Loading...
IM Inspection Worksheet_01-09-2023_10-54-38INSPECTION WORKSHEET (FDTN-027514-2023) AST-0511-2023Case Number:Case Module:Permit Management 09/01/2023 Partial PassInspection Status:Inspection Date: Building FoundationInspection Type:Inspector:Mark Smith Job Address:Parcel Number:289 Bay Rd Queensbury, NY 12804 302.8-1-3 Company Name NameContact Type Applicant Rozell Industries Inc. Contractor Rozell Industries Inc. Engineer Haanen Engineering Granted Permission CR Bard Inc USCI Div Primary Owner CR Bard Inc USCI Div Checklist Item CommentsPassed Building Inspector Notes False 8/29/23 partial approval for foundation. -footings approved. 9/1/23 partial approval for foundation. -foundation walls approved. Footing Drain Stone - 12 inch width False Foundation / Wallpour True 9/1/23 partial approval for foundation. Footing Drain Stone - 6 inches above footing False Foundation Dampproofing False Foundation Waterproofing False Footing Drain Daylight or Sump False Footings False 8/29/23 partial approval for foundation. -footings approved. Footing Drain stone - 6 mil poly False Backfill Approval False Rough Grade 6 inch drop within 10 ft.False Reinforcement in Place True 9/1/23 partial approval for foundation. Reinforcement in Place False 8/29/23 partial approval for foundation. -footings approved. Permit Card Visible From Road True Poly Under Slab False Footing Dowels or Keyway in place True September 01, 2023 Page 1 of 1