Loading...
IM Inspection Worksheet_11-09-2023_14-54-12INSPECTION WORKSHEET (ASFINAL-027622-2023) AST-0521-2022Case Number:Case Module:Permit Management 09/11/2023 FailedInspection Status:Inspection Date: Accessory Structure FinalInspection Type:Inspector:Charles Dyer Job Address:Parcel Number:14 Highview Rd Lake George, NY 12845 239.15-1-15 Company Name NameContact Type Applicant Redbud Development Inc Geff Redick Contractor Redbud Development Inc Geff Redick Engineer Saratoga Engineering & Design Granted Permission JACK LYNCH Primary Owner JACK LYNCH Alice Lynch Checklist Item CommentsPassed Building Inspector Notes True Please contact building department to set up for final inspection and or renew permit. 9/11/23 Site Plan / Variance required False Wood deck: 2'+ from grade dia bracing required False Crawl 18 x 24 access, 1 sq. ft.-150 sq. ft. vents False Engineer or Architect Approval False Blower Door Test Certification False Fin Elect; Energy Saving Light Bulbs 90 Percent False OK to Issue C/O False Guard at deck, porches 36" or more False 5/8" Type X with Living Space Above False 4+ Deck Joist Ledger Connections-24" From Ends False 20 Minute Fire Door/Self-Closing Hardware False 1/2" Gypsum or House Wall and Gable False Deck (post beam connections hex head bolts)False Okay To Issue CC False Handrail 4 or more risers False Deck Ledger-Bolted per Code False September 11, 2023 Page 1 of 1