IM Inspection Worksheet_20-09-2023_15-35-18INSPECTION WORKSHEET (RESFINAL-027831-2023)
RC-0715-2021Case Number:Case Module:Permit Management
09/20/2023 PassedInspection Status:Inspection Date:
Residential Final InspectionInspection Type:Inspector:Charles Dyer
Job Address:Parcel Number:3239 State Rte 9L
Lake George, NY 12845
239.18-1-49
Company Name NameContact Type
Applicant Steve Dempsey
Architect Williams & Williams Designers Inc.
Contractor Bromley Sawmill & Machinery LLC
Granted Permission Steve Dempsey
Primary Owner Steve Dempsey
Checklist Item CommentsPassed
Low flow toilet 1.3 gal/flushing cycle True
Bathroom Fans, if no window True
3" Plumbing Vent through roof minimum 18 inch True
Grade away from foundation: 6" down, 10' out True
Final Survey Plot Plan False N/A
Window guards req:<2' above floor/6' above grade True
Interior privacy/trim/doors/main entrance 36 True
Backflow Preventors where required True
Emergency egress below grade False
Safety glazing: w/in 5' of tub/shower True
Site Plan / Variance required True
Seals on Garage Doors, esp. Wood True
Attic Access Insulation = Attic R- Value True At roof deck
Platform at all exterior doors True Provide barrier at sliding glass doors
Garage Floor Pitched True
Inter Connected True
Arc Fault Breaker Habitable Spaces True
Furnace/Hot Water Heater operating True
Fresh Air Intake True
Chimney Rain Cap Installed True
Basement stairs closed rise greater than 4 inches True Existing stairs
Foam in basement/attics covered w/thermal barrier True Provide / show certification of thermal barrier at ICF's
Outside every bedroom area True
Oil Furnace Shut-Off at Entrance to Furnace Area True
Fin Elect; Energy Saving Light Bulbs 90 Percent True
OK to Issue C/O True Completion of deck has been verified / OK to issue C/O
4 inch Building Number Address visible from road True
Attic Access Gasketed True
Jack posts in basement lagged at top and bottom True
September 20, 2023 Page 1 of 2
INSPECTION WORKSHEET (RESFINAL-027831-2023)
Checklist Item CommentsPassed
6" clearance to sill plate True
Propane Tank: Proper Setback from Prop Line/Struct True
20 Minute Fire Door/Self-Closing Hardware True
Every level, Every bedroom True
Furnace shut-off w/in 30 ft. or w/in line of site True
Chimney Height / B Vent / Direct Vent Location True
within 10' of all sleeping areas True
Relief Valve ,Heat Trap/Water Temp 110 deg or less True
1/2" Gypsum or House Wall and Gable True
Bathroom / Kitchen Watertight True
Foundation insulation to floor True ICF's at addition
As Built Septic System True
Outside Spigots have Air Gap True
OK to Issue Temporary C/O True Conditions for temp C/O : complete deck / provide certification of
thermal barrier at ICF's / provide certification of site plan (zoning)
165.00 for 90 day temporary C/O
Battery backup True
Fresh air supply 3' from grade True
Low water shut-off boiler True
Guards at stairs,decks,patios 30" + above grade True Deck will be less than 30" from grade
Handrail 4 or more risers True
Attic Access 22 x 30 minimum True
Handrail Termination at Newell Post or Wall True
Roof Complete / Exterior Finish Complete True
Smoke Detectors:True Observed that all smoke detectors and CO working but not inter
acting with connections to all
Carbon Monoxide Detectors:True
Flex Gas Pipe Bonding True Propane
General Comments True OK to issue temporary C/O
3' from Baths True
Interior/Exterior Railings 34 to 38 True
Guard at stairwell at 34" or more True
Plumbing fixtures True
Deck Ledger-Bolted per Code True Ledger connected / deck to be completed at later date
September 20, 2023 Page 2 of 2