IM Inspection Worksheet_18-09-2023_15-28-04INSPECTION WORKSHEET (RESFINAL-027748-2023)
RC-0134-2021Case Number:Case Module:Permit Management
09/18/2023 Partial PassInspection Status:Inspection Date:
Residential Final InspectionInspection Type:Inspector:Charles Dyer
Job Address:Parcel Number:53 Assembly Point Rd
Lake George, NY 12845
239.12-2-16
Company Name NameContact Type
Applicant William Bosy
Architect Mark Patrizio
Contractor Frank Witz Enterprises Inc
Valente Builders Inc
Electrical Contractor Einzig Electric
Engineer Mark Bergeron
Excavation Contractor Ruben Ellsworth
Granted Permission William Bosy
Primary Owner William Bosy
Kathleen Bosy
Checklist Item CommentsPassed
Low flow toilet 1.3 gal/flushing cycle True
Bathroom Fans, if no window True
3" Plumbing Vent through roof minimum 18 inch True
Grade away from foundation: 6" down, 10' out False
Final Survey Plot Plan False Provide final survey
Window guards req:<2' above floor/6' above grade True
Interior privacy/trim/doors/main entrance 36 True
Backflow Preventors where required True
Basement wall insulation R- value verified True cover with FSK paper
Emergency egress below grade False N/A crawl area
Fuel Tanks above flood plain elevation True
Intake Openings True
Safety glazing: w/in 5' of tub/shower True
Site Plan / Variance required False Complete site development
Attic Access Insulation = Attic R- Value False
Platform at all exterior doors True
Fireblocking at fl joist 80 s.f. or less False
Garage Floor Pitched False
Wood deck: 2'+ from grade dia bracing required True
Inter Connected True
Arc Fault Breaker Habitable Spaces False
Energy Sticker on Elec. Panel:R-Val. & Heating Sys False
Furnace/Hot Water Heater operating False
Hot water drain pan to indirect waste False N/A
September 18, 2023 Page 1 of 3
INSPECTION WORKSHEET (RESFINAL-027748-2023)
Checklist Item CommentsPassed
Fresh Air Intake True
Chimney Rain Cap Installed True
Foam in basement/attics covered w/thermal barrier False N/A
Outside every bedroom area True
Blower Door Test Certification False provide blower door test results / under 3 ACH's (air changes per
hour)
Fin Elect; Energy Saving Light Bulbs 90 Percent False Provide final electric
Gas Log In Sealed or Glass Enclosure True
OK to Issue C/O False
Truss ID Signage Installed at Electrical Meter False
Range Hood 400+ cfm-Fresh Air REQUIRED False
4 inch Building Number Address visible from road False Provide house #'s visible from road
HVAC Vent Terminal 10' from Lot Line & Openings True
Attic Access Gasketed False
Jack posts in basement lagged at top and bottom True
Guard at deck, porches 36" or more True
6" clearance to sill plate True
Propane Tank: Proper Setback from Prop Line/Struct False
4+ Deck Joist Ledger Connections-24" From Ends True
Guards at stairs,decks,patios 30" + above grade True
Interior/Exterior Railings 34 to 38 True
Carbon Monoxide Detectors:True
Furnace shut-off w/in 30 ft. or w/in line of site True
Guard at stairwell at 34" or more False Provide guards at stairwell leading to crawl area
Deck Ledger-Bolted per Code True
on all levels w/gas appliances (i.e. furnace)False
Smoke Detectors:True
Battery backup True
HRV or ERV Installed per Bedroom Requirements False provide HRV (heat recovery ventilation) as discussed
Knee wall/Crawl space 18" x 24"True
Roof Complete / Exterior Finish Complete False
Relief Valve ,Heat Trap/Water Temp 110 deg or less False
Every level, Every bedroom True
OK to Issue Temporary C/O False Conditions for Temporary C/O : 1. Return handrail into wall 2.
provide guards at crawl area stairwell with hand rail one side 3.
Provide HRV (heat recovery ventilation) 4. Remove paper from box
plate cavities / FSK paper over insulation 5. Complete garage 6.
Provide final electrical 7. Complete site development for zoning
permits 8. Provide final survey
As Built Septic System True
Low water shut-off boiler True
Fresh air supply 3' from grade True
within 10' of all sleeping areas True
Outside Spigots have Air Gap False
September 18, 2023 Page 2 of 3
INSPECTION WORKSHEET (RESFINAL-027748-2023)
Checklist Item CommentsPassed
Flex Gas Pipe Bonding False
Floor truss, draft stop- fin base 1,000 sq. ft.False N/A
Plumbing fixtures True
Handrail 4 or more risers False
Duct work sealed properly False complete sealing of duct work
Basement Egress: 5s.f. window w/sill or Bilco door False
Foundation insulation to floor False
Chimney Height / B Vent / Direct Vent Location True
Attic Access 22 x 30 minimum False need to verify attic access as indicated on house plans / pg. A2.1
1/2" Gypsum-Bsmt Ceiling<2x10 Frame/TJI/Fl. Truss False
All Hot Water Systems: 3/4" or larger piping R-3 True
Electronic as-builts False
Bathroom / Kitchen Watertight True
Handrail Termination at Newell Post or Wall False Return handrail into wall as discussed
General Comments True