Loading...
IM Inspection Worksheet_08-09-2023_12-54-29INSPECTION WORKSHEET (FDTN-027627-2023) RC-0458-2023Case Number:Case Module:Permit Management 09/08/2023 Partial PassInspection Status:Inspection Date: Building FoundationInspection Type:Inspector:Charles Dyer Job Address:Parcel Number:29 Revere Rd Queensbury, NY 12804 308.18-1-45.2 Company Name NameContact Type Applicant Cerrone Builders Inc Contractor Cerrone Builders Inc Engineer Vision Engineering Granted Permission Cerrone Builders Inc Primary Owner BRIAN LITTLE Checklist Item CommentsPassed Building Inspector Notes False Footing Drain Stone - 12 inch width False PVC/Cast/Copper/Pex tubing False Pressure Test False Foundation / Wallpour False 5 psi or 10 ft. above highest conn. for 15 minutes False Masonry Wall False Air or head test False Footing Drain Stone - 6 inches above footing False Foundation Dampproofing False Plumbing Under Slab False Foundation Waterproofing False Footing Drain Daylight or Sump False Footings True approved Footing Drain stone - 6 mil poly False Piers True Backfill Approval False Rough Grade 6 inch drop within 10 ft.False Foundation Insulation Interior / Exterior False Reinforcement in Place True 2 #4s continuous Reinforcement in Place False Permit Card Visible From Road True Poly Under Slab False Footing Dowels or Keyway in place True wet sticking September 08, 2023 Page 1 of 1