Loading...
IM Inspection Worksheet_05-10-2023_14-20-41INSPECTION WORKSHEET (ASFINAL-028101-2023) AST-0521-2022Case Number:Case Module:Permit Management 10/05/2023 PassedInspection Status:Inspection Date: Accessory Structure FinalInspection Type:Inspector:Charles Dyer Job Address:Parcel Number:14 Highview Rd Lake George, NY 12845 239.15-1-15 Company Name NameContact Type Applicant Redbud Development Inc Geff Redick Contractor Redbud Development Inc Geff Redick Engineer Saratoga Engineering & Design Granted Permission JACK LYNCH Primary Owner JACK LYNCH Alice Lynch Checklist Item CommentsPassed Building Inspector Notes True Please contact building department to set up for final inspection and or renew permit. 9/11/23 / deck and opened porch completed 10/5/23 Site Plan / Variance required False Wood deck: 2'+ from grade dia bracing required True Fin Elect; Energy Saving Light Bulbs 90 Percent True Guard at deck, porches 36" or more True 4+ Deck Joist Ledger Connections-24" From Ends True Deck (post beam connections hex head bolts)True Okay To Issue CC True Handrail 4 or more risers True Deck Ledger-Bolted per Code True October 05, 2023 Page 1 of 1