommentsPassed Building Inspector Notes True for septic alteration ETU Maintenance Contract provided False N/A Size of Stone False N/A Waterline separation distance True Building to Tank True 4" SCHD 40 [Provide extension collar if Yes]False Tank to Distribution Box True 4" SDR 35 Opening Sealed:True Soil Type: Clay False soils are of loamy sand / Eljen matts sit atop 6+" washed sand End Cap True Absorbtion Fields: Total Length True 80 ft / 4 laterals with 5 Eljen modules each Septic system field above flood plain True Foundation to Tank True 10+ ft / no basement Engineer Report and As-Built False please provide engineer asbuilt Location of system on property True Inlet & Outlet manholes 12"+ below grade False Type of Water: Municipal / Well Water True well Locations / Separations True Well separation distance True See variance / septic tank 50ft from well / field 85+ ft Depth of Trenches True 6+" Length of Each Trench True 20 ft System Use Status True Conforms as per Plot Plan True Size of tank True 1000 precast Distribution box to Field / Pit True 4" SCHD 20 perforated Foundation to Absorption True 20+ft InletOutlet Pipes & Baffles True August 31, 2023 Page 1 of 1