IM Inspection Worksheet_01-09-2023_10-54-38INSPECTION WORKSHEET (FDTN-027514-2023)
AST-0511-2023Case Number:Case Module:Permit Management
09/01/2023 Partial PassInspection Status:Inspection Date:
Building FoundationInspection Type:Inspector:Mark Smith
Job Address:Parcel Number:289 Bay Rd
Queensbury, NY 12804
302.8-1-3
Company Name NameContact Type
Applicant Rozell Industries Inc.
Contractor Rozell Industries Inc.
Engineer Haanen Engineering
Granted Permission CR Bard Inc USCI Div
Primary Owner CR Bard Inc USCI Div
Checklist Item CommentsPassed
Building Inspector Notes False 8/29/23 partial approval for foundation.
-footings approved.
9/1/23 partial approval for foundation.
-foundation walls approved.
Footing Drain Stone - 12 inch width False
Foundation / Wallpour True 9/1/23 partial approval for foundation.
Footing Drain Stone - 6 inches above footing False
Foundation Dampproofing False
Foundation Waterproofing False
Footing Drain Daylight or Sump False
Footings False 8/29/23 partial approval for foundation.
-footings approved.
Footing Drain stone - 6 mil poly False
Backfill Approval False
Rough Grade 6 inch drop within 10 ft.False
Reinforcement in Place True 9/1/23 partial approval for foundation.
Reinforcement in Place False 8/29/23 partial approval for foundation.
-footings approved.
Permit Card Visible From Road True
Poly Under Slab False
Footing Dowels or Keyway in place True
September 01, 2023 Page 1 of 1