Loading...
IM Inspection Worksheet_04-10-2023_08-21-13INSPECTION WORKSHEET (COMFIN-028103-2023) CC-0503-2022Case Number:Case Module:Permit Management 10/04/2023 Partial PassInspection Status:Inspection Date: Commercial Final InspectionInspection Type:Inspector:Mark Smith Job Address:Parcel Number:37 Homer Ave Queensbury, NY 12804 302.8-2-5 Company Name NameContact Type Architect Andrew Parsons Contractor Brownell Electric Granted Permission Northway Christian Church Pastor John Tether Primary Owner Northway Christian Church Pastor John Tether Checklist Item CommentsPassed Building Inspector Notes False 9/12/23 final commercial inspection not approved, please address the items listed below and call for recheck when ready - install returns at hand rails as discussed on site. - provide a letter of substantial completion from design architect. - provide electronic as built drawings. 9/26/23 partial approval for final commercial inspection. - Provide a letter of substantial completion from design architect - provide electronic as built drawings. 10/4/23partial approval for final commercial inspection letter of substantial completion received. * submit electronic asbuilt drawings for final approval * Handicap parking striping True Engineer or Architect Approval True 10/4/23 received Ramps: 6" or more need handrails True OK to Issue C/O True Universal Symbol of Access displayed True Electronic as-builts False Exits At Grade Or Platform 36 (w) x 44 (l)True Ramps: 4" toe kick each side of ramp True Ext Finish /Grade Complete/6 in 10ft or Equivalent True Doors 36 inch wLever Hand Panic Hardware, if req True October 04, 2023 Page 1 of 1