IM Inspection Worksheet_25-09-2023_10-35-48INSPECTION WORKSHEET (RESFINAL-026980-2023)
RC-000165-2015Case Number:Case Module:Permit Management
09/25/2023 FailedInspection Status:Inspection Date:
Residential Final InspectionInspection Type:Inspector:John O'Brien
Job Address:Parcel Number:8 Lockhart Mountain Rd
Lake George, NY 12845
252.-1-2
Company Name NameContact Type
Applicant THOMAS BARBER
Granted Permission THOMAS BARBER
Primary Owner THOMAS BARBER
Checklist Item CommentsPassed
bedroom(s) with gas appliances False
Low flow toilet 1.3 gal/flushing cycle False
Bathroom Fans, if no window True
3" Plumbing Vent through roof minimum 18 inch True
Grade away from foundation: 6" down, 10' out True
Final Survey Plot Plan False
Sewer Dept. Inspection Sticker False
Window guards req:<2' above floor/6' above grade False
Interior privacy/trim/doors/main entrance 36 True
Backflow Preventors where required True
Basement wall insulation R- value verified False
Emergency egress below grade True
Fuel Tanks above flood plain elevation False
Intake Openings False
Safety glazing: w/in 5' of tub/shower False
Site Plan / Variance required False
Seals on Garage Doors, esp. Wood False
Not less than 3' horiz from opening of bthrn True
Basement ceiling covered 2x8 fl joist or less False Provide mineral wool at plumbing traps
Attic Access Insulation = Attic R- Value False At pull down
Gas Shut-off Exposed & Regulator 12" min abv grd True Propane
Platform at all exterior doors True
Fireblocking at fl joist 80 s.f. or less False
Garage Floor Pitched False
Buried Fuel Tanks anchored in flood zone False
Wood deck: 2'+ from grade dia bracing required True Existing
Inter Connected True
Arc Fault Breaker Habitable Spaces False
Dryer Duct Max Length 35', Labeled Over 35'False
Energy Sticker on Elec. Panel:R-Val. & Heating Sys False
Furnace/Hot Water Heater operating True
Hot water drain pan to indirect waste False
September 25, 2023 Page 1 of 6
INSPECTION WORKSHEET (RESFINAL-026980-2023)
Checklist Item CommentsPassed
Fresh Air Intake False
Chimney Rain Cap Installed True
Basement stairs closed rise greater than 4 inches False Existing basement stairs
Foam in basement/attics covered w/thermal barrier False
Outside every bedroom area True
Oil Furnace Shut-Off at Entrance to Furnace Area False
Blower Door Test Certification False
Fin Elect; Energy Saving Light Bulbs 90 Percent False Provide final electrical
Heat detector in garage False
Gas Log In Sealed or Glass Enclosure True
OK to Issue C/O False 7/25/23 As per my phone conversation with Tom Barber I have
asked him to get into the Town to renew his building permit and
get the outstanding items closed out within the renewal time
period. The final electrical inspection should be performed asap
seeing he resides in the home. Tom said he would be in Monday
7/31/23 to renew his permit.
1. Provide insulation at box plate area
2. Firestopping at plumbing traps
3. Complete insulation at foundation walls as per REScheck.
4. Provide handrail at new basement stairs from exterior door.
5. Provide final electrical inspection
8/1/23 Residential Final Inspection Not Approved - Renewal Fee
has been paid today!
Remaining Items:
1. Provide insulation at box plate area. R21 unfaced in the box.
2. Firestopping at plumbing traps
3. Complete insulation at foundation walls as per REScheck.
Minimum of unfaced R15 with Poly.
4. Provide handrail at new basement stairs from exterior door.
5. Provide final electrical inspection
9/25/23 Residential Addition/Alteration Final Inspection Not
Approved
1. Provide insulation at box plate area. R21 unfaced in the box.
2. Firestopping at plumbing traps
3. Complete insulation at foundation walls as per REScheck.
Minimum of unfaced R15 with Poly.
4. Provide handrail at new basement stairs from exterior door.
5. Provide final electrical inspection
Tom I would like to schedule a walk through inspection of your
residence to get an accurate account on what you have to
complete in order to close out your building permit within a
reasonable amount of time. Even though you have renewed your
permit the completion of the work has taken way to long and
should be closed out sooner rather than later. Get back to me or
Kate and schedule a time that I can meet you at your residence.
Thanks!
John O'Brien
Director of Building and Code Enforcement
Town of Queensbury
Truss ID Signage Installed at Electrical Meter False
Range Hood 400+ cfm-Fresh Air REQUIRED False
September 25, 2023 Page 2 of 6
INSPECTION WORKSHEET (RESFINAL-026980-2023)
Checklist Item CommentsPassed
4 inch Building Number Address visible from road True
CO in bedrooms w/gas appliances False
HVAC Vent Terminal 10' from Lot Line & Openings False
Attic Access Gasketed True
Jack posts in basement lagged at top and bottom False
Flood Plain Certification, if required False
OK to Issue Temporary C/O False 7/25/23 As per my phone conversation with Tom Barber I have
asked him to get into the Town to renew his building permit and
get the outstanding items closed out within the renewal time
period. The final electrical inspection should be performed asap
seeing he resides in the home. Tom said he would be in Monday
7/31/23 to renew his permit.
8/1/23 Residential Final Inspection Not Approved - Renewal Fee
has been paid today!
Remaining Items:
1. Provide insulation at box plate area. R21 unfaced in the box.
2. Firestopping at plumbing traps
3. Complete insulation at foundation walls as per REScheck.
Minimum of unfaced R15 with Poly.
4. Provide handrail at new basement stairs from exterior door.
5. Provide final electrical inspection
9/25/23 Residential Addition/Alteration Final Inspection Not
Approved
1. Provide insulation at box plate area. R21 unfaced in the box.
2. Firestopping at plumbing traps
3. Complete insulation at foundation walls as per REScheck.
Minimum of unfaced R15 with Poly.
4. Provide handrail at new basement stairs from exterior door.
5. Provide final electrical inspection
Tom I would like to schedule a walk through inspection of your
residence to get an accurate account on what you have to
complete in order to close out your building permit within a
reasonable amount of time. Even though you have renewed your
permit the completion of the work has taken way to long and
should be closed out sooner rather than later. Get back to me or
Kate and schedule a time that I can meet you at your residence.
Thanks!
John O'Brien
Director of Building and Code Enforcement
Town of Queensbury
Chimney Height / B Vent / Direct Vent Location True
Carbon Monoxide Detectors:False
All Hot Water Systems: 3/4" or larger piping R-3 False
Interior/Exterior Railings 34 to 38 True
Roof Complete / Exterior Finish Complete False
5/8" Type X with Living Space Above False
20 Minute Fire Door/Self-Closing Hardware False
1/2" Gypsum-Bsmt Ceiling<2x10 Frame/TJI/Fl. Truss False
Furnace shut-off w/in 30 ft. or w/in line of site True
HRV or ERV Installed per Bedroom Requirements False
Every level, Every bedroom True
September 25, 2023 Page 3 of 6
INSPECTION WORKSHEET (RESFINAL-026980-2023)
Checklist Item CommentsPassed
Bathroom / Kitchen Watertight True
CSST/other piping in conduit if buried,if required False
As Built Septic System False Contact E Hall for septic asbuilt report
Guard at stairwell at 34" or more True
Foundation insulation to floor False Provide R 21 at box plate area/band joist, complete studding at
new foundation walls, provide R 15 at cavities of studding as per
REScheck.
Smoke Detectors:False
Handrail 4 or more risers False Provide handrail as discussed at basement stairs
Deck Ledger-Bolted per Code False
Low water shut-off boiler False
Handrail Termination at Newell Post or Wall False Provide at basement stairs
Outside Spigots have Air Gap False
Floor truss, draft stop- fin base 1,000 sq. ft.False
on all levels w/gas appliances (i.e. furnace)False
Crawl space/knee wall access insulated & gasketed False
Guard at deck, porches 36" or more True
6" clearance to sill plate False
Propane Tank: Proper Setback from Prop Line/Struct True
Duct work sealed properly False
Plumbing fixtures False
Battery backup True
Guards at stairs,decks,patios 30" + above grade True
Pull down stairs boxed out and insulated False
within 10' of all sleeping areas False
September 25, 2023 Page 4 of 6
INSPECTION WORKSHEET (RESFINAL-026980-2023)
Checklist Item CommentsPassed
General Comments False This is an expired permit, a renewal notice has been mailed to
you with no response. Please contact building department in
regards to this notice. If building department does not hear from
you within 2 weeks, another letter will be sent out for renewal.
Called T. Barber to remind him of renewal 2/12/18
3/5/18--permit renewed
2/6/20- spoke with T.Barber, he's to be in to renew permit by
2/7/20
Please comply
Stopped at site to address items to close out permit, Tom Barber
to make contact with building department to renew permit. 2/7/22
This is a 2015 permit, please provide renewal fee, complete listed
items to close this permit out. 7/28/22
7/25/23 As per my phone conversation with Tom Barber I have
asked him to get into the Town to renew his building permit and
get the outstanding items closed out within the renewal time
period. The final electrical inspection should be performed asap
seeing he resides in the home. Tom said he would be in Monday
7/31/23 to renew his permit.
8/1/23 Residential Final Inspection Not Approved - Renewal Fee
has been paid today!
Remaining Items:
1. Provide insulation at box plate area. R21 unfaced in the box.
2. Firestopping at plumbing traps
3. Complete insulation at foundation walls as per REScheck.
Minimum of unfaced R15 with Poly.
4. Provide handrail at new basement stairs from exterior door.
5. Provide final electrical inspection
9/25/23 Residential Addition/Alteration Final Inspection Not
Approved
1. Provide insulation at box plate area. R21 unfaced in the box.
2. Firestopping at plumbing traps
3. Complete insulation at foundation walls as per REScheck.
Minimum of unfaced R15 with Poly.
4. Provide handrail at new basement stairs from exterior door.
5. Provide final electrical inspection
Tom I would like to schedule a walk through inspection of your
residence to get an accurate account on what you have to
complete in order to close out your building permit within a
reasonable amount of time. Even though you have renewed your
permit the completion of the work has taken way to long and
should be closed out sooner rather than later. Get back to me or
Kate and schedule a time that I can meet you at your residence.
Thanks!
John O'Brien
Director of Building and Code Enforcement
Town of Queensbury
1/2" Gypsum or House Wall and Gable False
4+ Deck Joist Ledger Connections-24" From Ends False
Attic Access 22 x 30 minimum True
Knee wall/Crawl space 18" x 24"False
Relief Valve ,Heat Trap/Water Temp 110 deg or less False
Flex Gas Pipe Bonding False
Encl. Stairs Sheetrock Underside minimum ½ Gypsum False
September 25, 2023 Page 5 of 6
INSPECTION WORKSHEET (RESFINAL-026980-2023)
Checklist Item CommentsPassed
Basement Egress: 5s.f. window w/sill or Bilco door False
Fresh air supply 3' from grade False
Electronic as-builts False
September 25, 2023 Page 6 of 6