Loading...
IM Inspection Worksheet_05-10-2023_08-40-58INSPECTION WORKSHEET (SEP-028143-2023) SEP-0598-2023Case Number:Case Module:Permit Management 10/05/2023 PassedInspection Status:Inspection Date: SepticInspection Type:Inspector:Mark Smith Job Address:Parcel Number:18 Moorwood Dr Queensbury, NY 12804 295.15-1-46 Company Name NameContact Type Applicant Nick Daigle Contractor Nick Daigle Granted Permission Nick Daigle Primary Owner Martin Shaffer Checklist Item CommentsPassed Building Inspector Notes True 9/28/23 partial approval for septic system. - a new 1250 gallon septic tank with 200' of pipe and stone was installed. - provide as built drawing for final approval. 10/5/23 final inspection for septic alterations approved. as built drawing received. Soil Type: Sand True Size of Stone True # 2 Roof gutters don't discharge over leach field True Waterline separation distance True Building to Tank True 4" sch 40 Tank to Distribution Box True 4" SDR 35 Opening Sealed:True End Cap True Absorbtion Fields: Total Length True 4 laterals @ 50' each 200' total Foundation to Tank True 11' Engineer Report and As-Built True provide as built drawing. 10/5/23 final inspection for septic alterations approved. as built drawing received. Location of system on property True back yard Type of Water: Municipal / Well Water True municipal water supply Locations / Separations True Depth of Trenches True 16/18" Length of Each Trench True 4 laterals @ 50' each 200' total System Use Status True system approved for use Conforms as per Plot Plan True Size of tank True 1250 gallon septic tank Distribution box to Field / Pit True 4" SDR 35 perforated Foundation to Absorption True 21" InletOutlet Pipes & Baffles True October 05, 2023 Page 1 of 1