IM Inspection Worksheet_11-09-2023_15-47-34INSPECTION WORKSHEET (COMFIN-027640-2023)
CC-0081-2023Case Number:Case Module:Permit Management
ScheduledInspection Status:Inspection Date:
Commercial Final InspectionInspection Type:Inspector:Mark Smith
Job Address:Parcel Number:920 State Rte 9
Queensbury, NY 12804
296.17-1-45
Company Name NameContact Type
Applicant Excel Engineering Inc
Business Name wellNOW
Contractor Franco Construction Services LLC
Engineer Excel Engineering Inc
Granted Permission Queensbury Realty Partners LLC
Primary Owner Queensbury Realty Partners LLC
Checklist Item CommentsPassed
Low flow toilet 1.3 gal/flushing cycle False
Handicapped Ramps False
Final Survey False
Building Inspector Notes False
Bldg Access All Sides 20ft Drivable Surface False
H/C rear grab bar 36" with 24" to open side False
Backflow Preventors where required False
Public Toilet Room Handicapped Accessible False
Exterior timer for exterior lighting False
Hydraulic Elevators: Oil Seperator REQUIRED False
Firewalls, 2 Hr, 3 Hr / Fire Dampers / Fire Doors False
Handicap parking striping False
Boiler/Furnace Enclosurer Fire Ext System False
Int/Ext Balusters 4 inch Spacing Platform Decks False
Bldg Num or Tenant Address on Bld or Drive False
Ramps: 12" extension top & bottom False
Attic Access Insulation = Attic R- Value False
Individual storage units 5% of each type False
Gas Shut-off Exposed & Regulator 12" min abv grd False
Water Fountain or Cooler False
As-built Septic System Layout Required False
Public Sewer Sign-Off False
Bollard Protection:4' on ctr/3' abv grd, gas meter False
Handicapped Service Counters 34 inch False
Gas Furnace Shut Off False
12" beyond top & bottom False
Int/Ext Guardrails 42 inch Platform Decks False
H/C side & rear grab bars 36" above floor False
September 11, 2023 Page 1 of 3
INSPECTION WORKSHEET (COMFIN-027640-2023)
Checklist Item CommentsPassed
HVAC air balancing report False
H/C sinks 34" above floor False
Hydraulic Elevators: Non-comb. Plumbing REQUIRED False
Wood deck: 2'+ from grade dia bracing required False
Low Water Shut Off for Boilers False
H/C 18" minimum vertical grab bar False
Engineer or Architect Approval False
Ramps: 6" or more need handrails False
Hot water drain pan to indirect waste False
Chimney Rain Cap Installed False
Foam in basement/attics covered w/thermal barrier False
Oil Furnace Shut-Off at Entrance to Furnace Area False
H/C grab bar: 42" side, 12" from center False
Ceiling Fire Stopping, 3,000 sq. ft. Wood Frame False
Plumbing Vent Through Roof/Roof complete False
OK to Issue C/O False
Step risers: riser 7" & treads 11"False
¾ Hour Corridor Doors & Closers False
Propane Tank: Proper Setback from Prop Line/Struct False
Stair rail 34"–38": both sides of stairway False
Doors 36 inch wLever Hand Panic Hardware, if req False
Final Electrical / Flex Gas Piping Bonded False
Jack posts in basement lagged at top and bottom False
Attic Access 30 x 20 x 30 (h)False
Bottled or cooler water provided False
Chimney / B Vent / Direct Vent Location False
Handicapped Units False
Smoke Vents Or Fan, if required False
Attic Access Gasketed False
Electronic as-builts False
Ramps: 4" toe kick each side of ramp False
Relief Valve ,Heat Trap/Water Temp 110 deg or less False
H/C vertical grab bar 39" from floor and corner False
Blower Door Test False
Exits At Grade Or Platform 36 (w) x 44 (l)False
Special Inspections False
Floor Bathroom Watertight Other Floors Okay False
Vestibules for Exit doors greater than 3000 sq. ft False
Crawl space/knee wall access insulated & gasketed False
CSST/other piping in conduit if buried,if required False
Ext Finish /Grade Complete/6 in 10ft or Equivalent False
Stockroom /Storage/Receiving/Shipping Room False
September 11, 2023 Page 2 of 3
INSPECTION WORKSHEET (COMFIN-027640-2023)
Checklist Item CommentsPassed
Occupancy sensor lighting control False
Universal Symbol of Access displayed False
Bollard Protection: 15" footings & 3' below grade False
H/C mirrors 40" above floor False
Handicapped water cooler installed False
Pull down stairs boxed out and insulated False
Elevator Operation and Signage Shaft Sealed False
HVAC Vent Terminal 10' from Lot Line & Openings False
OK to Issue Temporary C/O False
Elevator Hoistways Pressurized False
Active Listening System and Signage Assembly Space False
Handicapped Bath/Parking Lot Signage False
Outside Spigots have Air Gap False
H/C toilet flush handle on open side False
Site Plan Variance required False
September 11, 2023 Page 3 of 3