Loading...
IM Inspection Worksheet_06-10-2023_10-37-33INSPECTION WORKSHEET (FRM-028156-2023) CC-0552-2023Case Number:Case Module:Permit Management ScheduledInspection Status:Inspection Date: Building FramingInspection Type:Inspector:Mark Smith Job Address:Parcel Number:1424 State Rte 9 Lake George, NY 12845 288.16-1-1 Company Name NameContact Type Applicant State Permits, Inc. Architect Cortland Morgan Architect Contractor GFP Specialties Granted Permission Lake George Northway LLC Primary Owner Lake George Northway LLC Checklist Item CommentsPassed Building Inspector Notes False Insulation under bow & bay window(s)False Air Seal all Plates and Sills False Joist hangers False Exterior wall outlets sealed False 20 in. (W)False Draft stopping 1,000 sq. ft. floor trusses False 5.0 sf grade False Design Professional Sign-off, if required False 24 in. (H)False Air Seal All Registers at Floor False <4:12 pitch double layer of ice/snow underlayment False Anchor Bolts 6 ft. or less on center False Ice and water shield 24 inches from wall False Bath fans connected to exterior vent False 12 O.C.False Air Sealing all Joints Before Insulation False Notches Holes Bearing Walls False 5.7 sf above below grade False >1000 s.f. then firestop must be installed False Truss Specification Provided False Windows Habitable Space Bedrooms False Metal Strapping for Notches Top Plate False Bracing Bridging False Garage portal framing False Deck (post beam connections hex head bolts)False Jack Studs Headers False Jack Posts Main Beams False Attic Access 22 x 30 minimum False October 06, 2023 Page 1 of 2 INSPECTION WORKSHEET (FRM-028156-2023) Checklist Item CommentsPassed Soffits-Insulation Baffel False Exterior sheeting nailed properly False Hurricane Clips/Uplift Screws/Nail Holes Filled False Permit Card Visible From Road False Framing False Headroom 6 ft. 8 in.False October 06, 2023 Page 2 of 2