IM Inspection Worksheet_13-09-2023_12-52-57INSPECTION WORKSHEET (BINS-027677-2023)
RC-0108-2022Case Number:Case Module:Permit Management
09/13/2023 Partial PassInspection Status:Inspection Date:
Building InsulationInspection Type:Inspector:Charles Dyer
Job Address:Parcel Number:211 Assembly Point Rd
Lake George, NY 12845
226.19-2-18
Company Name NameContact Type
Applicant Erin Steinbach
Architect AJA Architecture & Planning
Contractor Larmon House Movers Inc
Granted Permission Francis Steinbach
Erin Steinbach
Primary Owner Francis Steinbach
Erin Steinbach
Checklist Item CommentsPassed
Zip exterior sheathing, nailing & taping True R-6
Building Inspector Notes True partial insulation / upper level only
U Factors = .3 cfm for windows, .5 cfm for doors True
Tub Shower R-20 with Vapor Barrier False
Exterior wall outlets sealed True
All Return Air Hard Duct Work False
Duct work sealed properly / No duct tape True
Duct Testing Outside Conditioned Space False
House Wrap Taped at all Seams False
Door / Window Sealed (No Insulation)True
Air Seal Outside Penetrations True
All Ductwork Sealed Return and Supply False
Air Barrier behind Knee Walls False
Blower Door Test False N/A
Duct Insulation - if required in unheated spaces False
15 min thermal barrier/intumescent paint applied True
Tyvek or Similar Exterior Sealant True
Combustion Air Supply for Furnace False
Window Sealing True
Duct Blaster Test for duct work, R-8, unhtd spaces False
Permit Card Visible From Road False
Proper Vent, Attic Vent True
Insulation ResCheck ComCheck True R 49+ at roof deck / R 6 zip + R 15 at cavity=R21 at walls
September 13, 2023 Page 1 of 1