IM Inspection Worksheet_07-09-2023_12-48-41INSPECTION WORKSHEET (FDTN-027619-2023)
AST-0511-2023Case Number:Case Module:Permit Management
09/07/2023 Partial PassInspection Status:Inspection Date:
Building FoundationInspection Type:Inspector:Mark Smith
Job Address:Parcel Number:289 Bay Rd
Queensbury, NY 12804
302.8-1-3
Company Name NameContact Type
Applicant Rozell Industries Inc.
Contractor Rozell Industries Inc.
Engineer Haanen Engineering
Granted Permission CR Bard Inc USCI Div
Primary Owner CR Bard Inc USCI Div
Checklist Item CommentsPassed
Building Inspector Notes False 8/29/23 partial approval for foundation.
-footings approved.
9/1/23 partial approval for foundation.
-foundation walls approved.
9/7/23 partial approval for foundation.
- rebar at slab verified.
Foundation / Wallpour True 9/1/23 partial approval for foundation.
Footings False 8/29/23 partial approval for foundation.
-footings approved.
Backfill Approval True
Rough Grade 6 inch drop within 10 ft.False
Reinforcement in Place False 8/29/23 partial approval for foundation.
-footings approved.
Reinforcement in Place True 9/1/23 partial approval for foundation.
Permit Card Visible From Road True
Poly Under Slab False 9/7/23 partial approval for foundation.
Footing Dowels or Keyway in place True
September 07, 2023 Page 1 of 1