IM Inspection Worksheet_11-09-2023_14-54-12INSPECTION WORKSHEET (ASFINAL-027622-2023)
AST-0521-2022Case Number:Case Module:Permit Management
09/11/2023 FailedInspection Status:Inspection Date:
Accessory Structure FinalInspection Type:Inspector:Charles Dyer
Job Address:Parcel Number:14 Highview Rd
Lake George, NY 12845
239.15-1-15
Company Name NameContact Type
Applicant Redbud Development Inc Geff Redick
Contractor Redbud Development Inc Geff Redick
Engineer Saratoga Engineering & Design
Granted Permission JACK LYNCH
Primary Owner JACK LYNCH
Alice Lynch
Checklist Item CommentsPassed
Building Inspector Notes True Please contact building department to set up for final inspection
and or renew permit. 9/11/23
Site Plan / Variance required False
Wood deck: 2'+ from grade dia bracing required False
Crawl 18 x 24 access, 1 sq. ft.-150 sq. ft. vents False
Engineer or Architect Approval False
Blower Door Test Certification False
Fin Elect; Energy Saving Light Bulbs 90 Percent False
OK to Issue C/O False
Guard at deck, porches 36" or more False
5/8" Type X with Living Space Above False
4+ Deck Joist Ledger Connections-24" From Ends False
20 Minute Fire Door/Self-Closing Hardware False
1/2" Gypsum or House Wall and Gable False
Deck (post beam connections hex head bolts)False
Okay To Issue CC False
Handrail 4 or more risers False
Deck Ledger-Bolted per Code False
September 11, 2023 Page 1 of 1