SUB (F) 5-2023►VL1Lit ►UlJ1X► ►llllLJ 1'►/-IF
DRAWING LIST
SURVEY
S1
ENGINEERING PLANS
Area Variance &
Planning Board
Submissions.
May 1S, 2023
S2 - OVERALL SUBDIVISION PLAN
S3 - OVERALL SUBDIVISION PLAN - LOT 2
S4 - LOT 2 DETAILED SITE PLAN - LOWER PORTION
SS - LOT 2 DETAILED SITE PLAN - HOUSE SITE
D 1 - WASTEWATER DETAIL SHEET
D2
- CONSTRUCTION
DETAIL
SHEET
D3
- CONSTRUCTION
DETAIL
SHEET
Cover Sheet
Sean Palladino &
Sarah Lockhart -Palladino
Lands of Walter & Karen Lockhart
2-Lot Subdivision &
New Single Family Residence
SUB 5-2023, AV 23-2023, SP 46-2023
PLANNING BOARD APPROVAL
APPROVED UNDER AUTHORITY OF A RESOLUTION
ADOPTED JUNE 22, 2023
BY THE PLANNING BOARD OF THE
TOWN OF QUEENSBURY, NEW YORK.
PLANNING BOARD CHAIRMAN
/
DATE SIGNED
ZONING BOARD OF APPEALS APPROVAL
1635 Bay Road
Town of Queensbury
Warren County
New York State
Tax Map #'s 265.1-1-43
Town of Queensbury
SEQR NEGATIVE DECLARATION FINAL STAGE SUBDIVISION APPROVAL
i_vl,)�i w iv►v r•eHr
Resubmission:Approval Resolutions &
Engineering Comments
WESTERN PORTION BEYOND
500-FT FROM BAY ROAD
LC-10A - LAND CONSERVATION 10-ACRE
MINIMUM LOT SIZE: 10-ACRES
FRONT SETBACK: 100'
SIDE SETBACKS: 100'
REAR SETBACK: 100'
SHORELINE SETBACK: 200'
BUILDING HEIGHT: 35'
LOT WIDTH: 400'
ROAD FRONTAGE: 400'
PERCENT PERMEABLE: 95%
- P Rom. C_6./_ 1 R J 4 f C
Approval & Filing
Drawings
August 29, 2023
EASTERN PORTION
WITHIN 500-FT OF
BAY ROAD
RR-3A - RURAL RESIDENTIAL 3-ACRE
MINIMUM LOT SIZE:
3-ACRES
FRONT SETBACK:
100'
SIDE SETBACKS:
75'
REAR SETBACK:
100'
SHORELINE SETBACK:
75'
MAX. BUILDING HEIGHT:
35'
MIN. LOT WIDTH:
400'
MIN. ROAD FRONTAGE:
400'
PERCENT PERMEABLE:
75%
SITE PLAN APPROVAL
Town of Queensbmy
Community Development Office
/ Town of Queensbury
Community Development Office
b) The project NOI and proof of coverage under the current NYSDEC SPDES General Permit, or an
Town of Queensbury
Community Development Office
et
Zoning Board of Appeals - Record of Resolution
6. In addition, the Board finds that the benefit to the applicant from granting the requested variance would
742 Bay Road, Queensbury, NY 12804
742 Bay Road, Queensbury, NY 12804
individual SPDES permit issued for the project.
742 Bay Road, Queensbury, NY 12804
Town of Queensbury 742 Bay Road Queensbury, NY 12804 (518) 761-8238
outweigh (approval) the resulting detriment to the health, safety and welfare of the neighborhood or
-
community;
Town of Queensbury Planning Board
Q Y g
Town of Queensbury Planning Board
Q Y g
8. Final approved plans, in compliance with the Subdivision, must submitted to the Community
3) Adherence to the items outlined in the follow-up letter sent with this resolution.
a) The limits of clearing will constitute a no -cut buffer zone, orange construction fencing shall
r"„ of rL�cn.abaq-
7. The Board also finds that the variance request under consideration is the minimum necessary;
RESOLUTION -Approve
Development Department before any further review by the Zoning Administrator or Building and Codes
m
Town of Queensbury Planning Board
installed around these areas and field verified by Community Development staff;
Area Variance Resolution To: Approve
SEQR RESOLUTION -Grant Negative Declaration
SUBDIVISION PRELIMINARY 4-2023 SEAN PALLADINO & SARAH LOCKHART PALLADINO
SUBDIVISION FINAL STAGE 5-2023 SEAN PALLADINO & SARAH LOCKHART PALLADINO
Personnel.
b) If applicable, the Sanitary Sewer connection plan must be submitted to the Wastewater
If
Applicant Name: Sean Palladino &Sarah Lockhart -Palladino
8. The Board also proposes the following conditions:
a) Adherence to the items outlined in the follow-up letter sent with this resolution.
Tax Map ID: 265.-1-43 /Property Address: 1635 Bay Road /Zoning: LC-1OA, RR-3A
Tax Map ID: 265: 1-43 / Property address: 1635 Bay Road /Zoning: LC-10A, RR-3A
9. The applicant must meet with Staff after approval and prior to issuance of Building Permit and/or the
PP PP P g
beginning of any site work.
RESOLUTION - Grant Site Plan Approval
SITE PLAN 46-2023 SEAN PALLADINO & SARAH LOCKHART PALLADINO
Department for its review, approval, permitting and inspection;
c) If curb cuts are being added or changed a driveway permit is required. A building permit will not be
File Number: AV 23-2023
The applicant proposes a two lot subdivision of a 25.1 acre parcel. Lot 1 will be 15.05 acres and will maintain
A subdivision application has been made to the Queensbury Planning Board for the following: Applicant
Tax Ma p ID: 265: 1-43 /Property Address: 1635 Bay Road /Zoning: LC-aOA, RR-3A
issued until the approved driveway permit has been provided to the Planning Office;
PP Y P P g
Location: 1635 Bay Rd.
Y
BASED ON THE ABOVE FINDINGS I MAKE A MOTION TO APPROVE AREA VARIANCE NO 23-
the existing home and associated site work. Lot 2 will be ]0.05 acres and will be used for the construction of a
a two lot subdivision of a 25.1 acre parcel. Lot 1 will be 15.05 acres and will maintain the existing
proposes P g
home and associated site work. Lot 2 will be 10.05 acres and will be used for the construction of a single
10. Subsequent issuance of further permits, including building
q P g g permits is dependent on compliance with this
d) If application was referred to engineering then Engineering sign -off required prior to signature of
Zoning Administrator of the approved plans;
2023, Introduced by Richard Cipperly, who moved for its adoption, seconded by James Underwood:
Tax Ma Number: 265: 1-43
P
ZBA Meeting Date: June 21, 2023
single family home and associated site work. The second lot will also require site plan review for the
t etion i 1e famil home ma' o
cons ru of a s ng y major st rmwater and 15% slopes. Pursuant to chapter 183, subdivision of
construction
family home and associated site work. The second lot will also require site plan review for the nsuvctinn
and all other conditions of this resolution;
The applicant has submitted an application to the Planning Board: Applicant proposes a single family home
e) Final approved plans should have dimensions and setbacks noted on the site plan/survey, floor plans
t
Duly adopted this 21' Day of June 2023 by the following vote:
a parcel shall be subject to Planning Board review and approval.
of a single family home major stormwater and 15 % slopes. Pursuant to chapter 183 subdivision of a parcel
Bl Y J Pe P � P
11. As -built tans to certify that the subdivision is developed according to the approved Tans to be provided
P Y P g PP P
with a footprint of 3,480 sq. ft. with associated site work. The project is to be located on a 10.05 acre parcel
and elevation for the existing rooms and proposed rooms in the building and site improvements; -
The ZoningBoard of A eals of the Town of Queensbury has received an application from Sean Palladino &
PP Q rl' PP
shall be subject to Planning Board review and approval.
nor to issuance of the certificate of occupancy;
� P Y;
as part of a two lot subdivision. The project includes 1.4 acres of site disturbance. Pursuant to chapter 179-3-
P
t) If required, the applicant must submit a copy of the following to the Town:
Sarah Lockhart -Palladino. Applicant proposes atwo-lot subdivision of a 25.1 acre parcel. Lot I is to be
15.05 home buildings for Lot 1
AYES: Mr. Urrico Mr. Henke] Mr. Ci erl Mr. Kuhl Mr. Underwood Mr. Keenan r. c
pp y, , M McCabe
j
The Planning Board has determined that the proposed project and Planning Board action is subject to review
P J g J
f
pursuant to relevant sections of the Town of Queensbury 'Coning Code -Chapter A-183, the Planning Board
12. Resolutions be included Final Subdivision
-
040, 179-19 02Q &chapter 147, site plan for construction of a single family home, major stormwater and
15% slopes shall be subject to Planning Board review and approval.
P J
a. The project NOI (Notice of Intent for coverage under the current "NYSDEC SPDES General
P J a`1 ) g
Permit from Construction Activity" prior to the start of an
y" p y site work.
acres and will maintain the existing accessory with no other work proposed.
Lot 2 is to be 10.05 acres for the construction of a single-family home and associated site work. Site for
under the State Environmental Quality Review Act;
has determined that this proposal satisfies the requirements as stated in the Zoning Code;
must on mylax;
g
j
b. The project NOT (Notice of Termination) upon completion of the project;
plan
g Y P
Lot 2 construction of asingle-family home. Relief is requested for lot width.
� NOES: NONE
i -
I.
The proposed action considered by this Board is Unlisted in the Department of Environmental Conservation
material in the file of
This application is supported with all documentation, public comment, and applicationBoard
d
Motion seconded by Brady Stark. Duly adopted this 22" day of June 2023 by the following vote:
Pursuant to relevant sections of the Town of Queensbury Zoning Code -Chapter 179-9-080, the Planning I
c. The applicant must maintain on their project site for review b staff:
PP P of Y
Regulations implementing the State Environmental Quality Review Act and the regulations of the Town of
record;
has determined that this proposal satisfies the requirements
p P q trements as stated in the Zoning Code;
i. The approved final plans that have been stamped b the Town Zoning Administrator.
PP P P Y g
Relief Required:
Queensbury;
AYES: Mr. Stark, Mrs. McDevitt, Mr. Eta, Mr. Deeb, Mr. Dixon, Mr. Longacker, Mr. Traver
These plans must include the project S WPPP (Storm Water Pollution Prevention Plan)
l
I
MOTION TO APPROVE SUBDIVISION FINAL STAGE 5-2023 SEAN PALLADINO & SARAH
NOES: NONE
As required by General Municipal Law Section 239-m the site plan application was referred to the Warren
when such a plan was prepared and approved;
LOCKHART PALLADINO Introduced by Michael Dixon who moved for its adoption.
The applicant requests relief for lot width for atwo-lot subdivision. Project occurs on a proposed I5.05 ac
PP �I ] P P
i
No Federal or other agencies are involved;
Count Planning Department for its recommendation;
Y g P
ii. The project NOI and roof of coverage under the current NYSDEC SPDES General
Pr 7 P 8
parcel & a proposed parcel of 10.05 ac. The parcel is split zone of Land Conservation 10 acres with the relief
for lot width in the Rural Residential 3 acres none.
1.
Part I of the Long EAF has been completed by the applicant;
1. The requirements of the State Environmental Quality Review Act have been considered and the Planning
The Planning Board opened a public hearing on the Site plan application on 6/22/2023 and continued the
Permit, or an individual SPDES permit issued for the project if required.
Final approved plans, in compliance with the Site Plan, must be submitted to the Community
g) PP P P Y
i
Part 2 of the Long EAF has been reviewed by the Planning Board;
Board has adopted a SEQRA Negative Declaration; and if the application is a modification, the
public hearing to 6/22/2023, when it was closed,
Development Department before any further review by the Zoning Administrator or Building and
Section 179-3-040 RR zone lot width
requirements of the State Environmental Quality Review Act have been considered, and the proposed
Codes personnel;
The lots do not meet the required lot width average. Lot 1 will have an average lot width of 618.1 ft. and Lot 2
Upon review of the information recorded on this EAF it is the conclusion of the Queensbury Planning
p Town of
modification[s] do not result in any new or significantly different environmental impacts, and, therefore,
The Planning Board has reviewed the application materials submitted by the applicant and all comments
h) The applicant must meet with Staff after approval and prior to issuance of Building Permit
proposes 400 fr. where 800 ft. lot width is required
Board as lead agency that this project will result in no significant adverse impacts on the environment, and,
he environment,
no further SEQRA review is necessary;
made at the public hearing and submitted in writing through and including 6/22/2023;
P g g g g
and/or the beginning of any site work;
therefore, an environmental impact statement need not be prepared. Accordingly, this negative declaration is
"
i) Subsequent issuance of further permits, including building permits is dependent on compliance with
SEQR Type II- no further review required;
issued.
2. Waiver requests ran
q granted: g� site lighting, h. signage,l. landscaping, n traffic, o. commercial alterations/
_ _ _ _
-- -
The Planning Board determines that the application complies with the review considerations and standards
this and all other conditions of this resolution;
construction details, r. construction/demolition disposal s. snow removal;
-- - - - - - - - --
set forth in Article 9 of the Zoning Ordinance for Site Plan approval, �,
j) As -built plans to certify that the site plan is developed according to the approved plans to be provided
A public hearing was advertised and held on June 21, 2023.
MOTION TO GRANT A NEGATIVE DECLARATION FOR SUBDIVISION PRELIMINARY 4-2023
3. The approval is valid for one (1) year from the date of approval. Applicant is responsible for requesting
2023582097
n Instr # 2023-3000062
prior to issuance of the certificate of occupancy.
k) This resolution is to be placed in its entirety on the final plans
SEAN PALLADINO & SARAH LOCKHART PALLADINO. Introduced by Michael Dixon who moved for
its adoption,
Upon review of the application materials, information supplied during the public hearing, and upon
an extension of approval before the one (1) year time frame has expired if you have not yet applied for a
building or commenced significant site work;
y'"J/ /�n/- _
3 09/01/2023 08:50:19
MOTION TO APPROVE SITE PLAN 46-2023 SEAN PALLADINO & SARAH LOCKHART
PALLADINO; Introduced by Michael Dixon who moved for its adoption.
consideration of the criteria specified in Section 179-14-080 A of the Queensbury Town Code and Chapter 267
P O Q 4' P
t y a
STATE OF N� N n. ,K )
permit
Y lT' AM
of NYS Town Law and after discussion and deliberation, we find as follows:
1. There is not an undesirable thane in the character of the neighborhood nor a detriment to nearby properties
g g Y P P
SS:
COUNTY OF WARREN)
I. Nllc %el iL S W `;,l Treasurer of the Cou t of rrerl
y
As per the resolution prepared by staff.
1. Part II of the Lon EAF has been reviewed and completed b the Planning Board.
g P Y g
4. The limits of clearing will constitute a no -cut buffer zone, orange construction fencing shall be installed
around these areas and field verified by Community Development staff
1 Pages
9
///� O MAP
j
According to the draft resolution prepared by Staff with the following:
Motion seconded by Brady Stark. Duly adopted this 22nd day of June 2023 by the following vote:
AYES: Mrs. McDevitt, Mr. Etu, Mr. Deeb, Mr. Dixon, Mr. Longacker, Mr. Stark, Mr. Traver
because thisisjustasimplesubdivision.
State Of NOW York, DO HEREBY CERTIFY that,
\
1) Waivers requested granted: g. site lighting, h. signage,1. landscaping, n traffic, o. commercial alterations/
aCCO i g t0 the r COrds
5. Engineering sign -off required prior to signature of Planning Board Chairman.
Pamela J. Vo el, Warren Co Clerk
9
construction details, r. construction demolition disposal s. snow removal, as these items typically
NOES: NONE
in my office, the taxes on the property sho non ap aV been
2. Part III of the Long EAF is not necessary because the Planning Board did not identify potentially
FILED
are
2. Feasible alternatives have been considered and there really are none. If this is what the owners want, this is
moderate to large impacts.
6. The applicant must submit a copy of the following to the Town:
associated with commercial projects;
the best outcome.
for the levied to 20JIto 20,�,.'�
a) The project NOI (Notice of Intent) for coverage under the current NYSDEC SPDES General Permit
2) The approval is valid for one (1) year from the date of approval. Applicant is responsible for requesting
an extension before the frame has
3. The requested variance is not substantial. We're not adding, subtracting or doing anything construction"
paid years
/ -
G L!� - -'
Motion seconded by David Deeb. Duly adopted this 22"d day of June 2023 by the following vote:
or for coverage under an individual SPDES prior to the start of a� site work.
b) The project NOT (Notice of Termination) upon completion of the project; and
of approval one (1) year time expired.
wise.
AYES: Mr. Dixon, Mr. Longacker, Mr. Stark, Mrs. McDevitt, Mr. Etu, Mr. Deeb, Mr. Traver
Wa(reR OtJrit Treasurer
y
7. The applicant must maintain on their project site, for review by staff:
These
4. There is not an adverse impact on the physical or environmental conditions in the neighborhood or district.
NOES: NONE
a) The approved final that have been stamped by the Town Zoning Administrator. plans must
Page 2 of 2
include the project SWPPP (Storm Water Pollution Prevention Plan) when such a plan was prepared
5. Were there any alleged difficulty it would be self-created because they made the application.
and approved; and
Page 1 o172
Page 2 of 2
Phone: 518.761,82201 Fax: 518.745.44371742 Bay Road, Queensbury, NY 128041 www.queensbury.net
i
Page 1 of2
Phone: 18. 61.822o Fax: 18. 2 Bay Road, Queensbury, NY 128o www.queensbury.net
5 7 � 5 745�4437�74 Y rY, 4�
Phone: 518.761.82zo Fax: 518J45�4437742 Bay Road, Queensbury, NY 128oy � www.queensbury.net
Phone: 518.761.8220 Fax: 518.745.44371742 Bay Road, Queensbury, NY 12804 www.queensbury.net
Phone: 518.761.82201 Fax: 518.745-44371742 Bay Road, Queensbury, NY 12804 www.queensbury.net
OWNER
WALTER & KAREN LOCKHART
1635 BAY ROAD
LAKE GEORGE, NY 12845
APPLICANTS
SEAN PALLADINO &
SARAH LOCKHART-PALLADINO
151 LOCKHART MOUNTAIN ROAD
LAKE GEORGE, NY 12845
29-1921
NOW OR FORMERLY
LANDS OF
JANE KILMER
BOOK 934, PAGE 102
TAX MAP: 265.00-1-45 IRON PIPE FOUND
(DISTURBED)
1 09
NOW LAOR FORMERLY
NDS OF
KEITH L. HARRIS and PAMELA J. HARRIS
BOOK 948, PACE 223
TAX MAP. 265-00-1-44
DRIVEWAY
—GRAVEL
GRAVEL DRIV
,W
lu-37LITY
WON ROD POLE
N 83-5244- E OLD VhRF FENCE 1523.38 x FT
_
x OLD WIRE FENCE X
D WIRE X F �NC�
IRON ROD
SET
NOW OR FORMERLY
LANDS OF
KEITH L. HARRIS and PAMELA J. HARRIS
BOOK 948, PAGE 223
TAX MAP: 265.00-1-32.1
NOW OR FORMERLY
LANDS OF
KEITH H. HARRIS and KELLY HARRIS
VOLUME 4779, PAGE 229
TAX MAP: 265.00-1-32.2
MAP REFERENCE
MAP EN7177-ED: "MAP OF A SURVEY MADE FOR
PAMELA J. HARRIS", PREPARED BY DAVID J. BOLSTER,
LAND SURVEYOR, QUEENSBURY, NEW YORK, DATED
APRIL Z 2013, LAST REVISED APRIL 16, 2013, AND
FILED IN THE WARREN COUNTY CLERKS OFFICE ON
MAY 24, 2013 IN PLAT CABINET C, SLIDE 316
TAX MAP REFERENCE
SECTION 265.00, BLOCK 1, PARCEL 43
NOTES
1) FIELD SURVEY PERFORMED FROM APRIL TO JULY, 2013.
2) CONTOURS SHOWN HEREON ARE AT A TWO FOOT INTERVAL.
ELEVATION DATUM WAS SCALED FROM THE U.S.G.S. QUADRANGLE.
3) GRADE PERCENTS SHOWN ALONG THE CENTERLINE OF
THE EXISTING WOODS ROAD REFLECT EXIS77NG SLOPE GRADE
BETWEEN 10 FOOT CONTOUR INTERVALS, WITH THE EXCEPTION
OF THE FIRST TWO GRADES LEAVING NORTHERLY FROM BAY ROAD.
4) SUBJECT TO ALL RIGHTS THE PUBLIC SERVICE UTILITY
COMPANIES MAY HAVE IN AND TO THE PREMISES.
5) SUBJECT To RIGHTS OF THE PUBLIC IN AND TO THE
ROAD SHOWN HEREON AS BAY ROAD.
6) SUBJECT TO ANY FACTS OF RECORD THAT MAY BE
DISCLOSED BY AN UP-TO-DATE ABSTRACT OF TITLE.
7) SUBJECT TO APPLICABLE LAWS AND/OR REGULATIONS
OF THE TOWN, COUNTY AND STATE REGARDING THE
SUBDIVISION OF LAND.
DIAMOND
61LEVERDAILF,'e'z_
4
POINT
ASSEMBLY
POINT"��
0;
HAIR
16AY
WOODS'
POINT
SITE
A\
EXIT
VICINITY MAP SCALE: 1" = 1.5 MI-±
�q
IRON ROD
0 SET
WOODED
IRON ROD
161.30' SET `-,
WOODED
S 84005"10" W
z
POLL
4�v
WOODED
4 LOT
TROT ROD LANES TO 8F -D By
SET LANDS - RETAINE
WALTER A. LOCKHART
15.05 ACRESt 1UPLaY
✓ -0-
1'BARNy POLE
FIELD
071tiTy
POLE
GARAGE
K) I / lj. .
RAGE.
CO
W;
; / 11; .7< . i PAW,
DRIVEWAY
STEP
s
PATIO &
CASED
LANDSrAPED
WELL*
AREA U TILI y
POLE rj
HOUSE
L
0
0 D E D
NOW OR FORMERLY
f
WOODED i LANDS OF
THE PEOPLE OF THE STATE OF NEW YORK
TAX MAP: 265.00-1-61
'n
Cb
f
�WOODED 14- f cb
A-
j
NOW OR FORMERLY
LANDS OF
ROGER W. FARR and MADELINE M. FARR, AS TRUSTEES
BOOK 3211, PACE 157
TAX MAP: 265-00-1-31
ON ROD
SET ZONING INFORMATION
EARINC:
EXS77N jMr DE IRTOWN OF QUEENSBURY
F I E L 0
AL
LAND CONSERVATION (LC-10A)
0 RURAL RESIDENTIAL (RR-3A
MIN. LOT SIZE:
3ACRES MIN. LOT SIZE: 10 ACRES
p
j LOT WIDTH: 400 FEET
LOT WIDTH: 400 FEET
IP ROAD FRONTAGE.' 400 FEET ROAD FRONTAGE: 400 FEET
DEPTH: — DEPTH:
WOODED MIN. SETBACKS. MIN. SETBACKS.
1
FRONT. 00 FEET
100 FEET
FRONT.
SIDE: 100 FEET
SIDE. 75 FEET
LOT REAR: 100 FEET REAR: 100 FEET
MIN. PERMEABLE.* 95%
MIN. PERMEABLE.- 757.
LANDS TO BE CONVEYED By �X -4—
MAX BLDG. HEIGHT. 40135 FEET MAX. BLDG. HEIGHT 35 FEET
WALTER A. LOCKHART <;
TO
,KHART-PALLIDINO
SEAN PALLIDWOS SARAH LOC
... . .... .
� ,�
10.05 ACRES±
Q
Z
MAP REVISION
V PROPOSED SITE CLEARING AREA,
AUGUST 24, 2013 TO SHOW
1); AND THE APPROXIMATE PROPOSED UNDERGROUND UTILITIES.
A C3�MAY 10, 2023 To REMOVE PROPOSED SITE CLEARING AREA,
U77LJI
THE APPROXIMATE PROPOSED UNDERGROUND UTILITIES AND
WOODED POLE
PROPOSED HOUSE, WELL & SEPTIC SYSTEM.
b -A1 2023582097
Instr # 2023-3000062
w 0 O;D ED,/ NOW OR FORMERLY
LANDS OF
09/01/2023 08:50:19 AM
1 Pages
MARGARET S. DE GRAIN MAPOF A SUBDIVISION
BOOK 2960, PAGE 161 MAP
LANDS OF
A TAX MAP. 265.00-1-61 Pamela J. Vogel, Warren Co Clerk FILED
f A. LOCKHART
WAS TIFF
PREPARED FOR
NOTE.
PALLADINO H KHART
EXIS77NG WOODS ROAD TO BE IMPROVED AND SARAPALLADINO
SEAN & LOC
PROPOSED To BE USED AS DRIVEWAY ACCESS
TO AND FROM THE PROPOSED HOUSE SITE SHOWN. IRON ROD, SITUATED IN
831,79' TOWN OF QUEENSBURY WARREN COUNT NEW YORK
Y,
993.09' RAILROAD 'MACK--""` 60� jU1_Y 18, 2013
RAIL FOUND STANDING SCALE.° I
VERTICAL IN GROUND
ON PROPERTY E SURVEY & MAP
UTILITY DEED REFERENCE APPLICANT OF t4,** BY
POLE/
/q, WALTER LA PAN SEAN PALLIDINO and DLP SURVEYING, LLC
SARAH LOCKHART—PALLIDINO
TO DONALD L. PIDGEON, Jr.
WALTER A. LOCKHART 1635 BAY ROAD PROFESSIONAL LAND SURVEYOR
DTD. OCTOBER 1, 1987 QUEENSBURY, NY N.Y.S. LICENSE NO .50372
u T R ADDITION —0480
ONLY COPIES MADE FROM THE ORIGINAL OF 'HIS NAU7HOM ED ALTFRA: ION 01 RCD. OCTOBER Z 1987 PHONE. 792
AN ORIGINAL TO - I
SURVEY MAP WHICH ARE MARKED WITH A SURVEY W SWING A UCENStO k, 16 MICHAEL ROAD
OF THE LAND) SijRVEYORS SEAL AVI) BEARING TiE �AND SURVEYORS SEAL IS A VIOLATION BOOK 697, PAGE 1001
SURVEyORs ORIGINAL SIGWATURE IN RED INK SM OF SECTION 7209 SUBDIVISION 2, OF NEW YORK 12828
BE coNSIDERED To BE VAI-0 AND TRUE 00�im 'PHE NEW YORK STATE EWCAMON LAW. z FORT EDWARD,
518-792-4146
Q-209-R2
ZONING REQUIREMENTS
WESTERN PORTION BEYOND
500-FT OF BAY ROAD
LC-10A - LAND CONSERVATION 10-ACRE
MINIMUM LOT SIZE:
10-ACRES
FRONT SETBACK:.
100,
SIDE SETBACKS:
100,
REAR SETBACK:
100,
SHORELINE SETBACK:
200'
BUILDING HEIGHT:
35'
LOT WIDTH:
400'
ROAD FRONTAGE:
400'
PERCENT PERMEABLE:
95%
ZONING REQUIREMENTS
EASTERN PORTION
WITHIN 500-FT OF BAY ROAD
RR-3A - RURAL RESIDENTIAL 3-ACRE
MINIMUM LOT SIZE:
3-ACRES
FRONT SETBACK:
100,
SIDE SETBACKS:
75'
REAR SETBACK:
100,
SHORELINE SETBACK:
75'
MAX. BUILDING HEIGHT:
35'
MIN. LOT WIDTH:
400'
MIN. ROAD FRONTAGE:
400'
PERCENT PERMEABLE:
75%
DENSITY CALCULATION
PARCEL AREA =
25.1-AC
LC-10A ACREAGE =
13.5-AC
AREAS > 20% SLOPES =
4.75-AC
USABLE ACREAGE IN LC-10A =
8.75-AC
ALLOWABLE LOTS IN LC-10A
8.75-AC / 10 AC/LOT =
0.8
RR-3A ACREAGE = 11.6-AC
AREAS > 20% SLOPES = 0.95-AC
USABLE ACREAGE IN RR-3A = 10.65-AC
ALLOWABLE LOTS IN RR-3A
10.65-AC / 3 AC/LOT = 3.5
TOTAL ALLOWABLE LOTS = 4.3
NUMBER OF PROPOSED LOTS = 2
AREA VARIANCE SUMMARY
NOW OR FORMERLY
LANDS OF
PAMELA HARRIS
TAX MAP: 265.00-1-32.1
NOW OR FORMERLY
LANDS OF
KEI TH HARRIS
TAX MAP: 265.00-1-32.2
WASTEWATER SYSTEM
COMPONENT SCHEDULE
SITE
IT PLAN
COMPONENT
SIZING & MATERIAL
SYMBOL
A
HOUSE SEWER
4" SDR-35 OR SCH-40 PVC
PIPE
SEPTIC TANK
1250 GAL PRECAST CONCRETE
,B
DUAL COMPARTMENT
C
EFFLUENT SEWER
4" SDR-35 OR SCH-40 PVC
PIPE
D
DISTRIBUTION BOX
(6) HOLE PRECAST CONCRETE
E
ABSORPTION FIELD
(4) PIPE-IN-STONE
TRENCHES @ 60' EACH
100% FUTURE
F
REPLACEMENT
SAME AS ABSORPTION FIELD
ABSORPTION FIELD
TOWN OF QUEENSBURY ZONING CODE, CHAPTER 179
SECTION 179-19-020 B.
- RESIDENTIAL LOTS ABUTTING COLLECTOR OR ARTERIAL ROADS
"ALL RESIDENTIAL LOTS FRONTING ON A COLLECTOR OR ARTERIAL ROAD... SHALL
HAVE TWO TIMES THE LOT WIDTH PERMITTED. THIS REQUIREMENT SHALL NOT
APPLY WHERE ADJOINING RESIDENTIAL LOTS EXIST OR ARE PROPOSED TO BE
ESTABLISHED AND THE WIDTH OF EACH LOT MEETS THE REQUIRED WIDTH OF
THE ZONE AND INGRESS OR EGRESS IS LIMITED TO AND PROVIDED BY A SINGLE
COMMON DRIVEWAY CENTERED ON THE COMMON PROPERTY LINE"
IT IS PROPOSED TO RETAIN EXISTING DRIVE FOR LOT 1 AND
CONSTRUCT NEW DRIVEWAY FOR LOT 2, THUS 800-FT OF ROAD
FRONTAGE IS REQUIRED PER LOT.
- 618.1-FT OF ROAD FRONTAGE PROPOSED FOR LOT 1
- 181.9 -FT OF RELIEF REQUESTED
- 400-FT OF ROAD FRONTAGE PROPOSED FOR LOT 2
- 400 -FT OF RELIEF REQUESTED
Dig Safely.
New -York
7 call Before You Dig
Wait The Required Time
17 Confirm Utility Response
0 Respect The Marks
Dig With Care
800-962-7962
www. digs afelynewyork.com
WASTEWATER SYSTEM SETBACK SCHEDULE
PROPERTY LINE
HOUSE
DRAINAGE DITCH
! INATERBODIES
SEPTIC TANK
10'
10'
10'
I 50' j
ABSORPTION FIELD
! 10'
20'
20'
100'
I NOW OR FORMERLY
LANDS OF
JANE KILMER
_ TAX MAP: 265.00-1-45 1,PE FOUND-
\ \ f
�\ \ NOW OR FORMERLY OLAND/
\ / /
� PAMELA HARRIS /
\� TAX MAP: 265.00-1-44 /
- DRIVEWAY
_ GRAIL-
/
---- -- GRAVE- L � � � a
N 83 52'44" E v 1523.38' /
�53oi J
75` SIDE SETBACK (BLDG)
100` SIDE SETBACK (BLDG) _ 52a / 100` SIDE SETBACK (BLDG)
J
io� NO SITE CHANGES ARE ,�
Fl-
St�j / f PROPOSED FOR LOT 1 �o�'.
...
L O T Q
i VIA rr. P; r: JIL
Z
15.05 ACRESt 100' WELL
SETBACK
i HOUSE ROOF LEADER NOTE / %� / / /�l / \ GA�f`GE `o
PIPE GUTTER DOWNSPOUTS TO \ / / �� / / s / � / /; GARAGE ` ? ry�0 '/
MAIN STORM BASIN� —� / o,, - �77 o i 1/ /
CASED
NRL
HOUSE00
O
1\
° NOW OR FORMERLY
LANDS of
PROP. CLEARING � 'V
THE PEOPLE OF THE STATE OF NEW YORK
�
S / ly/ LIMIT
�Cd / Sr�F I l �� TAX MAP: 253.-1-3
S e"njlh �e�00,
j
F
�a
LOT Q
i r ''VVY� Y r1i4,yy.
VAt TFP A< A', , <? rtMART
SFAN f'ALt.Al IN0, & ,`a. � ` � a?, =PALi A! IW0 Q Q�
PROP. LIMIT OF-
10. .,
i
05 ACRESt �y f � PROP. CONC. PROTECT DISTURBANCE
� v i J
WASHOUT ---- —�O = 62,000 SF = 1.42-AC
PROP. CLEARING
PROP. 3 W x TO \ o LIMIT
2 /=y � Z COBBLE FILLED DRIVESIDE \�
A ® CONVE`(ANCETRENCH
H \
j`
" am° \ /.:" J, �' PROP, VEGETATED
i DETENTION BASIN
PROP.1T, HDPE 1
� CULVERT
Q� ( l
® h PROP. 14` \ / NOW OR FORMERLY
100' SIDE SETBACK (BLDG) ` GRAVEL DRIVEW A`l
7T SIDE SETBACK (BLDG) `� \
� do
a�
!PON R''' z 10` P.L SETBACK (W I W)
161.30° _ e
o
S 84705'10" W 993.09'
PROP. VEGETATED
DETENTION BASIN
NOW OR FORMERLY PROP. TW x WD
LANDS OF COBBLE FILLED DRIVESIDE
LUJBLI INFILTRATION TRENCH
TAX MAP: 265.00-1-31
OVERALL SUBDIVISION PLAN
SCALE: 1 "=80'
GRAPHIC SCALE
.0 40 80 160
IN FEET
MAP REFERENCE
BASE MAPPING TAKEN FROM: "MAP OF A
SUBDIVISION LANDS OF WALTER A. LOCKHART
PREPARED FOR SEAN PALLADINO & SARAH
LOCKHART—PALLADINO SITUATED IN TOWN OF
QUEENSBURY, WARREN COUNTY, NEW YORK, DATED
JULY 18, 2022, PREPARED BY: DLP SURVEYING,
LLC, DONALD L. PIDGEON, JR. FORT EDWARD, NY
J LANDS OF
DEMERS
TAX MAP: 265.00-1-62
a G
� ys
O
420 INSTALL STABILIZED Rr „r CONSTRUCTION ENTRANCE
+ t
DURING INITIAL SITE WORK
NOW OR FORMERLY
LANDS OF
POWELL
TAX MAP: 265.00-1-63
2o23582097 Instr# 2023-3000062
09/01/2023 o&50:19 AM
c� 1 Pages
MAP
Pamela J. Vogel, Warren Co Clerk FILED
SITE DEVELOPMENT DATA -
LOT ,2
LOT AREA
437,945 SF = 10.05-AC
SITE FEATURE
IMPERVIOUS AREA
I
HOUSE
i 3100 SF
PORCHES
380 SF
DRIVE
6520 SF
TOTAL
10, 000 SF
PERCENT IMPERVIOUS
2.3%
PERMEABILITY
977%
TAX MAP # 265. -1-43
ALTERATION OF THIS DOCUMENT EXCEPT BY A LICENSED
PROFESSIONAL ENGINEER IS A VIOLATION OF NYS EDUCATION LAW.
SITE SOILS DATA SITE SOILS DATA
TEST PITS PERCOLATION TESTS
TP-1 — 1/8/22 BY L.W. DOBIE, P.E. PT-1 — 5112123 BY: L.W. DOBIE, P.E.
— LOT 2, UPPER PORTION STABILIZED PERCOLATION RATE:
0-4''' — TOPSOIL / FOREST DUFF 6 MINUTES PER INCH
4-30" — RED —BROWN FINE LOAMY SAND
30-66" — MEDIUM BROWN MEDIUM SAND PT-2 — 5112123 BY: L.W. DOBIE, P.E.
SOME COBBLES STABILIZED PERCOLATION RATE:
ROOTS ENTIRE DEPTH, NO BOUNDARY CONDITION 8 MINUTES, 30 SECONDS PER INCH
TP-2 — 1/8/22 BY. L.W. DOBIE, P.E. INFILTRATION TESTS \ /
— LOT 2 MIDDLE PORTION IT-1 — /
5/ 12 23 BY. • L.W. DOBIE, P.E.
0-4" — TOPSOIL / FOREST DUFF MIDDLE BASIN AREA
4-30" — RED —BROWN FINE LOAMY SAND STABILIZED INFILTRATION RATE:
30-68" — MEDIUM BROWN MEDIUM SAND 80 INCHES PER HOUR
FEW COBBLES %
ROOTS ENTIRE DEPTH, NO BOUNDARY CONDITION IT-2 - 5 BY: L. W. DOBIE, P.E.
LOWEERR DDRIRIVE BASIN AREA
TP-3 - 118122 BY. L. W. DOBIE, P.E. STABILIZED INFILTRATION RATE: `
- LOT 2, WASTEWATER AREA 40 INCHES PER HOUR
0-4" - TOPSOIL / FOREST DUFF
4-32" - RED -BROWN FINE LOAMY SAND
32-70" - MEDIUM BROWN MEDIUM SAND �--
ROOTS ENTIRE DEPTH, NO BOUNDARY CONDITION
TP-4 - 1/8/22 BY: L.W. DOBIE, P.E.
- LOT 2 NORTH OF DRIVE
00
L O T
LANI)S TO BE' REIAINED BY
BARN
/ WAIL TER K REA1 � 0CKHA i
15.05 A CRES±
O I GAGE
77` % 1
/ 0)
D� 0
CASED6
WELLir
• S
HC
Of
0-4 -TOPSOIL /FOREST DUFF
4-30" - ORANGE -BROWN FINE LOAMY SAND
30-66" LIGHT -MEDIUM BROWN FINE SAND 4
W/COBBLES �Q/
ROOTS ENTIRE DEPTH, NO BOUNDARY CONDITION
TP-5 - 1/8/22 BY. L.W. DOBIE, P.E. / l / � / •,�/-�- c) Q
- LOT 2 MID DRIVE
,
0-4" - TOPSOIL / FOREST DUFF \ Tp I 100wE`L Q0
4-36" -RED-BROWN FINE LOAMY SAND �s w� ��QQ
36-50" - MEDIUM BROWN MEDIUM SAND ;r - _ / 1 J SE�gpC 00, ��
ROOTS ENTIRE DEPTH YCONDITIONNO BOUNDAR
�l
O
,P
TP-6 - 1/8/22 BY. L.W. DOBIE, P.E. 1-90 - LOT 2 LOWER DRIVE J � ' � „ .. ,� � / ` / •.
\
0-4" - TOPSOIL / FOREST DUFF ` \
4-70" - RED -BROWN FINE SAND,
TRACE SILT, SOME LOAM ! T
ROOTS ENTIRE DEPTH, NO BOUNDARY CONDITION
0
Dig OSafely.
New York
0 Call Before You Dig
Wait The Required Time
F� Confirm Utility Response
El Respect The (Marks
tI Dig With Care
1300.962.7962
www.digsafelynewyork.com
3 j
j
W
IPA
0
/ s
LOT(2)
a I�
A sr HEN L 0 CKHAR T
.i� ��gg �gpg gap �g TO
p �# p p50
iolZ / / O� AN fJAL ADIN0 a gA fi a LO IIAR.f -PALL.. k,, Wd
otz10, 05 ACRES± WASHOUT
PROP. TV4 x T D
COBBLE FILLED DRIVESIDF `
/ HOUSE ROOF LEADER NOTE
/ PIPE GUTTER DOWNSPOUTS TO \
MAIN STORM BASIN \ \ \
PROP. IT, HDPE
/ CULVERT
A 0� INV.1 = 431
INV. 2 = 430 J
PROP.14'
GRAVEL DRIVEW AY
` low SIDE SETBACK (BLDG)
LXh0 ` \ \
\
75 SIDE SETBACK BLDG ` \
) PROP. VEGETATED
DETENTION BASIN
BERM EL. 420
PROP. TV4x4°Dx25'L—
/���! COBBLE FILLED
v� COLD WEATHER
INFILTRATION TRENCH
�O / PROP. 4'W ROCK —
OUTLET WEIR
EL 419.75
5UT. 79' 10° P.L. SETBACK (W I W) —
S 84 °05'10" W 993. 09' PROP. 3'W x TD -
nnonc — ■ — ran r11—mm
WASTEWATER SYSTEM SETBACK SCHEDULE
PROPERTY LINE
HOUSE
DRAINAGE DITCH
WATERBODIES
SEPTIC TANK
10'
I 10"
10'
50'
ABSORPTION FIELD
10'
20'
20'
100'
OVERALL SUBDIVISION PLAN - LOT 2
SCALE: 1 "=40'
GRAPHIC SCALE
20 0 20 40 80
( IN FEET •�
N, /
MAP REFERENCE l
BASE MAPPING TAKEN FROM: MAP OF A
SUBDIVISION LANDS OF WALTER A< LOCKHART.,
PREPARED FOR SEAN PALLADINO & SARAH
LOCKHART-PALLADINO SITUATED IN TOWN OF
QUEENSBURY, WARREN COUNTY, NEW YORK, DATED
JULY 18,, 2022, PREPARED BY: DLP SURVEYING,
LLC, DONALD L. PIDGEON, JR. FORT EDWARD, NY
INSTALL STABILIZED
CONSTRUCTION ENTRANCE
DURING INITIAL SITE WORK
/Io
O Y
/ I GARAGE 1�
Cb
/ J
1 J
)USE f O
i l
0P/
vj PROP. 4 W ROCK
v OUTLET WEIR
''W IROCK OUTFALL
J EL.429.75
/ PROP. LIMIT OF
PR03ECT DISTURBANCE
= 62,000 SF = 1.43-AC
PROP.3'W x4`Dx3VL
COBBLE FILLED
COLD WEATHER
INFILTRATION TRENCH
PROP. CLEARING
LIMIT
PROP. SEDIMENT
CONTROL FENCE
(TYPICAL)
PROP. VEGETATED
DETENTION BASIN
BASE EL. 429
PROP. VEGETATED
DETENTION BASIN
BERM EL. 430.25
PROP. 3'W x 2 D
COBBLE FILLED
CONVEYANCETRENCH
2023582097 Instr # 2023-3000062
C` 09/01/2023 08:5019 AM
1 Pages
MAP
Pamela J. Vogel, Warren Co Clerk FILED
WASTEWATER SYSTEM
i
COMP PENT SCHEDULE
SITE PLAN
COPIPONENT
I
SIZING &MATERIAL
SYMBOL
A
HOUSE SEWER
4" SDR-35 OR SCH-40 PVC
PIPE
B
SEPTIC TANK
1250 GAL PRECAST CONCRETE
DUAL COMPARTMENT
C
EFFLUENT SEWER
4" SDR-35 OR SCH-40 PVC
PIPE
D
DISTRIBUTION BOX
(6) HOLE PRECAST CONCRETE
E
j ABSORPTION FIELD
(4) PIPE -IN -STONE
l
TRENCHES @ 60' EACH
I 10046 FUTURE
F
REPLACEMENT
SAME AS ABSORPTION FIELD
ABSORPTION FIELD
TAB' MAP # 265.-1-43
ALTERATION OF THIS DOCUMENT EXCEPT BY A LICENSED
PROFESSIONAL ENGINEER IS A VIOLATION OF NYS EDUCATION LAW.
'y 1
Od
4.1
j
l LOT
PROP. IV2.5 HORIZONTAL
2 VEGETATED BACKSLOPE,
TOPSOIL, SEED &INSTALL
EROSION CONTROL BLANKETS
P WASHOUT
ToPROP.TW x2O
COBBLE FILLED DRIVESIDE
y /LLADI\ CONVEYAHCETRENCH
.`,, �
10. 05 A CRES±
PROP. 4" PVC
— — HOUSE SEWER
PROP. 3.250 GAL
PRECAST CONCRETE /
1 _ SEPTIC TANK,
��- DUAL COMPARTMENT
�— PROP, 4" PVC
EFFLUENT SEWER
r
75 SIDE SETBACK (BLDG)
WASTEWATER SYSTEM SETBACK SCHEDULE '
PROPERTY LINE
HOUSE
I DRAINAGE DITCH
I
WATERBODIES
SEPTIC TANK
10'
10'
10'
50'
ABSORPTION FIELD
10'
20'
20'
100'
IV P.L. SETBACK (W I W)
�. PROP. -IT, HDPE —�
CULVERT
INV. I = 431 \
INV. 2 = 430
PROP.14'
GRAVEL DRIVEWAY
i
PROP. VEGETATED —
\ DETENTION BASIN
I \ BERM EL. 420
I, 1 PROP. 3'W x 4'113 x 25'L
I I COBBLE FILLED
COLD WEATHER
INFILTRATION TRENCH
PROP, 4'W ROCK
OUTLET WEIR
EL. 419.75
PROP. TW x TD
COBBLE FILLED DRIVESIDE
INFILTRATION TRENCH
Dig P/ISafely,
NewY®rk LOT 2 DETAILED SITE PLAN - LOWER PORTION GRAPHIC SCALE
0 Call Before You Dig
r] Wait The Required Time SCALE. 1 "=20' 10 0 10 20 40
0 Confirm Utility Response
0 Respect The Marks
IN FEET
Dig With Care
600-962.7962
www.digsafelyneviyork.com
PROP. CONVENTIONAL
ABSORPTION FIELD
k4) 2 W PIPE -IN -STONE
TRENCHES @ 65W EA.
2023582097
Instr # 2023-3000062
S3 09/3 08:50:19 AM
1 Pages
MAP
Pamela J. Vogel, Warren Co Clerk FILED
TAX MAP # 265.4-43
ALTERATION OF THIS DOCUMENT EXCEPT BY A LICENSED
PROFESSIONAL ENGINEER IS A VIOLATION OF NYS EDUCATION LAW.
WASTEWATER SYSTEM DESIGN
; " PVC SDR-35
INLET
MIN. SLOPE
1/4" PER FOOT
WATERTIGHT SLEEVE
AND SEAL (TYP)
PROPOSED 1250 GAL
DUAL COMPARTMENT
PRECAST CONCRETE
SEPTIC TANK
12" CRUSHED
STONE BASE
30" MAX N
2" MIN.
6"
314" TO 1 112"
WASHED CRUSHED STONE
Dig 'Safely.
New York
Call Before You Dig
0 Wait The Required Time
F1 Confirm Utility Response
0 Respect The Marks
El Dig With Care
800-962-7962
www. d ig safe lynewyo rk.com
APPROXIMATE
FINISHED GRADE
POLYETHYLENE EXTENSION TO GRADE
WITH TAMPER RESISTANT ACCESS COVER
2" MIN. DROP
-
-
BETWEEN INVERTS
12 MIN.
I -SUGGESTED: INSTALL POLYLOK
COVER
PL-122 FILTER SUCH THAT IT
�\
_
IS READILY REMOVABLE THROUGH 12" MAX.
a
TANK ACCESS COVER COVER
a °
DISTRIBUTION BOX
J 2
q] 4" PVC SDR-35
6"MIN.
LILEVEL
OUTLET r 2" MIN.
113 1
MIN. SLOPE BAFFLE —
16"
4"H x18"W SLOT,—\
DEPTH 18
118" PER FOOT DISTRIBUTION BOX NOTES
(2) 4" ELBOWS \ -
OF OUTLET MIN.
6" CRUSHED-� o o • PIPE JOINTS TO BE SEALED WITH
OR 6" ELBOW `
INVERT
STONE BASE ASPHALTIC MATERIAL OR EQUIVALENT.
a
-
,
- ® INVERT ELEVATIONS --OF ALL OUTLET
USE SPEED LEVELERS TO PIPES MUST BE EQUAL, USE SPEED
w? Q
ASSURE ALL OUTLETS ARE AT LEVELERS.
EXACTLY THE SAME ELEVATION D-BOX TO BE INSTALLED IN
j 0
�'
60-75% OF
25-40% OF
4" PVC SDR-35 SOLID HEADER CONFORMANCE WITH MANUFACTURER'S
CY CD
TANK VOLUME
TANK VOLUME
TO PERFORATED TRENCH PIPING, INSTRUCTIONS.,
118" PER FOOT MIN SLOPE
MINIMUM 2X WIDTH
MAXIMUM 4X WIDTH
SEPTIC TANK NOTES
ALL UNITS SHALL COMPLY WITH THE REQUIREMENTS OF THE NEW YORK STATE
DEPARTMENT OF HEALTH APPENDIX 75-A AND SHALL BE OF PRECAST
°
a
8 CONCRETE AS MANUFACTURED BY UTOPIA ENTERPRISES OR EQUAL.
0 0 0 0
> o 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 o
0 0 0 0 ALL STRUCTURES SHALL BE PLACED ON FIRM, COMPACT SAND OR GRAVEL
BASE. WHERE EXISTING SOIL CONDITIONS ARE UNSUITABLE, CRUSHED STONE
0 0 0 0 0
> o 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 o SHALL BE PLACED AS NECESSARY TO ACHIEVE A STABLE BASE.
0 0 0 0
SEPTIC TANKS INSTALLED IN TRAFFIC AREAS SHALL BE OF EXTRA HEAVY
SEPTIC TANK DETAIL
CONSTRUCTION DESIGNED FOR H-20 WHEEL LOADING.
NTS
ALL JOINTS MUST BE SEALED WITH BUTYL SEALANT. JOINTS BELOW THE
LIQUID LEVEL MUST BE TESTED BEFORE BACKFILLING.
SLOPE
4" MIN. TOPSOIL NATIVE SOILS 6' TYP. TRENCH SPACING
4" MIN TOPSOIL OVER THE ENTIRE ABSORPTION FIELD,
SEED AND ESTABLISH TURF
FILTER FABRIC
MIRAFI 14ON OR EQUIVALENT
4" PERFORATED PVC LATERAL, SLOPE 1116" —
1/32" PER FT. MEETING ASTM STANDARDS FOR PIPE
USED IN SEPTIC SYSTEMS
ABSORPTION TRENCH PROFILE
4" MIN TOPSOIL 0 VER THE
ENTIRE ABSORPTION FIELD;
SEED & ESTABLISH TURF
BACKFILL FREE OF
STONES OVER 3"
OVERFILL TO ALLOW
FOR SETTLEMENT
5' MINIMUM COVER
POWER
-�—TO HOUSE
(10' MIN)
VVATERTIGHT COVER
18" MIN
�{ FINISHED GRADE
i
PI TLESS ADAPTER,
A 2" ANNULUS OF NEAT CEMENT OR
BENTONITE GROUT IS REQUIRED. SEAL CASING TO BEDROCK
REFER TO CITED PUBLICATION FOR
MINIMUM REQUIRED DEPTH OF GROUT 50' MIN. CASING
WATER SUPPLY WELLS SHALL BE
CONSTRUCTED IN ACCORDANCE WITH THE
STANDARDS OF APPENDIX 5-B OF THE
NYS SANITARY CODE
WELL DETAIL
N TS
SUBMERSIBLE PUMP
MINIMUM TRENCH WIDTH
---MACHINE BACKFILL W/NATIVE
TOPSOIL & MATERIAL AS NEEDED DUE TO FIN
ESTABLISH TURF O GRADE (4" MAX. SIZE)
4" SDR-35 HOUSE OR— SELECT GRANULAR MATERIAL
EFFLUENT SEWER (100% PASSING 2" SIEVE) 6"
ABOVE PIPE & 2" BELOW PIPE
SEWER TRENCH DETAIL
N TS
3—BEDROOM RESIDENCE
WATER SAVING FIXTURES
(1.6 GPF MAX. FLUSH, 3.0 GPM MAX. FAUCETS)
DESIGN FLOW — 110 GPD/BEDROOM
SYSTEM DESIGN FLOW — 330 GPD
SEPTIC TANK - 1250 GAL PRECAST CONCRETE - DUAL COMPARTMENT
LEACH FIELD - STANDARD PIPE -IN -STONE ABSORPTION TRENCHES
6' MINIMUM TRENCH SPACING
DESIGN PERCOLATION RATE = 8-10 MIN/IN
APPLICATION RATE = 0.9 GPD/SF
ABSORPTION TRENCH AREA REQUIRED = 367 SF
ABSORPTION TRENCH LENGTH REQUIRED = 184 LF
INSTALL (4) TRENCHES AT 60 LF EACH
240 LF TOTAL TO BE PROVIDED
POTABLE WATER SUPPLY - NEW ON -SITE WELL
- MAINTAIN 50' WELL TO SEPTIC TANK SETBACK
- MAINTAIN 100' WELL TO ABSORPTION FIELD SETBACK
SYSTEM INSTALLATION NOTES
CONSTRUCTION SHALL BE AS SHOWN ON THIS DRAWING AND IN
ACCORDANCE WITH THE N.Y.S. DEPARTMENT OF HEALTH INDIVIDUAL
HOUSEHOLD SYSTEMS AND ASTM F481 INSTALLATION OF THERMOPLASTIC
PIPE AND CORRUGATED TUBING IN SEPTIC TANK LEACH FIELDS.
AFTER EXCAVATION OF 2' WIDE TRENCH TO THE DEPTHS REQUIRED, THE
WALLS AND FLOOR SHALL BE CLEANED AND RAKED IN ORDER TO
LOOSEN SMEARED SECTIONS OF TRENCH,
PLACEMENT OF CRUSHED STONE, PERFORATED PIPE AND FILTER FABRIC
SHALL BE AS SHOWN, AND CARE SHALL BE EXERCISED TO AVOID
INCLUSION OF FINE GRAINED SOILS AND WASTE MATERIAL IN THE STONE
AND PIPE.
THE PIPE SHOULD BE LAID AT THE GRADES INDICATED, MAINTAINING
STRAIGHT CONTINUOUS GRADES WITHOUT SAGS, HUMPS, SEPARATED
JOINTS, OR OTHER UNSUITABLE CONDITIONS. PIPE SHALL BE LAID WITH
HOLES DOWN IN ALL CASES.
ALL DISPOSAL FIELDS SHALL BE GRADED TO SHED RAINFALL AND DIVERT
SURFACE RUNOFF AWAY FROM THE DISPOSAL FIELD.
DO NOT USE HEAVY EQUIPMENT WITHIN THE ABSORPTION AREA AFTER
PIPING HAS BEEN INSTALLED.
THIS SYSTEM IS DESIGNED FOR WATER CONSERVING FIXTURES AND IS
NOT DESIGNED TO ACCOMODATE EXTREME WATER USE OR EXTREME
ORGANIC LOADING DEVICES SUCH AS JACUZZI TYPE SPAS OR GARBAGE
GRINDERS.
ROOF, FOOTING, GARAGE, CELLAR AND SURFACE WATER DRAINAGE MUST
BE EXCLUDED FROM THE WASTEWATER SYSTEM.
THE WASTEWATER SYSTEMS MUST BE INSPECTED FOR COMPLIANCE BY
THE DESIGN ENGINEER DURING CONSTRUCTION.
FILTER FABRIC 1 2023582097
6 MIN. MIRAFI 140N 6-12" Instr # 2023-3000062
OR EQUAL 2` TRENCH WIDTH /�i 1,-( 5� 09/01/2023 08:50 19 AM
o�CU00 U V t�!'r 1 Pages
00 (7 MAP TAX MAP # 265.4-43
2' M_ IN. ���� Pamela J. Vogel, Warren Co Clerk FILED ALTERATION OF THIS DOCUMENT EXCEPT BY A LICENSED
o O 01 I PROFESSIONAL ENGINEER IS A VIOLATION OF NYS EDUCATION LAW.
O
12" MIN.
6" °�� ?00
END CAP ���D0o /)CIO�00 - -- -- -
�J14" TO 1-112"
WASHED CRUSHED STONE
ABSORPTION TRENCH SECTION
NTS NTS
I
WASTEWATER SYSTEM SETBACK SCHEDCILE
PROPERTY LINE
HOUSE_
I DRAINAGE DITCH
WATERBODIES
SEPTIC TANK
10'
10'
10'
50'
ABSORPTION FIELD
10'
20'
20'
100'
S.W. P. P. P REQUIREMENTS
• THE CONTRACTOR UNDERTAKING SITE CONSTRUCTION OF THIS PROJECT MUST SIGN
THE CERTIFICATION IN THE SWPPP NARRATIVE REPORT AND BE FAMILIAR WITH ALL
REQUIREMENTS OF THE SWPPP AND .REQUIREMENTS OF THE NYSDEC SPDES
GENERAL PERMIT FOR STORMWATER DISCHARGES FROM CONSTRUCTION ACTIVITY
GP-0-20-001. A COPY OF THE PERMIT IS ENCLOSED IN THE SWPPP INSPECTION
BINDER.
• A NOTICE OF INTENT (N01) MUST BE SUBMITTED TO NYSDEC PRIOR TO INITIATING
WORK.
• AN MS4 SWPPP ACCEPTANCE FORM AND COPY OF THE NOI MUST BE SUBMITTED
TO THE TOWN OF QUEENSBURY MS4 ADMINISTRATOR FOR APPROVAL AND
SIGNATURE, SO THAT THE N01 CAN THEN BE SUBMITTED TO NYSDEC CENTRAL
OFFICE.
• A N01 FOR THE PROJECTS IN THEIR ENTIRETY IS TO BE SUBMITTED BY THE
PROJECT SPONSOR AND UPON CONVEYANCE OF EACH LOT, A NOI IS TO BE
SUBMITTED TO TRANSFER PERMIT COVERAGE TO EACH RESPECTIVE LOT OWNER.
• THE SWPPP INCLUDES INFORMATION ON ALL DRAWINGS AND THE STORMWATER
MANAGEMENT REPORT.
• AFTER THE COMMENCEMENT OF CONSTRUCTION, THE OWNER OR OPERATOR
SHALL HAVE A QUALIFIED INSPECTOR MAKE A MINIMUM OF (1) INSPECTION
EVERY (7) CALENDAR DAYS AND SHALL PREPARE A REPORT AS REQUIRED
BY THE GENERAL PERMIT
• WHEN SOIL DISTURBANCE ACTIVITIES HAVE BEEN TEMPORARILY SUSPENDED AND
ALL DISTURBED AREAS HAVE BEEN STABILIZED, SITE INSPECTIONS SHALL BE
PERFORMED MONTHLY. THE MS4 ADMINISTRATOR SHALL BE NOTIFIED IN WRITING
THAT THE FREQUENCY OF SITE INSPECTIONS WILL BE REDUCED DUE TO
CONSTRUCTION ACTIVITIES BEING SUSPENDED.
• IF SOIL DISTURBANCE ACTIVITIES HAVE BEEN SHUT DOWN WITH PARTIAL PROJECT
COMPLETION, INSPECTIONS MAY BE CEASED IF ALL DISTURBED AREAS HAVE BEEN
STABILIZED AND ALL STORMWATER MANAGEMENT PRACTICES HAVE BEEN INSTALLED
WITHIN THE PORTION OF THE PROJECT WHICH HAS BEEN COMPLETED. THE MS4
ADMINISTRATOR SHALL BE NOTIFIED IN WRITING THAT THE CONSTRUCTION
ACTIVITIES AND INSPECTIONS ARE BEING SUSPENDED.
• THE CONTRACTOR SHALL MAINTAIN A RECORD OF ALL INSPECTION REPORTS IN A
SITE LOG BOOK, MAINTAINED ON SITE AND AVAILABLE TO THE PERMITTING
AUTHORITY UPON REQUEST.
• AT COMPLETION OF CONSTRUCTION, THE CONTRACTOR AND ENGINEER SHALL
PERFORM A FINAL INSPECTION TO CERTIFY THAT THE SITE HAS UNDERGONE FINAL
STABILIZATION AND THAT ALL TEMPORARY EROSION AND SEDIMENTATION CONTROLS
HAVE BEEN REMOVED. UPON CERTIFICATION OF COMPLETION, A NOTICE OF
TERMINATION (NOT) SHALL BE FILED WITH NYSDEC CENTRAL OFFICE.
• THE MS4 ACCEPTANCE STATEMENT ON THE NOT MUST BE SIGNED BY THE MS4
ADMINISTRATOR SO THAT THE NOT CAN THEN BE SUBMITTED TO NYSDEC CENTRAL
OFFICE.
STABILIZATION
THE CONTRACTOR SHALL INITIATE STABILIZATION MEASURES AS SOON AS
PRACTICABLE IN PORTIONS OF THE SITE WHERE ACTIVITIES HAVE TEMPORARILY OR
PERMANENTLY CEASED, BUT IN NO CASE MORE THAN 7—DAYS.
STABILIZATION OF GRASS AREAS INCLUDES HYROSEEDING USING TACKIFIER ON SLOPES
OVER 1:5 OR SEEDING AND INSTALLING A CONTINUOUS COVER OF STRAW MULCH
EROSION & SEDIMENT CONTROL NOTES
• BEFORE ANY CLEARING OR GRUBBING OF THE SITE IS INITIATED, AND DURING
EARTHWORK PHASES, SEDIMENT CONTROL FENCE SHALL BE INSTALLED AS SHOWN
ON THE PLAN.
• AT THE CONCLUSION OF EACH DAYS WORK AND AFTER EVERY STORM EVENT,
SEDIMINT CONTROL FENCE AND ANY OTHER EROSION CONTROL MEASURES SHALL
BE INSPECTED FOR FAILURES OR SEDIMENT ACCUMULATION. ANY FAILURE SHALL
BE IMMEDIATELY CORRECTED.
• ALL BARE EARTH AREAS SHALL BE SEEDED AND MULCHED WITHIN 7—DAYS OF
COMPLETION OF WORK IN THE AREA. ONLY AREAS WHICH AREA ACTIVELY UNDER
CONSTRUCTION MAY REMAIN OPEN FOR MORE THAN 7—DAYS. ONCE
CONSTRUCTION IS COMPLETED IN THESE AREAS, SEED AND MULCH SHALL BE
INSTALLED WITHIN 7—DAYS.
• WITHIN 500' OF M.H.W. OF ANY LAKE, POND, RIVER, STREAM OR WETLAND, NO
LAND AREA, INCLUDING AREAS SOTCKPILED WITH EARTHEN MATERIALS, WHICH HAS
BEEN CLEARED, MAY BE LEFT DEVOID OF VEGETATION FOR MORE THAN 24—HOURS
WITHOUT A PROTECTIVE COVERING SECURELY PLACED OVER THE ENTIRE AREA
AND/OR EROSION CONTROL MEASURES PROPERLY INSTALLED TO PREVENT
SEDIMENTS FROM ENTERING THE WATERBODY. ACCEPTABLE PROTECTIVE COVERINGS
INCLUDE. NATURAL MULCH OF A DEPTH OF 2—INCHES, ROCK RIPRAP,
NON—DEGRADEABLE MATERIALS SUCH AS PLASTIC OR CANVAS COVERINGS AND
IMPERVIOUS STRUCTURES.
• TEMPORARY EROSION CONTROL MEASURES, INCLUDING SEDIMENT CONTROL FENCE
AND/OR MULCH, SHALL BE INSTALLED AND MAINTAINED FOR ANY TEMPORARY
SOIL STOCKPILE AREAS THAT ARE TO BE LEFT FOR MORE THAN 24—HOURS.
• NO LAND AREA MAY BE LEFT DEVOID OF VEGETATION FOR MORE THAN 7—DAYS
WITHOUT A PROTECTIVE COVERING SECURELY PLACED OVER THE _-EENTIRE AREA
AND/OR EROSION CONTROL MEASURES PROPERLY INSTALLED.
• FOR GROUND CLEARING ACTIVITIES OCCURRING BETWEEN OCTOBER 15 & APRIL 15,
IN WHICH VEGETATION CANNOT BE ESTABLISHED, EXPOSED EARTHEN AREAS SHALL
BE COVERED WITH EITHER A TARP COVER OR AN EXTRA HEAVY LAYER OF MULCH.
• ANY AREA OF REVEGETATION MUST EXHIBIT A SURVIVAL OF A MINIMUM OF 807. OF
THE VEGETATION THROUGHOUT THE YEAR FOLLOWING REVEGETATION. REVEGETATE
AS NEEDED TO MEET THIS REQUIREMENT
• THE CONTRACTOR SHALL COMPLY WITH THE NEW YORK STATE STANDARD
SPECIFICATIONS FOR EROSION AND SEDIMENT CONTROL (THE BLUE BOOK).
MAINTENANCE - EROSION CONTROL
• ALL EROSION AND SEDIMENT CONTROL DEVICES SHALL BE INSPECTED WITHIN
24—HOURS OF A STORM EVENT AND REPAIRED AND/OR MODIFIED AS REQUIRED TO
BE IN GOOD WORKABLE CONDITION.
• THE CONTRACTOR SHALL CONDUCT AN INSPECTION OF THE SITE ON A DAILY BASIS
TO COLLECT LITTER AND CONSTRUCTION DEBRIS AND DISPOSE OF LEGALLY.
• ANY STOCKPILES OF FILL, TOPSOIL OR EXCAVATED MATERIAL SHALL BE COVERED
OR CONTAINED BY SEDIMENT CONTROL FENCE TO PREVENT EROSION.
SMP MAINTENANCE NARRATIVE
THE HOMEOWNER WILL PROVIDE THE MAINTENANCE NEEDED IN ORDER TO ENSURE
CONTINUOUS AND EFFECTIVE OPERATION OF THE STORMWATER CONTROL PRACTICES BOTH IN
THE SHORT AND LONG TERMS.
WATERED INTO PLACE. ON SLOPES OVER 1:3 INSTALL EROSION CONTROL BLANKETS SEDIMENT REMOVAL IN THE CONVEYANCE TRENCHES AND VEGETATED DETENTION AREAS
OR WOOD CHIPS IN ACCORDANCE WITH MANUFACTURERS INSTRUCTIONS. SHOULD BE PERFORMED ANNUALLY OR SEMI-ANNUALLY. IF REDUCED INFILTRATION IS REALIZED
STABILIZED
CONSTRUCTION
ACCESS DETAIL
N TS
Dig Safely.
Newyork
17 Call Before You Dig
Wait The Required Time
'I Confirm Utility Response
Respect The Marks
[ Dig With Care
800.962-7962
www.digsafelyneviyork.com
IN THE SMPS, REPLACEMENT OF THE STONE AND/OR TOPSOIL MAY BE REQUIRED.
MOWING AND TRIMMING OF THE VEGETATED LAWN AREAS SHOULD BE PERFORMED AS NEEDED
THROUGHOUT THE SPRING, SUMMER AND FALL, TYPICALLY WEEKLY. ANY ERODED AREAS SHALL
BE IMMEDIATELY REPAIRED, RETOPSOILED, REVEGETATED AND COVERED WITH EROSION
CONTROL BLANKETS.
STANDARD SPECIFICATIONS FOR STABILIZED
CONSTRUCTION ACCESS
DEFINITION
A STABILIZED PAD OF AGGREGATE UNDERLAIN WITH GEOTEXTILE LOCATED
WHERE TRAFFIC WILL BE _ENTERING OR LEAVING A CONSTRUCTION SITE TO
AND FROM A PUBLIC STREET OR ROAD.
PURPOSE
TO REDUCE OR ELIMINATE THE TRACKING OF SEDIMENT ONTO PUBLIC RIGHTS
O Z Y. OF WA
w R APPLICATION
�
U) — AGGREGATE SIZE. USED A MATRIX OF 1-4 INCH STONE
i� — THICKNESS: NOT LESS THAN 6 INCHES
v C� — WIDTH: 12 FOOT MINIMUM, NOT LESS THAN FULL WIDTH OF POINTS WHERE
z INGRESS OR EGRESS OCCURS. 24 FOOT MINIMUM IF THERE IS ONLY ONE
ACCESS POINT TO THE SITE.
— LENGTH: NOT LESS THAN 50 FEET
— GEOTEXTILE: TO BE PLACED OVER THE ENTIRE AREA TO BE COVERED WITH
AGGREGATE. FILTER CLOTH NOT REQUIRED ON A SINGLE FAMILY
RESIDENCE LOT.
GEOTEXTILE MATERIAL CRITERIA
THE GEOTEXTILE SHALL BE WOVEN OR NONWOVEN FABRIC CONSISTING ONLY
OF CONTINUOUS CHAIN
POLYMERIC FILAMENTS OR YARNS OF POLYESTER. FABRIC SHALL BE INERT
TO COMMONLY ENCOUNTERED
CHEMICALS, HYDROCARBONS, MILDEW, ROT AND CONFORM TO THE FOLLOWING
PROPERTIES:
LIGHT DUTY ROADS HEAVY DUTY ROADS
GRAB TENSILE STRENGTH 200 LBS 220 LBS
ASTM D1682
ELONGATION AT FAILURE 50% 60%
c�
z ASTM D1682
�~ MULLEN BRUST STRENGTH 190 LBS 430 LBS
W
J ASTM D3786
PUNCTURE STRENGTH 40 LBS 125 LBS
ASTM D751 MODIFIED
EQUIVALENT OPENING SIZE 40-80 40-80
US STD SIEVE
AGGREGATE DEPTH 6 INCHES 10 INCHES
ACCEPTABLE MATERIAL: MIRAFI 10OX MIRAFI 60OX
MAINTENANCE
THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT
TRACKING OF SEDIMENT ONTO PUBLIC RIGHTS OF WAY OR STREETS. THIS
MAY REQUIRE PERIODIC TOP DRESSING WITH ADDITIONAL AGGREGATE, ALL
SEDIMENT SPILLED, DROPPED OR WASHED ONTO PUBLIC .R.O. W s MUST BE
REMOVED IMMEDIATELY. WHEN NECESSARY, WHEELS MUST BE CLEANED TO
REMOVE SEDIMENT PRIOR TO ENTRANCE ONTO PUBLIC R.O. W! s. WHEN
WASHING IS REQUIRED, IT SHALL BE DONE ON AN AREA STABILIZED WITH
AGGREGATE, WHICH DRAINS INTO AN APPROVED SEDIMENT TRAPPING DEVICE.
ALL SEDIMENT SHALL BE PREVENTED FROM ENTERING STORM DRAINS,
DITCHES OR WATERCOURSES.
SITE CONSTRUCTION SEQUENCING
• INSTALL SEDIMENT CONTROL FENCING AS SHOWN ON PLANS.
• ESTABLISH SUBGRADES FOR DRIVE.
• ESTABLISH SUBGRADES AROUND HOUSE AND HEAVY LAYER OF MULCH
OVER DISTURBED AREAS.
• CONSTRUCT HOUSE FOUNDATION.
• PERFORM SOIL RESTORATION OVER COMPACTED YARD AREAS, INSTALL
FINAL LANDSCAPING AROUND HOUSE, TOPSOIL, SEED AND MULCH YARD
AREAS.
• CONSTRUCT INFILTRATION FACILITIES, TOPSOIL, SEED AND INSTALL
EROSION CONTROL BLANKETS, INSTALL LAKESIDE PLANTINGS.
• RECONSTRUCT / REPAVE DRIVEWAY.
PLANTING NOTES
• PROTECT EXISTING TREES INDICATED TO REMAIN FROM SKINNING AND
FILLING AROUND BASE.
• THE CONTRACTOR SHALL INSTALL 4" TOPSOIL IN LAWN AREAS AND 9"
TOPSOIL IN PLANT BEDS AND ROUGH GRADE. THE CONTRACTOR WILL
PROVIDE FINE GRADING AND SOIL AMENDMENTS.
• AREAS INDICATED AS LAWN SHALL BE SEEDED WITH APPROVED MIX, AT A
RATE OF 5 LBS PER 1000 SF AND MULCHED WITH STRAW OR
HYDROSEEDED OR SODDED.
• PLANTING SOIL FOR BACKFILL OF NEW PLANTS AND PREPARATION OF
PLANT BEDS SHALL BE A MIXTURE OF 1 PART TOPSOIL, 1 PART
COMPOSTED MANURE 1 PART PEAT MOSS.
• MULCH FOR TREES AND SHRUBS SHALL BE COARSE SHREDDED BARK,
FREE OF WOOD CHIPS, LEAVES OR OTHER UNACCEPTABLE MATERIAL.
• MULCH FOR PERENNIALS SHALL BE FINE SHREDDED BARK, FREE OF WOOD
CHIPS, LEAVES OR OTHER UNACCEPTABLE MATERIAL.
MAJOR STORMWATER REQUIREMENTS
TOWN OF QUEENSBURY1 LAKE GEORGE PARK COMMISSION STORMWATER
CONTROL VOLUME REQUIREMENT FOR MAJOR PROJECTS
(15,000 SF+ OF TOTAL LAND DISTURBANCE):
- RUNOFF VOLUME REDUCTION FOR 10-YR DESIGN
STORM IN DEVELOPED VS. UNDEVELOPED, WOODED CONDITIONS
- RUNOFF RATE REDUCTION FOR 25-YR DESIGN
STORM IN DEVELOPED VS. UNDEVELOPED, WOODED CONDITIONS
A MAJOR STORMA TER PERMIT IS TO BE OBTAINED FROM THE TOWN OF
QUEENSBURY, PRIOR TO BEGINNING EARTHWORK.
A RIGHT-OF-WAY WORK PERMIT MUST BE OBTAINED FROM WARREN COUNTY
DPW I HIGHWAY DEPARTMENT FOR THE ENTRANCE DRIVEWAY.
EROSION CONTROL IMPLEMENTATION SCHEDULE
PRACTICE
IMPLEMENTATION TIME
DURATION OF PRACTICE
ENTIRE PROJECT (REMOVE AFTER FINAL j
SEDIMENT CONTROL FENCE
PRIOR TO CLEARING AND SOIL
SITE STABILIZATION AND VEGETATION
DISTURBANCE
ESTABLISHMENT)
STABILIZED CONSTRUCTION
DURING INITIAL SITE WORK
ENTIRE PROJECT (REMOVE DURING FINAL
ENTRANCE
MOBILIZATION
DRIVE RECONSTRUCTION)
TEMPORARY SEEDING & MULCHING
AFTER INITIAL SITE GRADING
I UNTIL FINAL GRADING AND VEGETATION
ESTABLISHMENT
I
STORMWATER DETENTION AREAS
DURING FINAL SITE GRADING
PERMANENT
SEEDING & OTHER VEGETATION
AFTER FINAL SITE GRADING
PERMANENT
STABILIZATION
CONSTRUCTION SPECIFICATIONS
• STONE SIZE — USE 1-4" STONE OR RECLAIMED OR
RECYCLED CONCRETE EQUIVALENT.
• LENGTH — NOT LESS THAN 50—FEET,
• THICKNESS — NOT LESS THAN 6—INCHES.
• WIDTH — 12—FOOT MINIMUM, 24—FOOT MINIMUM IF SINGLE
ENTRANCE TO SITE.
• GEOTEXTILE — WILL BE PLACED OVER THE ENTIRE AREA
PRIOR TO PLACING OF STONE.
• SURFACE WATER -- ALL SURFACE WATER FLOWING OR
DIVERTED TOWARD CONSTRUCTION ENTRANCES SHALL BE
PIPED BENEATH THE ENTRANCE. IF PIPING IS
IMPRACTICAL, A MOUNTABLE BERM WITH 1 V.- 5H SLOPES
WILL BE PERMITTED.
• MAINTENANCE — THE ENTRANCE SHALL BE MAINTAINED IN
A CONDITION WHICH WILL PREVENT TRACKING OR FLOWING
OF SEDIMENT ONTO PUBLIC RIGHTS —OF —WAY, ALL
SEDIMENT SPILLED, DROPPED, WASHED OR TRACTED ONTO
PUBLIC RIGHTS —OF —WA MUST BE REMOVED IMMEDIATELY
• WHEN WASHING IS REQUIRED, IT SHALL BE DONE ON AN
AREA STABILIZED WITH STONE AND WHICH DRAINS INTO
AN APPROVED SEDIMENT TRAPPING DEVICE.
• PERIODIC INSPECTION AND NEEDED MAINTENANCE SHALL
BE PROVIDED AFTER EACH RAIN EVENT
VEGETATION SEEDING SCHEDULE
RECOMMENDED
APPLICATION
AREA OF SEEDING
SPECIES/MIX
RATE
DETENTION AREA &
KENTUCKY BLUEGRASS,
75 LBS/ACRE
LAWN AREAS
CREEPING RED FESCUE,
TOTAL
PERENNIAL RYEGRASS
TEMPORARY SEEDING
ANNUAL & PERENNIAL
75 LBS/ACRE
FOR EROSION
RYEGRASS MIX
TOTAL
CONTROL
L—,e
10'— 0"
Ir 0. C. MAX. ir
z
0
N
FLOW
�n
PERSPECTIVE
36" FENCE POST DRIVEN
MINIMUM 16" INTO
GROUND
SILT STOP EMBED IN
GROUND 8" MIN.
SOIL BACKFILL
36" FENCE POST
SILT STOP EMBED IN
GROUND 8" MIN.
UNDISTURBED GROUND
SEDIMENT CONTROL FENCE DETAIL
NTS
CONSTRUCTION SPECIFICATIONS
• WOVEN WIRE FENCE TO BE FASTENED SECURELY TO FENCE POSTS WITH
WIRE TIES OR STAPLES. POST SHALL BE STEEL EITHER "T" OR "U"
TYPE OR HARDWOOD.
• FILTER CLOTH TO BE FASTENED SECURELY TO WOVEN WIRE FENCE WITH
TIES SPACED EVERY 24" AT TOP AND MID SECTION. FENCE SHALL BE
WOVEN WIRE, 6" MAX. MESH OPENING.
• WHEN TWO SECTIONS OF FILTER CLOTH ADJOIN EACH OTHER THEY
SHALL BE OVER —LAPPED BY 6—INCHES AND FOLDED. FILTER CLOTH
SHALL BE EITHER FILTER X, MIRAFI 10OX, STABILINKA T14ON OR
APPROVED EQUIVALENT.
• PREFABRICATED UNITS SHALL BE GEOFAB, ENVIROFENCE OR APPROVED
EQUIVALENT.
• MAINTENANCE SHALL BE PERFORMED AS NEEDED AND MATERIAL
REMOVED WHEN "BULGES" DEVELOP IN THE SILT FENCE.
SLOPE LENGTH/FENCE LENGTH (FT.)
SLOPE
STANDARD
REINFORCED
SUPER
<2%
30011500
N/A
N/A
2-10%
12511000
25012000
30012500
10-20%
1001750
150/1000
200/1000
20-33%
60/500
80/750
100/1000
33-50%
40/250
70/350
1001500
>50%
20/125
30/175
50/250
STANDARD SPECIFICATIONS FOR SILT FENCE
DEFINITION
A TEMPORARY BARRIER OF GEOTEXTILE FABRIC INSTALLED ON THE
CONTOUR ACROSS A SLOPE TO INTERCEPT SEDIMENT LADEN RUNOFF FROM
SMALL DRAINAGE AREAS OF DISTURBED SOILS.
PURPOSE
TO REDUCE RUNOFF VELOCITY & TO EFFECT DEPOSITION OF TRANSPORTED
SEDIMENT LOAD.
APPLI CA TION
— MAXIMUM ALLOWABLE SLOPE LENGTHS CONTRIBUTING RUNOFF TO THE
FENCE PLACED ON A SLOPE:
1:2 SLOPE (50%) 25—FT
1:3 SLOPE (337.) 50—FT
1:4 SLOPE (257.) 75—FT
1:5 SLOPE OR LESS 100—FT
— MAXIMUM DRAINAGE AREA FOR OVERLAND FLOW SHALL NOT EXCEED 1/4
ACRE PER 100—FEET OF FENCE WITH MAXIMUM PONDING DEPTH OF 1.5
FEET.
— EROSION WILL OCCUR AS SHEET EROSION.
— CONCENTRATED WATER FLOW SHALT_ NOT BE DIRECTED TO FENCE.
DESIGN CRITERIA
— ALL SILT FENCES SHALL BE PLACED AS CLOSE TO THE DISTURBED
AREAS AS POSSIBLE, WITH A MINIMUM OF 10—FEET FROM THE TOE OF A
SLOPE. THE AREA BEYOND THE FENCE MUST BE UNDISTURBED OR
STABILIZED.
— SENSITIVE AREAS TO BE PROTECTED BY SILT FENCE MAYBE NEED TO BE
REINFORCED BY USING HEAVY WIRE FENCING FOR ADDED SUPPORT,
— WHERE THE ENDS OF THE SILT FENCE COME TOGETHER, THE TWO ENDS
SHALL BE OVERLAPPED, ROLLED TOGETHER AND STAPLED TO PREVENT
SEDIMENT BYPASS AT THESE CONNECTIONS.
FABRIC MATERIAL CRITERIA
GRAB TENSILE STRENGTH 90 LBS ASTM D1682
ELONGATION AT FAILURE 50% ASTM D1682
STANDARD SPECIFICATIONS FOR MULCHING
DEFINITION
APPLYING COARSE PLANT RESIDUE OR CHIPS, OR OTHER SUITABLE MATERIALS, TO
COVER THE SOIL SURFACE.
PURPOSE
THE PRIMARY PURPOSE IS TO PROVIDE INITIAL EROSION CONTROL WHILE A SEEDING
OR SHRUB PLANTING IS ESTABLISHING. MULCH WILL CONSERVE MOISTURE AND
MODIFY THE SURFACE SOIL TEMPERATURE AND REDUCE FLUCTUATION OF BOTH.
MULCH WILL PREVENT SOIL SURFACE CRUSTING AND AID IN WEED CONTROL. MULCH
IS ALSO USED ALONE FOR TEMPORARY STABILIZATION IN NON —GROWING MONTHS.
CONDITIONS WHERE PRACTICE APPLIES
ON SOILS SUBJECT TO EROSION AND ON NEW SEEDINGS AND SHRUB PLANTINGS.
MULCH IS USEFUL ON SOILS WITH LOW INFILTRATION RATES BY RETARDING RUNOFF.
CRITERIA
SITE PREPARATION PRIOR TO MULCHING REQUIRES THE INSTALLATION OF NECESSARY
EROSION CONTROL OR WATER MANAGEMENT PRACTICES AND DRAINAGE SYSTEMS.
SLOPE, GRADE AND SMOOTH THE SITE TO FIT NEEDS OF SELECTED MULCH PRODUCTS.
REMOVE ALL UNDESIRABLE STONES AND OTHER DEBRIS TO MEET THE NEEDS OF THE
ANTICIPATED LAND USE AND MAINTENANCE REQUIRED.
APPLICATION RATES.
MULCH — 2 TON/ACRE (2 BALES / 1000 SFi)
Drawing Not To Scall
5401 St. Wendel - Cynthiana Rd. PH:800-772-2040
Poseyville, IN 47633 www.tensarnagreen.com
TAPER TO MEET EXISTING GRADE,
TOPSOIL, SEED & INSTALL
_EROSION CONTROL BLANKETS,
NORTH AMERICAN GREEN
S75BN OR EQUAL
3'W x 2'D COBBLE/ROCK—
FILLED CONVEYANCE TRENCH
TO BASINS PER PLAN
COMPACTED
SUBGRADE
2023582097
Pamela J. Vogel, Warren Co Clerk
NORTH AMERICAN GREEN S75BN
Disclaimer:
The information presented herein is general design information only. For specific applications,
consult an independent professional for further design guidance.
Drawn on: 3.16.11
EROSION CONTROL BLANKET DETAIL
NTS
OUTLET FROM DET AREA
E MIN. 6-8" RIP RAP EXTEND Ll
LEVEL
—7 1 \
ono
DETENTION BASIN OUTLET DETAIL'.
NTS
Instr # 2023-3000062
09/01/2023 08:50:19 AM
1 Pages
MAP
FILED
14' TOTAL DRIVE WIDTH -
3% CROSS SLOPE
PER GRADING PLAN
1
REMOVE EXISTING
ORGANICS & TOPSOIL
PRIOR TO PLACING GRAVEL
DRIVEWAY SECTION
N TS
1. Prepare soil before installing rolled
erosion control products (RECPs),
including any necessary
application, of lime, fertilizer, and
seed.
2. Begin at the top of the slope by
anchoring the RECPs in a
6"(15cm) deep X 6"(15cm) wide
trench with approximately 12"
(30cm) of RECPs extended beyond
the up -slope portion of the trench.
Anchor the RECPs with a row of
staples/stakes approximately 12"
(30cm) apart in the bottom of the
trench. Backfill and compact the
trench after stapling. Apply seed to
the compacted soil and fold the
remaining 12"(30cm) portion of
RECPs back over the seed and
compacted soil. Secure RECPs
over compacted soil with a row
of staples/stakes spaced
approximately 12"(30cm) apart
across the width of the RECPs.
3. Roll the RECPs (A) down or (B)
horizontally across the slope.
RECPs will unroll with appropriate
side against the soil surface. All
RECPs must be securely fastened
to soil surface by placing
staples/stakes in appropriate
locations as shown in the staple
pattern guide.
4. The edges of parallel RECPs must
be stapled with approximately 2" -
5" (5-12.5cm) overlap depending
on the RECPs type.
5. Consecutive RECPs spliced down
the slope must be end over end
(Shingle style) with an approximate
3"(7.5cm) overlap. Staple through
overlapped area, approximately
12"(30cm) apart across entire
RECPs width.
'NOTE:
In loose soil conditions, the use of
staple or stake lengths greater than
6"(15cm) may be necessary to
properly secure the RECPs.
GEOTEXTILE FABRIC TENCATE
MIRAFI 140N OR EQUIVALENT
BURY END 4" INTO SOIL
4" MIN 112 STONE_
GEOTEXTILE FABRIC TENCATE
MIRAFI 140N OR EQUIVALENT
3
1 MAX
ROADWAY — 12" TOTAL DEPTH. OF
NYS DOT SECT. 304. TYPE 2 OR 4
COMPACTED TO 95% STD. PROCTOR
TAX MAP # 265. -1-43
ALTERATION OF THIS DOCUMENT EXCEPT BY A LICENSED
PROFESSIONAL ENGINEER IS A VIOLATION OF NYS EDUCATION LAW.
WINTER STABILIZATION STANDARDS
STANDARD AND SPECIFICATIONS FOR
WINTER STABILIZATION
Definition & Scone
A temporary site specific, enhanced erosion and sediment
control plan to manage runoff and sediment at the site during
construction activities in the winter months to protect off -site
water resources.
Conditions Where Practice ADDlieS
This•standard applies to all construction activities involved
with ongoing land disturbance and exposure between
November 15"' to the following April 1"
Design Criteria
11. Prepare a snow management plan with adequate storage
for snow and control of melt water, requiring cleared
snow to be stored in a manner not affecting ongoing
construction activities.
2. Enlarge and stabilize access points to provide for snow
management and stockpiling. Snow management
activities must not destroy or degrade installed erosion
and sediment control practices.
3. A minimum 25 foot buffer shall be maintained from all
perimeter controls such as silt fence. Mark silt fence
with tall stakes that are visible above the snow pack.
4. Edges of disturbed areas that drain to a waterbody within
100 feet will have 2 rows of silt fence, 5 feet apart,
installed on the contour.
5. Drainage structures must be kept open and free of snow
and ice dams. All debris, ice dams, or debris from
plowing operations, that restrict the flow of runoff and
meltwater, shall be removed.
6. Sediment barriers must be installed at all appropriate
November 2016
3" MIN
12" MIN
NTS
Dig Safely.
NewYork
Call Before You Dig
Wait The Required Time
I] Confirm Utility Response
i Respect The Marks
Dig With Care
600-962.7962
www.digsafelynevvyork.com
perimeter and sensitive locations. Silt fence and other
practices requiring earth disturbance must be installed
before the ground freezes.
7. Soil stockpiles must be protected by the use of
established vegetation, anchored straw mulch, rolled
stabilization matting, or other durable covering. A
barrier must be installed at least 15 feet from the toe of
the stockpile to prevent soil migration and to capture
loose soil.
8. In areas where soil disturbance activity has temporarily
or permanently ceased, the application of soil
stabilization measures should be initiated by the end of
the next business day and completed -within three (3)
days. Rolled erosion control blankets must be used on
all slopes 3 horizontal to 1 vertical or steeper.
9. If straw mulch alone is used for temporary
stabilization, it shall be applied at double the standard
rate of 2 tons per acre, making the application rate 4
tons per acre. Other manufactured mulches should be
applied at double the manufacturer's recommended
rate.
10. To ensure adequate stabilization of disturbed soil in
advance of a melt event, areas of disturbed soil should
be stabilized at the end of each work day unless:
a. work will resume within 24 hours in the same area
and no precipitation is forecast or;
b. the work is in disturbed areas that collect and
retain runoff, such as open utility trenches,
foundation excavations, or water management
areas.
11. Use stone paths to stabilize access perimeters of
buildings under construction and areas where
construction vehicle traffic is anticipated. Stone paths
should be a minimum 10 feet in width but wider as
necessary to accommodate equipment.
Maintenance
The site shall be inspected frequently to ensure that the
erosion and sediment control plan is performing its winter
stabilization function. If the site will not have earth
disturbing activities ongoing during the "winter season", all
bare exposed soil must be stabilized by established
vegetation, straw or other acceptable mulch, matting, rock,
or other approved material such as rolled erosion control
products. Seeding of areas with mulch cover is preferred
but seeding alone is not acceptable for proper stabilization.
Compliance inspections must be performed and reports
filed properly in accordance with the SWPPP for all sites
under a winter shutdown.
Page 2.38 New York State Standards and Specifications
For Erosion and Sediment Control
2" BINDER COURSE ASPHALT
1-112" TOP COURSE ASPHALT
OR 3" SINGLE BINDER COURSE
GRANULAR SUBBASE COURSE
NYSDOT SECTION 304 TYPE 2
OR 4 COMPACTED TO 95%
STD. PROCTOR
SILT FENCE/HAYBALES OR OTHER
SUPPORTING HARDWARE
SILT FENCE "'
OR OTHER 1
SECTION -A
-SIDE SLOPES, IF EXCAVATED,
SHALL BE 2' HORIZONTAL
TO 1' VER TI CAL
�81 x 8'W x 2'D CONCRETE WASHOUT
f AREA WITH IMPERMEABLE LINER
`—SIGN IDENTIFYING SITE AS
CONCRETE WASHOUT AREA
PLAN
CONCRETE TRUCK WASHOUT DETAIL
NTS
STANDARD SPECIFICATIONS
FOR CONCRETE TRUCK WASHOUT
DEFINITION & SCOPE
A TEMPORARY EXCAVATED OR ABOVE GROUND
LINED CONSTRUCTED PIT WHERE CONCRETE
TRUCK MIXERS AND EQUIPMENT CAN BE
WASHED AFTER THEIR LOADS HAVE BEEN
DISCHARGED.
PURPOSE
TO PREVENT HIGHLY ALKALINE RUNOFF FROM
ENTERING STORM DRAINAGE SYSTEMS OR
LEACHING INTO SOIL.
CONDITION WHERE PRACTICE APPLIES
WASHOUT FACILITIES SHALL BE PROVIDED FOR
EVERY PROJECT WHERE CONCRETE WILL BE
POURED OR OTHERWISE FORMED ON THE SITE.
THIS FACILITY WILL RECEIVE HIGHLY ALKALINE
WASH WATER FROM THE CLEANING OF CHUTES,
MIXERS, HOPPERS, VIBRATORS, PLACING
EQUIPMENT, TROWELS, AND SCREEDS. UNDER
NO CIRCUMSTANCES WILL WASH WATER FROM
THESE OPERATIONS BE ALLOWED TO INFILTRATE
INTO THE SOIL OR ENTER SURFACE WATERS.
DESIGN CRITERIA
CAPACITY THE WASHOUT FACILITY SHOULD BE
SIZED TO CONTAIN SOLIDS, WASH WATER, AND
RAINFALL AND SIZED TO ALLOW FOR THE
EVAPORATION OF WASH WATER AND RAINFALL.
WASH WATER SHALL BE ESTIMATED AT 7
GALLONS PER CHUTE AND 50 GALLONS PER
HOPPER OF THE CONCRETE PUMP TRUCK
AND/OR DISCHARGING DRUM. THE MINIMUM SIZE
SHALL BE 8 FEET BY 8 FEET AT THE BOTTOM
AND 2 FEET DEEP. IF EXCAVATED, THE SIDE
SLOPES SHALL BE 2 HORIZONTAL TO 1
VERTI CAL.
LOCATION• LOCATE THE FACILITY A MINIMUM OF
100 FEET AWAY FROM DRAINAGE SWALES,
STORM DRAIN INLETS, WETLANDS, STREAMS AND
OTHER SURFACE WATERS. PREVENT SURFACE
WATER FROM ENTERING THE STRUCTURE
EXCEPT FOR THE ACCESS ROAD.
PROVIDE APPROPRIATE ACCESS WITH A GRAVEL
ACCESS ROAD SLOPED DOWN TO THE STRUCTURE,
SIGNS SHALL BE PLACED TO DIRECT DRIVERS TO
THE FACILITY AFTER THEIR LOAD IS DISCHARGED.
LINER: ALL WASHOUT FACILITIES WILL BE LINED TO
PREVENT LEACHING OF LIQUIDS INTO THE GROUND.
THE LINER SHALL BE PLASTIC SHEETING WITH A
MINIMUM THICKNESS OF 10 MILS WITH NO HOLES
OR TEARS, AND ANCHORED BEYOND THE TOP OF
THE PIT WITH AN EARTHEN BERM, SAND BAGS,
STONE, OR OTHER STRUCTURAL APPURTENANCE
EXCEPT AT THE ACCESS POINT.
IF PRE —FABRICATED WASHOUTS ARE USED THEY
MUST ENSURE THE CAPTURE AND CONTAINMENT
OF THE CONCRETE WASH AND BE SIZED BASED
ON THE EXPECTED FREQUENCY OF CONCRETE
POURS. .THEY SHALL BE SITED AS NOTED IN THE
LOCATED CRITERIA.
MAINTENANCE
• ALL CONCRETE WASHOUT FACILITIES SHALL BE
INSPECTED DAILY. DAMAGED OR LEAKING
FACILITIES SHALL BE DEACTIVATED AND
REPAIRED OR REPLACED IMMEDIATELY. EXCESS
RAINWATER THAT HAS ACCUMULATED OVER
HARDENED CONCRETE SHOULD BE PUMPED TO
A STABILIZED AREA, SUCH AS A GRASS FILTER
STRIP.
• ACCUMULATED HARDENED MATERIAL SHALL BE
REMOVED WHEN 75% OF THE STORAGE
CAPACITY OF THE STRUCTURE IS FILLED. ANY
EXCESS WASH WATER SHALL BE PUMPED INTO
A CONTAINMENT VESSEL AND PROPERLY
DISPOSED OF OFF SITE,
• DISPOSE OF THE HARDENED MATERIAL
OFF —SITE IN A CONSTRUCTION/DEMOLITION
LANDFILL. ON —SITE DISPOSAL MAY BE ALLOWED
IF THIS HAS BEEN APPROVED AND ACCEPTED
AS PART OF THE PROJECTS SWPPP. IN THAT
CASE, THE MATERIAL SHOULD BE RECYCLED AS
SPECIFIED, OR BURIED AND COVERED WITH A
MINIMUM OF 2 FEET OF CLEAN COMPACTED
EARTHFILL THAT IS PERMANENTLY STABILIZED
TO PREVENT EROSION.
• THE PLASTIC LINER SHALL BE REPLACED WITH
EACH CLEANING OF THE WASHOUT FACILITY.
• INSPECT THE PROJECT SITE FREQUENTLY TO
ENSURE THAT NO CONCRETE DISCHARGES ARE
TAKING PLACE IN NON —DESIGNATED AREAS.
TOP OF BERM
TO BE LEVEL
ROCK OUTLET
WEIR PER PLAN
TOPSOIL
4" MIN.
WELL DRAINED
GRANULAR FILL
NATI VE
SOILS
2023582097
Pamela J. Vogel, Warren Co Clerk
BERM PER
PLAN
1 \,vx12"MIN.
COLD WEATHER INFILTRATION
TRENCH PER PLAN
—SEED & INSTALL EROSION
CONTROL BLANKETS
PER PLAN
GRADING
BERNIED VEGETATED DETENTION BASIN DETAIL
N TS
Instr # 2023-3000062
09/01/2023 08:50:19 AM
1 Pages
MAP
FILED
INSTALL RIP RAP ON SIDES
AND TOP OF CULVERT END
FLARED END SECTION WITH
BOLTED COUPLING BAND
FINISHED GRADE
CULVERT PIPE
BURY END 6" INTO SOIL
4" MIN. #2 STONE
GEOTEXTILE FABRIC;
TENCATE MIRAFI 14ON
CULVERT END SECTION DETAIL
NTS
PLANT AND MULCH
SURROUNDING YARD
AREAS
4' TRENCH WIDTH 'A
INFILTRATION TRENCH DETAIL
N TS
6" PVC SDR-35 STAND PIPE,
INSTALLED TO 6" ABOVE GRADE
W/CAP W/(3) 3/4" HOLES
FILTER FABRIC MIRAFI
140N OR EQUAL
INFILTRATION TRENCH FILLED
WITH 1"-3"
CRUSHED STONE
TAX MAP # 265. -1-43
ALTERATION OF THIS DOCUMENT EXCEPT BY A LICENSED
PROFESSIONAL ENGINEER IS A VIOLATION OF NYS EDUCATION LAW.
PLAT D 53
9 SHEETS
WAKEN COUNTY
REAL PROPERTY TAX SERVICES AGENCY
County Municipal Center
1340 State Route 9
Lake George, New York 12845
Tel.518-761-6464
Fax 518-761-6559
LEXIE A. DELUREY
Director
KRISTEN MAC EWAN
Deputy Director
CERTIFICATION OF COUNTY DIRECTOR OF REAL PROPERTY TAX SERVICES
THAT FEE AUTHORIZED BY REAL PROPERTY TAX LAW SECTION 503 SUBD. 7,
HAS BEEN PAID
The Warren County Board of Supervisors enacted Resolution No. 477 on October 17, 2014
authorizing fees set forth in Real Property Tax Law Section 503 Subd. 7. I have reviewed the
attached document and collected the fee as set forth below:
[ ] No fee, document does not require a change to the tax map
v
-
[ ] No fee, property survey only, not a subdivision
One through three lot subdivision .map Original
$25
[ ] One through three lot subdivision map Alteration
$25
[ ] One through three lot subdivision map Abandonment
$25
0
[ ] One through three lot Condominium
$25
[ ] Four through nine lot subdivision map Original
$50
i
[ ] Four through nine lot subdivision map Alteration
$50
M
9
[ ] Four through nine lot subdivision map Abandonment
$50
m
-0 0
[ ] Four through nine lot Condominium
$50
N o
W W
[ J Ten or more lot subdivision map Original
$100
o w
6 co o
[) Ten or more lot subdivision map Alteration
$100
N
[ ] Ten or more lot subdivision map Abandonment
$100
>
f 1 Ten or more lot Condominium
$100
Map reference is as follows: a ('5.00 — I
NAME OR TITLE S&F/-444 '04-L-LA� j(NO � SAe1K LOCKNm-?4�VEVSIONDATE a9 ac t
DATE S/oZ(D 0 -1 o` TOWN/CITY i'sISQ,V (9-1
This certificate only approves the document with respect to compliance with Real Property Tax Law 503 Subd. 7. No other
approval as to completeness, legality, compliance with any local or state statues or regulations or any other approval or
requirements for processing by this department, shall be deemed satisfied by this certificate.
c�LS c) -L 3 Z/�
Date Lexie A Delurey
Real Property Director
or Designee