Loading...
IM Inspection Worksheet_13-10-2023_15-06-09INSPECTION WORKSHEET (SEP-028311-2023) RC-0610-2022Case Number:Case Module:Permit Management 10/13/2023 PassedInspection Status:Inspection Date: SepticInspection Type:Inspector:Charles Dyer Job Address:Parcel Number:308 Cleverdale Rd Queensbury, NY 12804 226.12-1-82 Company Name NameContact Type Applicant David Brownell Architect Curtis Dybas Contractor DB Carpentry Granted Permission Jean Tarrant Primary Owner Jean Tarrant Robert Tarrant Checklist Item CommentsPassed Building Inspector Notes True This system has been inspected after installation from Chris Crandal, asbuilt has been received, inspection was done under the variance. Pump chamber verified / floats / alarm and final electrical all verified. CMD 10/5/23 Soil Type: Sand True ETU Maintenance Contract provided True Please provide maintenance contract / received 10/13/23 Final Electrical True Waterline separation distance True Building to Tank True 4" SCHD 40 [Provide extension collar if Yes]True Tank to Distribution Box True 2" SDR 26 force main to 4" SDR 35 Opening Sealed:True 90% alarm level activates True End Cap True Absorbtion Fields: Total Length True see asbuilt Foundation to Tank True Engineer Report and As-Built True received engineer asbuilt / inspection report was performed under variance permit # 9/7/23 sent to T Hutchins. Location of system on property True See asbuilt Inlet & Outlet manholes 12"+ below grade True Type of Water: Municipal / Well Water True lake Locations / Separations True See asbuilt Depth of Trenches True Eljen Matts Length of Each Trench True see asbuilt System Use Status True Conforms as per Plot Plan True Size of tank True FUJI-Clean CE-5 ETU Distribution box to Field / Pit True 4" SDR 35 Foundation to Absorption True InletOutlet Pipes & Baffles True October 13, 2023 Page 1 of 2 INSPECTION WORKSHEET (SEP-028311-2023) Checklist Item CommentsPassed 50% alarm level activates True October 13, 2023 Page 2 of 2