IM Inspection Worksheet_14-09-2023_14-41-33INSPECTION WORKSHEET (COMFIN-027719-2023)
CC-0265-2023Case Number:Case Module:Permit Management
09/14/2023 PassedInspection Status:Inspection Date:
Commercial Final InspectionInspection Type:Inspector:Mark Smith
Job Address:Parcel Number:1424 State Rte 9
Lake George, NY 12845
288.16-1-1
Company Name NameContact Type
Architect Kenneth Park Architect
Contractor Herman Stewart Construction & Development Inc
Granted Permission Columbia Sportswear Co
Primary Owner Lake George Northway LLC
Checklist Item CommentsPassed
Low flow toilet 1.3 gal/flushing cycle True
Building Inspector Notes True 9/11/23 commercial final inspection not approved, please
address the items listed below and call for recheck when ready.
-please submit a letter of substantial completion from design
architect.
- provide air balancing report.
- final electrical inspection
- complete interior work at cash wrap and racking for store
merchandise.
- install grab bars at rest room as disused on site.
- provide electronic as built drawings
9/14/23 final inspection for commercial renovations approved
- all items listed above have been completed/received
Bldg Access All Sides 20ft Drivable Surface True
H/C rear grab bar 36" with 24" to open side True
Public Toilet Room Handicapped Accessible True
Exterior timer for exterior lighting True
Handicap parking striping True
Bldg Num or Tenant Address on Bld or Drive True
Handicapped Service Counters 34 inch True
Gas Furnace Shut Off True
H/C side & rear grab bars 36" above floor True
HVAC air balancing report True
H/C sinks 34" above floor True
H/C 18" minimum vertical grab bar True
Hot water drain pan to indirect waste True
H/C grab bar: 42" side, 12" from center True
September 14, 2023 Page 1 of 2
INSPECTION WORKSHEET (COMFIN-027719-2023)
Checklist Item CommentsPassed
OK to Issue C/O True 9/11/23 commercial final inspection not approved, please
address the items listed below and call for recheck when ready.
-please submit a letter of substantial completion from design
architect.
- provide air balancing report.
- final electrical inspection
- complete interior work at cash wrap and racking for store
merchandise.
- install grab bars at rest room as disused on site.
- provide electronic as built drawings
9/14/23 final inspection for commercial renovations approved
- all items listed above have been completed/received
HVAC Vent Terminal 10' from Lot Line & Openings True
Universal Symbol of Access displayed True
Final Electrical / Flex Gas Piping Bonded True
Plumbing Vent Through Roof/Roof complete True
Relief Valve ,Heat Trap/Water Temp 110 deg or less True
Electronic as-builts True
Handicapped Bath/Parking Lot Signage True
Exits At Grade Or Platform 36 (w) x 44 (l)True
H/C mirrors 40" above floor True
H/C toilet flush handle on open side True
OK to Issue Temporary C/O False
H/C vertical grab bar 39" from floor and corner True
Ext Finish /Grade Complete/6 in 10ft or Equivalent True
Occupancy sensor lighting control True
Doors 36 inch wLever Hand Panic Hardware, if req True
Floor Bathroom Watertight Other Floors Okay True
September 14, 2023 Page 2 of 2