Loading...
IM Inspection Worksheet_05-09-2023_15-19-21INSPECTION WORKSHEET (BINS-027590-2023) CC-0374-2023Case Number:Case Module:Permit Management ScheduledInspection Status:Inspection Date: Building InsulationInspection Type:Inspector:Mark Smith Job Address:Parcel Number:1012 State Rte 9 Queensbury, NY 12804 296.13-1-62 Company Name NameContact Type Applicant John LaRock Granted Permission Peter Shabat Primary Owner Peter Shabat Checklist Item CommentsPassed Zip exterior sheathing, nailing & taping False Building Inspector Notes False 8/7/23 partial approval of insulation. -insulation at north end of kitchen where sheet rock was removed due to water dammage from roof leaks verified. R 21 U Factors = .3 cfm for windows, .5 cfm for doors False Insulation under bow & bay window(s)False Tub Shower R-20 with Vapor Barrier False Exterior wall outlets sealed False All Return Air Hard Duct Work False Duct work sealed properly / No duct tape False Duct Testing Outside Conditioned Space False House Wrap Taped at all Seams False Door / Window Sealed (No Insulation)False Air Seal Outside Penetrations False All Ductwork Sealed Return and Supply False Air Barrier behind Knee Walls False Blower Door Test False Duct Insulation - if required in unheated spaces False 15 min thermal barrier/intumescent paint applied False Tyvek or Similar Exterior Sealant False Combustion Air Supply for Furnace False Window Sealing False Duct Blaster Test for duct work, R-8, unhtd spaces False Permit Card Visible From Road False Proper Vent, Attic Vent False Insulation ResCheck ComCheck False September 05, 2023 Page 1 of 1