Loading...
IM Inspection Worksheet_07-09-2023_12-48-41INSPECTION WORKSHEET (FDTN-027619-2023) AST-0511-2023Case Number:Case Module:Permit Management 09/07/2023 Partial PassInspection Status:Inspection Date: Building FoundationInspection Type:Inspector:Mark Smith Job Address:Parcel Number:289 Bay Rd Queensbury, NY 12804 302.8-1-3 Company Name NameContact Type Applicant Rozell Industries Inc. Contractor Rozell Industries Inc. Engineer Haanen Engineering Granted Permission CR Bard Inc USCI Div Primary Owner CR Bard Inc USCI Div Checklist Item CommentsPassed Building Inspector Notes False 8/29/23 partial approval for foundation. -footings approved. 9/1/23 partial approval for foundation. -foundation walls approved. 9/7/23 partial approval for foundation. - rebar at slab verified. Foundation / Wallpour True 9/1/23 partial approval for foundation. Footings False 8/29/23 partial approval for foundation. -footings approved. Backfill Approval True Rough Grade 6 inch drop within 10 ft.False Reinforcement in Place False 8/29/23 partial approval for foundation. -footings approved. Reinforcement in Place True 9/1/23 partial approval for foundation. Permit Card Visible From Road True Poly Under Slab False 9/7/23 partial approval for foundation. Footing Dowels or Keyway in place True September 07, 2023 Page 1 of 1