Loading...
IM Inspection Worksheet_18-09-2023_15-28-04INSPECTION WORKSHEET (RESFINAL-027748-2023) RC-0134-2021Case Number:Case Module:Permit Management 09/18/2023 Partial PassInspection Status:Inspection Date: Residential Final InspectionInspection Type:Inspector:Charles Dyer Job Address:Parcel Number:53 Assembly Point Rd Lake George, NY 12845 239.12-2-16 Company Name NameContact Type Applicant William Bosy Architect Mark Patrizio Contractor Frank Witz Enterprises Inc Valente Builders Inc Electrical Contractor Einzig Electric Engineer Mark Bergeron Excavation Contractor Ruben Ellsworth Granted Permission William Bosy Primary Owner William Bosy Kathleen Bosy Checklist Item CommentsPassed Low flow toilet 1.3 gal/flushing cycle True Bathroom Fans, if no window True 3" Plumbing Vent through roof minimum 18 inch True Grade away from foundation: 6" down, 10' out False Final Survey Plot Plan False Provide final survey Window guards req:<2' above floor/6' above grade True Interior privacy/trim/doors/main entrance 36 True Backflow Preventors where required True Basement wall insulation R- value verified True cover with FSK paper Emergency egress below grade False N/A crawl area Fuel Tanks above flood plain elevation True Intake Openings True Safety glazing: w/in 5' of tub/shower True Site Plan / Variance required False Complete site development Attic Access Insulation = Attic R- Value False Platform at all exterior doors True Fireblocking at fl joist 80 s.f. or less False Garage Floor Pitched False Wood deck: 2'+ from grade dia bracing required True Inter Connected True Arc Fault Breaker Habitable Spaces False Energy Sticker on Elec. Panel:R-Val. & Heating Sys False Furnace/Hot Water Heater operating False Hot water drain pan to indirect waste False N/A September 18, 2023 Page 1 of 3 INSPECTION WORKSHEET (RESFINAL-027748-2023) Checklist Item CommentsPassed Fresh Air Intake True Chimney Rain Cap Installed True Foam in basement/attics covered w/thermal barrier False N/A Outside every bedroom area True Blower Door Test Certification False provide blower door test results / under 3 ACH's (air changes per hour) Fin Elect; Energy Saving Light Bulbs 90 Percent False Provide final electric Gas Log In Sealed or Glass Enclosure True OK to Issue C/O False Truss ID Signage Installed at Electrical Meter False Range Hood 400+ cfm-Fresh Air REQUIRED False 4 inch Building Number Address visible from road False Provide house #'s visible from road HVAC Vent Terminal 10' from Lot Line & Openings True Attic Access Gasketed False Jack posts in basement lagged at top and bottom True Guard at deck, porches 36" or more True 6" clearance to sill plate True Propane Tank: Proper Setback from Prop Line/Struct False 4+ Deck Joist Ledger Connections-24" From Ends True Guards at stairs,decks,patios 30" + above grade True Interior/Exterior Railings 34 to 38 True Carbon Monoxide Detectors:True Furnace shut-off w/in 30 ft. or w/in line of site True Guard at stairwell at 34" or more False Provide guards at stairwell leading to crawl area Deck Ledger-Bolted per Code True on all levels w/gas appliances (i.e. furnace)False Smoke Detectors:True Battery backup True HRV or ERV Installed per Bedroom Requirements False provide HRV (heat recovery ventilation) as discussed Knee wall/Crawl space 18" x 24"True Roof Complete / Exterior Finish Complete False Relief Valve ,Heat Trap/Water Temp 110 deg or less False Every level, Every bedroom True OK to Issue Temporary C/O False Conditions for Temporary C/O : 1. Return handrail into wall 2. provide guards at crawl area stairwell with hand rail one side 3. Provide HRV (heat recovery ventilation) 4. Remove paper from box plate cavities / FSK paper over insulation 5. Complete garage 6. Provide final electrical 7. Complete site development for zoning permits 8. Provide final survey As Built Septic System True Low water shut-off boiler True Fresh air supply 3' from grade True within 10' of all sleeping areas True Outside Spigots have Air Gap False September 18, 2023 Page 2 of 3 INSPECTION WORKSHEET (RESFINAL-027748-2023) Checklist Item CommentsPassed Flex Gas Pipe Bonding False Floor truss, draft stop- fin base 1,000 sq. ft.False N/A Plumbing fixtures True Handrail 4 or more risers False Duct work sealed properly False complete sealing of duct work Basement Egress: 5s.f. window w/sill or Bilco door False Foundation insulation to floor False Chimney Height / B Vent / Direct Vent Location True Attic Access 22 x 30 minimum False need to verify attic access as indicated on house plans / pg. A2.1 1/2" Gypsum-Bsmt Ceiling<2x10 Frame/TJI/Fl. Truss False All Hot Water Systems: 3/4" or larger piping R-3 True Electronic as-builts False Bathroom / Kitchen Watertight True Handrail Termination at Newell Post or Wall False Return handrail into wall as discussed General Comments True September 18, 2023 Page 3 of 3