IM Inspection Worksheet_20-09-2023_15-35-18INSPECTION WORKSHEET (RESFINAL-027831-2023) RC-0715-2021Case Number:Case Module:Permit Management 09/20/2023 PassedInspection Status:Inspection Date: Residential Final InspectionInspection Type:Inspector:Charles Dyer Job Address:Parcel Number:3239 State Rte 9L Lake George, NY 12845 239.18-1-49 Company Name NameContact Type Applicant Steve Dempsey Architect Williams & Williams Designers Inc. Contractor Bromley Sawmill & Machinery LLC Granted Permission Steve Dempsey Primary Owner Steve Dempsey Checklist Item CommentsPassed Low flow toilet 1.3 gal/flushing cycle True Bathroom Fans, if no window True 3" Plumbing Vent through roof minimum 18 inch True Grade away from foundation: 6" down, 10' out True Final Survey Plot Plan False N/A Window guards req:<2' above floor/6' above grade True Interior privacy/trim/doors/main entrance 36 True Backflow Preventors where required True Emergency egress below grade False Safety glazing: w/in 5' of tub/shower True Site Plan / Variance required True Seals on Garage Doors, esp. Wood True Attic Access Insulation = Attic R- Value True At roof deck Platform at all exterior doors True Provide barrier at sliding glass doors Garage Floor Pitched True Inter Connected True Arc Fault Breaker Habitable Spaces True Furnace/Hot Water Heater operating True Fresh Air Intake True Chimney Rain Cap Installed True Basement stairs closed rise greater than 4 inches True Existing stairs Foam in basement/attics covered w/thermal barrier True Provide / show certification of thermal barrier at ICF's Outside every bedroom area True Oil Furnace Shut-Off at Entrance to Furnace Area True Fin Elect; Energy Saving Light Bulbs 90 Percent True OK to Issue C/O True Completion of deck has been verified / OK to issue C/O 4 inch Building Number Address visible from road True Attic Access Gasketed True Jack posts in basement lagged at top and bottom True September 20, 2023 Page 1 of 2 INSPECTION WORKSHEET (RESFINAL-027831-2023) Checklist Item CommentsPassed 6" clearance to sill plate True Propane Tank: Proper Setback from Prop Line/Struct True 20 Minute Fire Door/Self-Closing Hardware True Every level, Every bedroom True Furnace shut-off w/in 30 ft. or w/in line of site True Chimney Height / B Vent / Direct Vent Location True within 10' of all sleeping areas True Relief Valve ,Heat Trap/Water Temp 110 deg or less True 1/2" Gypsum or House Wall and Gable True Bathroom / Kitchen Watertight True Foundation insulation to floor True ICF's at addition As Built Septic System True Outside Spigots have Air Gap True OK to Issue Temporary C/O True Conditions for temp C/O : complete deck / provide certification of thermal barrier at ICF's / provide certification of site plan (zoning) 165.00 for 90 day temporary C/O Battery backup True Fresh air supply 3' from grade True Low water shut-off boiler True Guards at stairs,decks,patios 30" + above grade True Deck will be less than 30" from grade Handrail 4 or more risers True Attic Access 22 x 30 minimum True Handrail Termination at Newell Post or Wall True Roof Complete / Exterior Finish Complete True Smoke Detectors:True Observed that all smoke detectors and CO working but not inter acting with connections to all Carbon Monoxide Detectors:True Flex Gas Pipe Bonding True Propane General Comments True OK to issue temporary C/O 3' from Baths True Interior/Exterior Railings 34 to 38 True Guard at stairwell at 34" or more True Plumbing fixtures True Deck Ledger-Bolted per Code True Ledger connected / deck to be completed at later date September 20, 2023 Page 2 of 2