CC-0265-2023 Office Use Only
I
ADDITION/ALTERATION PERMIT Permit#: C£. -
APPLICATION Permit Fee: $ 2(0 l •�
Town of Queensbury
742 Bay Road,Queensbbry,NY 12804
Invoice#: to vtO
P:518-761-8256 www.gueensbury.net
Flood Zone? Y ON Reviewed By:
Project Location: Outlets at Lake George East- 1424 State Rt. 9, Suite#8-8A, Queens
-b-u-ry®, NY 12845
Tax Map ID #: S �b ��"-� Subdivision INa e:, I�"� fl, 11 W7 � Ip1�
PROJECT INFORMATION: CJAY 9 G023'
TOWN Cl;�
TYPE: ❑ Residential ❑ Commercial, Proposed Use: ��`-`�I`'�` r ''D `'
❑ Single-Family ❑ Two-Family ❑ Multi-Family (#of units_) ❑ Townhouse
❑ Business Office x❑ Retail ❑ Industrial/Warehouse ❑ Garage (#of cars )
❑ Other (describe )
ADDITION SQUARE FOOTAGE: ALTERATION SQUARE FOOTAGE:
1st floor: 1st floor: 7,482 square feet
2nd floor: 2nd floor:
3rd floor: 3rd floor:
Basement (habitable space): Basement (habitable space):
Total sq ft: Total sq ft: 7,482 square feet
Scope of work to be done: Removal of existing floor finishes, interior partitions, floor/wall fixtures and light fixtures.
New interior partitions, floor finishes, lighting, floor/wall fixtures and paint.
Existing mechanical units to remain. Ductwork to remain and be modified as required.
Existing restroom and mop sink to remain as is. New drinking fountain.
Existing electrical panels to remain.
Addition/Alteration Application Revised March 2022
J
ADDITIONAL PROJECT INFORMATION:
1. Estimated Cost of Construction: $ 500,000.00
2. Source of Heat (circle one): ' 0 Gas ❑ Oil ❑ Propane ❑ Solar ❑ Other:
Fireplaces/inserts need a separate Fuel Burning Appliances & Chimney Application
3. Are there any structures not shown on the plot plan? ❑ YES ❑x NO Explain:
4. Are there any easements on the property? ❑ YES x❑ NO
SITE INFORMATION:
• Is this a corner lot? ❑ YES x❑ NO
• Will the grade be changed as a result of the construction? ❑ YES ❑x NO
• What is the water source? ❑x PUBLIC ❑ PRIVATE WELL
• What type of wastewater system is on the parcel? x❑ SEWER ❑ PRIVATE SEPTIC
DECLARATION: -
1. 1 acknowledge that no construction shall be commenced prior to the issuance of a valid permit and will be
completed within a 12 month period.Any changes to the approved plans prior to/during construction will require
the submittal of amended plans, additional reviews and re-approval.
2. If,for any reason,the building permit application is withdrawn, 30%of the fee is retained by the Town of
Queensbury. After 1 year from the initial application date, 100%of the fee is retained.
3. Ifthework is not completed by the 1 year expiration date the permit may be renewed, subject to fees
and department approval.
4. 1 certify that the application, plans and supporting materials are a true and a complete statement and/or description
of the work proposed, that all work will be performed in accordance with the NYS Building Codes, local building laws
and ordinances, and in conformance with local zoning regulations.
5. 1 acknowledge that prior to occupying the facilities proposed I, or my agents, will obtain a certificate of
occupancy.
6. 1 also understand that I/we are required to provide an as-built survey by a licensed land surveyor of all newly
constructed facilities prior to issuance of a certificate of occupancy.
I have read and agree to the above:
PRINT NAME: Lisa Ross
SIGNATURE: DATE: 05/17/2023
Addition/Alteration Application Revised March 2022
1
CONTACT INFORMATION: PLEASE PRINT LEGIBLY OR TYPE, PLEASE INCLUDE AN EMAIL
• Applicant:
Name(s): Lisa Ross
Mailing Address, C/S/Z: 360 Lexington Avenue, 7th Floor, New York, NY 10017
Cell Phone: ( Land Line:. 212 ) 599-0044
Email: Iross@kennethpark.com
• Primary Owner(s):
Name(s): Mario Lopez- Project Manager- Columbia Sportswear Company
Mailing Address, C/S/Z: 14375 NW Science Park Drive, Portland, OR 97229
Cell Phone: ( Land Line: 503 ) 985-4918
Email: mlopez@columbia.com
o Check if all work,will be performed by property owner only
• Contractor(s): (List all additional contractors on the back of this form)
Contact Name(s): Herman Stewart Construction & Dev., Inc.
Contractor Trade: General Contractor
Mailing Address, C/S/Z: 4550 Forbes Blvd.#200,Lanham, MD 20706
Cell Phone: ( 484 ) 429-0922 Land Line: 301 ) 731-5555
Email: mdurrwachter@herman-stewart.com
"Workers' Comp documentation must be submitted with this application,"
• Architect(s)/Engineer(s):
Business Name: Kenneth Park Architect
Contact Name(s): Lisa Ross-Senior Project Manager; Sonny Thio - Director of Projects
Mailing Address, C/S/Z: 360 Lexington Avenue, 7th Floor, New York;NY 10017
Cell Phone: ( ) - Land Line: 212 ) 599 -0044
Email: Iross@kennethpark.com ; sthio@kennethpark.com,
Contact Person for Compliance in regards to this project: Lisa Ross-Senior Project Manager
Cell Phone: _�) Land Line: 212 ) 599 -0044 x 263
Email: Iross@kennethpark.com
Addition/Alteration Application Revised March 2022
COMcheck Software Version COMcheckWeb
Interior Lighting Compliance Certificate
R
E�IEw�® F�p`IANGE
Project Information OD� CAM
Energy Code: 2020 New York State Energy Con d ion Code
Project Title: 23.165 -Columbia - Lake George,
Project Type: Alteration
Construction Site: M:9fft,
Designer/Contractor:
1424 State Route 9,Suite#8-8A Peter A. Leptuch, P.E.
Queensbury, New York 12845 300 N. Carroll Blvd.Suite#200
Denton,Texas 76201
Allowed Interior Lighting PowerB C p
Area Catego r Area Allowed Allowed
ft2) Watts/ft2 Watts
1-Sales(Retail) 7195 1.06 7627
Total Allowed Watts= 7627
Proposed Interior Lighting Power
A B C D E
Fixture ID : Description / Lamp/Wattage Per Lamp/ Ballast Lamps/ # of Fixture (C X D)
Fixture Fixture Watt.
Sales (Retail. 7195 sq.ft.)
LED 1: LT1: Hlgh Bay: Other: 1 42 39 1638
LED 2: LT3: Recessed LED: Other: P� 1 10 29 290
LED 3: LT3B:.Wall Washer: Other:
10
LED 4: LT5B:Wall Washer: Other: ��� C���l/ 1 6 35 262
1 2 31 62
LED 5: LT6: 2x4 LED: Other: 1 3 30 90
LED 7: LT8: Linear LED: Other: 1 17 31 527
LED 8: LT8A: Linear LED: Other: 1 1 31 31
LED 9: LT11: Linear LED: Other: 1 2 8 16
Track Lighting 1: LT5: LED Track Light: Wattage based on current limiting device 0 0 240 240
capacity
Track Lighting 2: LT5: LED Track Light: Wattage based on current limiting device 0 0 480 480
capacity
Track Lighting 3: LT5: LED Track Light: Wattage based on current limiting device 0 0 480 480
capacity
Track Lighting 4: LT5: LED Track Light: Wattage based on current limiting device 0 0 360 360
capacity
Track Lighting 5: LT5: LED Track Light: Wattage based on.current limiting device 0 0 600 600
capacity
Track Lighting 6: LT5: LED Track Light: Wattage based on current limiting device 0 0 600 600
capacity
Track Lighting 7: LT5: LED Track Light: Wattage based on current limiting device 0 0 600 600
capacity
Track Lighting 8: LT5: LED Track Light: Wattage based on current limiting device 0 0 360 360
capacity
Track Lighting 9: LT5: LED Track Light: Wattage based on current limiting device 0 0 240 240
capacity
LED 10: LT3T:Wall Washer: Other: 1 4 43 172
Project Title: 23.165-Columbia-Lake George, NY Report date: 05/16/23
Data filename: Page 1 of 9
A B C D E
Fixture ID : Description / Lamp/Wattage Per Lamp/ Ballast Lamps/ # of Fixture (C X D)
Fixture Fixture Watt.
LED 4: LT5C:Wall Washer: Other: 1 2 9 18
Total Proposed Watts= 7014
Interior Lighting Compliance
Statement
Compliance Statement: The proposed interior lighting alteration project represented in this document is consistent with the
building plans,specifications, and other calculations submitted with this permit application.The proposed interior lighting
systems have been designed to meet the 2020 New York State Ener Con rva ' n C struction Code requirements in
COMcheck Version COMcheckWeb and to comply with any ap ' m ato- e rements listed in the Inspection Checklist.
Peter A.Leptuch, P.E. ®,C/ a—i
Name-Title S' nature Date
O)F NE`v
'P P 9 M < yo
40LM
oa 4
Project Title: 23.165-Columbia-Lake George, NY Report date: 05/16/23
Data filename: Page 2 of 9
COMcheck Software Version COMcheckWeb
Mechanical Compliance Certificate
Project Information
Energy Code: 2020 New York State Energy Conservation Construction Code
Project Title: 23.165 - Columbia - Lake George, NY
Location: Lake George, New York
Climate Zone: 6a
Project Type: Alteration
Construction Site: Owner/Agent: Designer/Contractor:
1424 State Route 9, Suite#8-8A Peter A. Leptuch, P.E.
Queensbury, New York 12845 300 N.Carroll Blvd.Suite#200
Denton,Texas 76201
Mechanical Systems List
Quantity5ystem Type & Description
1 Water Heater:
Electric Storage Water Heater, Capacity: 30 gallons
Proposed Efficiency: 0.00 SL, %/h (if> 12 kW), Required Efficiency: 1.20 SL, %/h (if> 12 kW)
Mechanical Compliance Statement
Compliance Statement. The proposed mechanical alteration project represented in this document is consistent with the building
plans,specifications,and other calculations submitted with this permit application.The po�oposed mechanical systems have been
designed to meet the 2020 New York State Energy Conservation uct' Cqoe re-�irements in COMcheck Version
COMcheckWeb and to comply with any applicable mandatory r i me lis I i Inspection Checklist.
Peter A. Leptuch, P.E.
Name-Title Sighaffire Dat
OF N,F
�C� PDAM C�A�O��
44/
L
O 8 14
Project Title: 23.165-Columbia- Lake George, NY Report date: 05/16/23
Data filename: Page 3 of 9
COMcheck Software Version COMcheckWeb
Inspection Checklist
Energy Code: 2020 New York State Energy Conservation.Construction Code
Requirements: 0.0% were addressed directly in the COMcheck software
Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
Section
# Plan Review Complies? Comments/Assumptions
& Req.ID
C103.2 ;Plans,specifications, and/or ;❑Complies
[PR3]1 calculations provide all information `❑Does Not
;with which compliance can be
determined for the service water ;❑Not Observable
heating systems and equipment and ❑Not Applicable
;document where exceptions to the
;standard are claimed. Hot water
system sized per manufacturer's
;sizing guide.
C103.2 ;Plans,specifications, and/or ';❑Complies
[PR4]1 calculations provide all information ;❑Does Not
;with which compliance can be
'determined for the interior lighting :❑Not Observable
and electrical systems and equipment ❑Not Applicable
and document where exceptions to
;the standard are claimed. Information
;provided should include interior
;lighting power calculations,wattage of
bulbs and ballasts,transformers and
f
control devices.
Additional Comments/Assumptions:
11 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: 23.165-Columbia-Lake George, NY Report date: 05/16/23
Data filename: Page 4 of 9
Section
# Plumbing Rough-In Inspection Complies? Comments/Assumptions
& Re .ID
C404.5, 'Heated water supply piping conforms ;❑Complies
C404.5.1, to pipe length and volume ❑Does Not
C404.5.2 ;requirements. Refer to section details.
[PL6]3 ENot Observable
❑Not Applicable
C404.6.3 ;Pumps that circulate water between a ;❑Complies
[PL7]3 ;heater and storage tank have controls a❑Does Not
;that limit operation from startup to
<=5 minutes after end of heating ❑Not Observable
cycle. �❑Not Applicable
C404.7 ;Demand recirculation water systems ;❑Complies
[PL8]3 :have controls that start the pump ;❑Does Not
upon receiving a signal from the
action of a user of a fixture or ❑Not Observable
appliance and limits the temperature :❑Not Applicable
of the water entering the cold-water
;piping to 104°F. I
Additional Comments/Assumptions:
11 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: 23.165-Columbia-Lake George, NY Report date: 05/16/23
Data filename: Page 5 of 9
Section
# Mechanical Rough-In Inspection Complies? Comments/Assumptions
& Req.ID
C402.2.6 ;Thermally ineffective panel surfaces of;❑Complies
[ME41]3 sensible heating panels have ;❑Does Not
insulation >= R-3.5.
❑Not Observable
❑Not Applicable
C403.7.2 :Enclosed parking garage ventilation ❑Complies
[ME115]3 has automatic contaminant detection :❑Does Not
and capacity to stage or modulate
;fans to 50%or less of design capacity. ;❑Not Observable:
❑Not Applicable
C403.7.5 ;Kitchen exhaust systems comply with ;❑Complies
[ME116]3 replacement air and conditioned ❑Does Not
;supply air limitations, and satisfy hood;
'rating requirements and maximum ,❑Not Observable;
exhaust rate criteria. ;❑Not Applicable
C403.4.1. ;Heating for vestibules and air curtains ❑Complies
4 with integral heating include ;❑Does Not
[ME63]2 ;automatic controls that shut off the
heating system when outdoor air Z❑Not Observable
ltemperatures>45F.Vestibule ;❑Not Applicable
;heating and cooling systems
controlled by a thermostat in the
;vestibule with heating setpoint<_
60F and cooling setpoint>=80F.
C408.2.2. :Air outlets and zone terminal devices ;❑Complies
1 have means for air balancing. ❑Does Not
[ME53]3 ;❑Not Observable;
❑Not Applicable
C403.5, ;Refrigerated display cases,walk-in ;❑Complies
C403.5.1, ;coolers or walk-in freezers served by ;❑Does Not
C403.5.2 !remote compressors and remote
[ME123]3 ;condensers not located in a ❑Not Observable
condensing unit, have fan-powered ❑Not Applicable
condensers that comply with Sections
;C403.5.1 and refrigeration compressor'
;systems that comply with C403.5.2..
Additional Comments/Assumptions:
11 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: 23.165-Columbia-Lake George, NY Report date: 05/16/23
Data filename: Page 6 of 9
Section
# Rough-in Electrical Inspection Complies? Comments/Assumptions
& Req.ID
C405.2.2. ;Spaces required to have light- ❑Complies
2 ;reduction controls have a manual ;❑Does Not
[EL22]1 ;control that allows the occupant to
'reduce the connected lighting load in ;❑Not Observable
a reasonably uniform illumination ;❑Not Applicable ;
pattern >=50 percent.
C405.2.1, :Occupancy sensors installed in ;❑Complies
C405.2.1. classrooms/lecture/training rooms, ❑Does Not
1 ;conference/meeting/multipurpose
[EL18]1 :rooms, copy/print rooms, ;❑Not Observable
lounges/breakrooms, enclosed offices, ❑Not Applicable ;
open plan office areas, restrooms,
storage rooms, locker rooms,
'warehouse storage areas, and other
spaces<=300 sgft that are enclosed
by floor-to-ceiling height partitions.
Reference section language
C405.2.1.2 for control function in
;warehouses and section C405.2.1.3
;for open plan office spaces.
C405.2.1. ;Occupancy sensors control function in ;❑Complies
2 'warehouses: In warehouses,the '❑Does Not
[EL19]1 ;lighting in aisleways and open areas is,
controlled with occupant sensors that :❑Not Observable
automatically reduce lighting power :❑Not Applicable
by 50%or more when the areas are
unoccupied.The occupant sensors
control lighting in each aisleway
independently and do not control
blighting beyond the aisleway being
controlled by the sensor.
C405.2.1. Occupant sensor control function in ;❑Complies
3 open plan office areas: Occupant '❑Does Not
[EL20]1 ;sensor controls in open office spaces
>= 300 sq.ft. have controls 1) ❑Not Observable'
configured so that general lighting can'❑Not Applicable
be controlled separately in control
zones with floor areas<=600 sq.ft
within the space, 2) automatically turn,
;off general lighting in all control zones ;
;within 20 minutes after all occupants
have left the space, 3) are configured
so that general lighting power in each
;control zone is reduced by>= 80%of
;the full zone general lighting power
;within 20 minutes of all occupants
leaving that control zone, and 4)are ;
;configured such that any daylight
!responsive control will activate space
general lighting or control zone
general lighting only when occupancy
for the same area is detected.
C405.2.2, ;Each area not served by occupancy ❑Complies
C405.2.2. sensors(per C405.2.1)have time- T❑Does Not
1, ;switch controls and functions detailed
C405.2.2. ;in sections C405.2.2.1 and C405.2.2.2. ❑Not Observable
2 ❑Not Applicable
[EL21]2
1 ,
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: 23.165-Columbia-Lake George, NY Report date: 05/16/23
Data filename: Page 7 of 9
Section
# Rough-In Electrical Inspection Complies? Comments/Assumptions
& Req.ID
C405.2.3, ;Daylight zones provided with ;❑Complies
C405.2.3. ;individual controls that control the ❑Does Not
1, ;lights independent of general area
C405.2.3. lighting.See code section C405.2.3 ;❑Not Observable
2 Daylight-responsive controls for ❑Not Applicable
[EL23]2 ;applicable spaces, C405.2.3.1 Daylight;
i responsive control function and ;
section C405.2.3.2 Sidelit zone.
C405.2.4 ;Separate lighting control devices for '❑Complies
[EL26]1 ;specific uses installed per approved 1❑Does Not
;lighting plans.
❑Not Observable
❑Not Applicable
C405.2.4 ;Additional interior lighting power ;❑Complies
[EL27]1 allowed for special functions per the ;❑Does Not
approved lighting plans and is
automatically controlled and ',[]Not Observable
separated from general lighting. '❑Not Applicable ;
C405.3 ;Exit signs do not exceed 5 watts per ;❑Complies
[EL6]1 face. ;❑Does Not
;
❑Not Observable
❑Not Applicable
Additional Comments/Assumptions:
11 High Impact(Tier 1) 2 1 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: 23.165-Columbia-Lake George, NY Report date: 05/16/23
Data filename: Page 8 of 9
Section
# Final Inspection Complies? Comments/Assumptions
& Req.ID
C303.3, Furnished O&M instructions for ;❑Complies
C408.2.5. systems and equipment to the ❑Does Not
2 :building owner or designated
[FI17]3 ;representative. UNot Observable
❑Not Applicable
C404.3 ;Heat traps installed on supply and :❑Complies
[FI11]3 ;discharge piping of non-circulating ❑Does Not
systems.
❑Not Observable
❑Not Applicable
C404.4 ;All piping insulated in accordance with'❑Complies
[FI25]2 section details and Table C403.11.3. ❑Does Not
'❑Not Observable,
' ❑Not Applicable
C405.4.1 ;Interior installed lamp and fixture '❑Complies 'See the Interior Lighting fixture schedule for values.
[F]18]1 blighting power is consistent with what :❑Does Not
is shown on the approved lighting
plans, demonstrating proposed watts ❑Not Observable
are less than or equal to allowed ❑Not Applicable
watts.
C408.2.5. ;,Furnished as-built drawings for '❑Complies
1 :.electric power systems within 90 days ❑Does Not
[FI16]3 :of system acceptance.
;❑Not Observable
❑Not Applicable
C408.3 ;Lighting systems have been tested to ;❑Complies
[F133]1 ';ensure proper calibration, adjustment, :❑Does Not
;programming, and operation.
❑Not Observable
❑Not Applicable
Additional Comments/Assumptions:
11 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: 23.165-Columbia-Lake George, NY Report date: 05/16/23
Data filename: Page 9 of 9
e .
> COMcheck Software Version COMcheckWeb c ono
Interior Lighting Compliance Certificate 3
g g p
D a
rr F 01 N
=* ( C
Project Information = `p
Energy Code: 2020 New York State Energy Conservation Construction Code Ln
Project Title: 23.165 - Columbia - Lake George, NY M A
Project Type: Alteration r) A
00 O
go
Construction Site: Own er/A_gen_t:-- -- — ---�� -4 • "`Designer/Contractor:
1424 State Route 9,Suite#8-8A 6 +`�' P� y` Peter A. Le tuch, P.E. > N
00
Queensbury, New York 12845 �' IY,� '' _ ± r ly` 300 N. Carroll Blvd. Suite#200 (V O
i Denton,Texas 76201 Ln N
Fi
q Lh
W
Allowed Interior Lighting Power
A B(JiLC„iwf�L: 4 ; ` B C D
Area Category - -- _- =-Floor-Area Allowed Allowed
(ft2) Watts/ft2 Watts
1-Sales(Retail) 7195 1.06 7627
Total Allowed Watts = 7627
Proposed Interior Lighting Power
A B C D E
Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast Lamps/ # of Fixture (C X D)
Fixture Fixture Watt.
Sales (Retail. 7195 sq.ft.)
LED 1: LT1: High Bay: Other: 1 42 39 1638
LED 2: LT3: Recessed LED: Other: 1 10 29 290
LED 3: LT3B:Wall Washer: Other: 1 6 35 210
LED 4: LT5B:Wall Washer: Other: 1 2 31 62
LED 5: LT6: 2x4 LED: Other: 1 3 30 90
LED 7: LT8: Linear LED: Other: 1 17 31 527
LED 8: LT8A: Linear LED: Other: 1 1 31 31
LED 9: LT11: Linear LED: Other: 1 2 8 16
Track Lighting 1: LT5: LED Track Light: Wattage based on current limiting device 0 0 240 240
capacity
Track Lighting 2: LT5: LED Track Light: Wattage based on current limiting device 0 0 480 480
capacity
Track Lighting 3: LT5: LED Track Light: Wattage based on current limiting device 0 0 480 480
capacity
Track Lighting 4: LT5: LED Track Light: Wattage based on current limiting device 0 0 360 360
capacity
Track Lighting 5: LT5: LED Track Light: Wattage based on current limiting device 0 0 600 600
capacity
Track Lighting 6: LT5: LED Track Light: Wattage based on current limiting device 0 0 600 600
capacity
Track Lighting 7: LT5: LED Track Light: Wattage based on current limiting device 0 0 600 600
capacity
Track Lighting 8: LT5: LED Track Light: Wattage based on current limiting device 0 0 360 360
capacity
Track Lighting 9: LT5: LED Track Light: Wattage based on current limiting device 0 0 240 240
.capacity
LED 10: LT3T: Wall Washer: Other: 1 4 43 172
Project Title: 23.165-Columbia-Lake George, NY Report date: 05/16/23
Data filename: Page 1 of 6
A B C D E
Fixture ID : Description/ Lamp /Wattage Per Lamp / Ballast Lamps/ # of Fixture (C X D)
Fixture Fixture Watt.
LED 4: LT5C: Wall Washer: Other: 1 2 9 18
Total Proposed Watts = 7014
?�. ,.;, `�+, „`>`,•. »czM`a�zzzz,� wza�z;;~z ;\,a,„a» zi,tzi z `C�zz,\,,,,�z�� ,,;�»,,,,,,,,, ».a.,,,,.,,,,.,,,,�\ ziiziz zz>'?zziiizi,,,,a,•.,•.,\,zz;'azz$N%;rz�„s;,,,, » »,z,a,,,izizzzz;�r
zzz` `ez», zz»z
z
zx
ti.h.• ...,.»,,,,»,,,,,,, �'z�;i'r'a zi„cis;„i;iiiizxz»,,. .. �,aa,»»,,,,,,,,..,,„vxzz,,,,,,,;z„zizzzzz�z;z`�,,,»»»,,,,,zzzz, ,,,,,,,zz„
, „ ,,,\» �»»,a, �,a »,z,,,_.,»,,,ii:<iz iizzii i#ziiiizzizzzizzxzsz'r»r'iza,,,,,,,,,,,,,,,,,,,,, ,z`»r;;z ,»�„�»z,,,•,,,».,»„:.,»„»»,,,»,,,»,,,,�,,,,,,•
v. v"'»i,+ k,„i:k'+ii�„" \�»v'+»kkkk,' � ki,+k S\'..+•kk'+»».+.kkk+�'..................,........,,k:.\\+k:kkkY.+.:wkkkkkkkkk"„+'. ` „"„'.""`..kk:kY..�k3::k\�vk\'v»v..+,:k�:::::3.4,k,`kkkwk:.^+...`.::kw,»...kSkk�v`v»k`\�»'\'kkkkk
Interior Lighting Compliance
Statement
Compliance Statement. The proposed interior lighting alteration project represented in this document is consistent with the
building plans,specifications, and other calculations submitted with this permit application.The proposed interior lighting
systems have been designed to meet the 2020 New York State Enepy cdnsery tion onst ction Code requirements in
COMcheck Version COMcheckWeb and to comply with any appli Vag e and - ry r uire ents listed in the Inspection Checklist.
Peter A. Leptuch, P.E.
Name-Title Si • ture Da e
OF/UFO
5 ADAM
Q a G
0 �
-_ �
81
� S
Project Title: 23.165-Columbia-Lake George, NY Report date: 05/16/23
Data filename: Page 2 of 6
.nit COMcheck SoftwareVersion COMcheckWeb
Inspection Checklist
Energy Code: 2020 New York State Energy Conservation Construction Code
Requirements: 0.0% were addressed directly in the COMcheck software
Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,;;,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,;,;,,,,,,,,,,,,,,,,,,,,,,,,;,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,
xFa� ..
..
».:-::-: :: :::: ......... 1: a�a : :.'::' C ialE s2?:.: :: ::: C eat �s�ar p€fzs s
.�
... ......
.. ........:.....
..:.;;:::::.:::;::..:: .::.
r- _--W-- ---, _ --.------- _ -._.---------_ _ .-. _ - ..... ..... _y.. _ ------.-- -_-. _ .....- _ _-
€C103.2 :Plans,specifications, and/or ❑Complies
[PR4]1 :calculations provide all information ❑Does Not
:with which compliance can be
determined for the interior lighting ❑Not Observable
:and electrical systems and equipment ❑Not Applicable
and document where exceptions to
:the standard are claimed. Information
:provided should include interior
;lighting power calculations, wattage of
bulbs and ballasts,transformers and
:control devices.
Additional Comments/Assumptions: ^
1 ;High Impact (Tier 1) 2':< Medium Impact(Tier 2) i:3."Low Impact(Tier 3)
Project Title: 23.165 -Columbia-Lake George, NY Report date: 05/16/23
Data filename: Page 3 of 6
� r �
.....,,..,.....e.....,,,..........M,,,-.., .�,.,.,,.,,.�,.., .,..M.....w............... ....,.. ,....
- w- .•.,.....
...
-. - ............:.....:..' ... ..: .... ..-.-..
.. � i ::;>i i:::::iz.:.......:......._... ........_.... ........,..... ;:.:.-.-._:._ :......:....:..;.
:;:::' €� as�As �aa �rs�
::-......-....-.... ..........-....--------------------....-------....-...........------------------------------------- ..........................
:Spaces required to have light- ❑Complies
€2 reduction controls have a manual ❑Does Not
[EL22]1 :control that allows the occupant to
reduce the connected lighting load in ❑Not Observable'
:a reasonably uniform illumination ::[]Not Applicable
pattern >= 50 percent.
€C405.2.1, :Occupancy sensors installed in ::]Complies
C405.2.1. classrooms/lecture/training rooms, °❑Does Not
'•.1 :conference/meeting/multipurpose
[EL18]1 :rooms, copy/print rooms, ❑Not Observable
:lounges/breakrooms,enclosed offices, ❑Not Applicable
open plan office areas, restrooms,
storage rooms, locker rooms,
:warehouse storage areas, and other
spaces <=300 sqft that are enclosed
by floor-to-ceiling height partitions.
Reference section language
C405.2.1.2 for control function in
:warehouses and section C405.2.1.3
:for open plan office spaces.
:.......................:.................................................................................................................................................................................................................................................................
:
C405.2.1. :Occupancy sensors control function in :❑Complies
€2 ;warehouses: In warehouses,the :❑Does Not
[EL19]1 :lighting in aisleways and open areas is,
controlled with occupant sensors that :❑Not Observable
:automatically reduce lighting power :❑Not Applicable
by 50%or more when the areas are
:unoccupied.The occupant sensors
:control lighting in each aisleway
'independently and do not control
:lighting beyond the aisleway being
controlled by the sensor._ _
€C405.2.1. :Occupant sensor control function in '•❑Complies
€3 :open plan office areas: Occupant :❑Does Not
€[EL20]1 :sensor controls in open office spaces
:>= 300 sq.ft, have controls 1) ❑Not Observable:
configured so that general lighting can ❑Not Applicable
:be controlled separately in control
:zones with floor areas <= 600 sq.ft.
:within the space,2)automatically turn
off general lighting in all control zones
:within 20 minutes after all occupants
have left the space,3)are configured
:so that general lighting power in each
control zone is reduced by>= 80%of
:the full zone general lighting power
:within 20 minutes of all occupants
:leaving that control zone,and 4) are
:configured such that any daylight
:responsive control will activate space
:general lighting or control zone
:general lighting only when occupancy
:for the same area is detected.
...................................................................................:....................................... ..............................................--.....-------------•---•----..................................-._......----------
:G40:5 -2..:'Each area not served by occupancy :❑Complies
4052 >sensors(per C405.2.1)have time- ;❑Does Not
controls and functions detailed
sG40522t<in sections C405.2.2.1 and C405.2.2.2.:❑Not Observable
' :❑Not Applicable
.................................. ....... ... .....
1 :High Impact (Tier 1) 2: Medium Im act Tier 2 3Low Impact(Tier 3)
Project Title: 23.165-Columbia-Lake George, NY Report date: 05/16/23
Data filename: Page 4 of 6
...................................................... .............�w..... ............... ...............
........... --- .... ............... ............. .............. .......... ...... ......... ..................................
..................
. ................... ............. ............................. ................................................................................
� !., - . :. ......................................................................................... .. ...............................
........................... ............... ............................................
........... ....... ....... ra
.............................
................
..........
..................... ................................................... -------
.......... ................ ................................ ..... .......�....... ................ .......
.................... .. ....
........................................... ............................... ........................................ _.,
i _.....�.*_.� � . .:...�.... _-.-....,o........ o.............. ..........
.... ............. ............. ............ .................. .....................................................
.... ............. ........... -------............... ...............�%�.................. ..,. ... ..............
............... .......... ......�0................ ..................................................................................................
............
................................................... ........................w�...................... ..............................................................................................................
:Elcomplies...0 4.05- Daylight zones provided with
........................
C-4*....5.*. individual controls that control the 'E]Does Not
...........
independent of general area
jNot Observable:r
.C-,405-.-,2,"3 :liqhting. See code section C405.2.3
_l
.......................... :E]Not Applicable
..............
. Daylight-responsive controls for...................
L23 applicable spaces,C405.2.3.1 Daylight::
responsi
ve control function and
::........section C405.2.3.2 Sidelit zone.
.................................................................................................................................................................................................................................................................
:C05.2.4 :Separate lighting control devices for :E]Complies
::[EL26]1 ::specific uses installed per approved T]Does Not
:lighting plans.
FlNot Observable
:E]Not Applicable
::C405.2.4 :,Additional interior lighting power :E]Complies
:[EL27]1 ;:allowed for special functions per the ":E]Does Not
:approved lighting plans and is
FlNot Observable
:automatically controlled and
:
:separated from general lighting-
E]Not Applicable
C405.3 ::Exit signs do not exceed 5 watts per UComplies
::[EL6]1 'face. :E]Does Not
:E]Not Observable:
'EINot Applicable
Additional Comments/Assumptions:
...................................................
1 :High Impact(Tier 1) #Medium Impact(Tier 2) j.3 Low Impact(Tier 3)
Project Title: 23.165-Columbia-Lake George, NY Report date: 05/16/23
Data filename: Page 5 of 6
� r `
........m. ... ..,,........�,�. ...... .....,......-....-,.-...................»..�,.,,�.....---,.,---
.: ssl listl�xn Csa€i C€�ffatsis �ar�as
::...
...
.. .,.........................------------------------------------•---
:C303.3, Furnished 0&M instructions for :❑Complies
:C408.2:5.::systems and equipment to the :❑Does Not
2>:,;:.s:::.: ::building owner or designated
[F117]3':; ':: representative. []Not Observable
i❑Not Applicable
..:::...:::.:.:-.........................................................................------ ...................................... ...... ..............------------..........------------.....
EC405.4.1 :Interior installed lamp and fixture :❑Complies See the Interior Lighting fixture schedule for values.
:[FI18I1 :lighting power is consistent with what :❑Does Not
'.is shown on the approved lighting
:plans,demonstrating proposed watts :❑Not Observable
are less than or equal to allowed :❑Not Applicable
watts.
................ -------------------------------------------------------------------------..-.......: .........--.........-------•-- ------.......--.........----...--•-----------............--..---------.-...........---•----------..-........-•-
•-
`:C408:2:5 :._:Furnished as-built drawings for :❑Complies
electric power systems within 90 days :❑Does Not
:[FIl6]3 of system acceptance. :❑Not Observable
:❑Not Applicable
::C408.3 :Lighting systems have been tested to :❑Complies
:[FI33]1 :ensure proper calibration, adjustment, :❑Does Not
programming, and operation. :❑Not Observable
:❑Not Applicable
.......................:..................................................................................:......................................:......................................................................................................................................
Additional Comments/Assumptions:
....................................................
1 :High Impact(Tier 1) : ZMedium Impact(Tier 2) 3;_ Low Impact(Tier 3)
Project Title: 23.165 -Columbia-Lake George, NY Report date: 05/16/23
Data filename: Page 6 of 6
FIRE MARSHAL'S OFFICE
Town of Queensbury
742 Bay Road, Queensbunj, NY 12804
"Home of Natural Beauty ... A Good Place to Live "
PLAN REVIEW
Columbia Sportswear
1424 State Rte 9, Space 8 MA
CC-0265-2023
7482 S.F. Interior Alteration
5/26/23
I have reviewed the submitted drawings for the above project; and offer the
following comments:
1) Verify Storage
2) Verify operation of existing exit/ emergency lights w/ own breaker
3) Verify Locks/Latches according to the 2020 NYSFC
4) Verify Fire Extinguisher locations
5) Verify paths of egress
6) Verify Knox Box Key
7) Truss ID required
8) CO Detection required
9) Protection of the Fire Alarm system during construction According to the
2020 NYSFC Chapter 33
10) NFPA 72 letter of compliance required for any alterations to the Fire
Alarm System.
11) NFPA 13 letter of compliance required for any modifications to the
Sprinkler System
12) Properly Identify Spaces in fire alarm Panel
Deputy Fire Marshal
Tyson Converse
742 Bay Road
Queensbury NY 12804
518 761 8205
tysonc@queensbury.net
Fire Marshal's Office - Phone: 518-761-8206 - Fax: 518-745-4437
iremarshal@queensburtI net - zuz Mqueensbunl.net