IM Inspection Worksheet_19-09-2023_15-26-30INSPECTION WORKSHEET (FDTN-027796-2023)
RC-0458-2023Case Number:Case Module:Permit Management
09/19/2023 Partial PassInspection Status:Inspection Date:
Building FoundationInspection Type:Inspector:Charles Dyer
Job Address:Parcel Number:29 Revere Rd
Queensbury, NY 12804
308.18-1-45.2
Company Name NameContact Type
Applicant Cerrone Builders Inc
Contractor Cerrone Builders Inc
Engineer Vision Engineering
Granted Permission Cerrone Builders Inc
Primary Owner BRIAN LITTLE
Checklist Item CommentsPassed
Building Inspector Notes False
Footing Drain Stone - 12 inch width False
PVC/Cast/Copper/Pex tubing False
Pressure Test False
Foundation / Wallpour True approved
5 psi or 10 ft. above highest conn. for 15 minutes False
Air or head test False
Footing Drain Stone - 6 inches above footing False
Foundation Dampproofing False
Plumbing Under Slab False
Foundation Waterproofing False
Footing Drain Daylight or Sump False
Footings True approved
Footing Drain stone - 6 mil poly False
Piers True
Backfill Approval False
Rough Grade 6 inch drop within 10 ft.False
Foundation Insulation Interior / Exterior False
Reinforcement in Place True
Reinforcement in Place True 2 #4s continuous
Permit Card Visible From Road True
Poly Under Slab False
Footing Dowels or Keyway in place True wet sticking
September 19, 2023 Page 1 of 1