Loading...
IM Inspection Worksheet_13-10-2023_15-28-25INSPECTION WORKSHEET (SEP-028203-2023) SEP-0632-2023Case Number:Case Module:Permit Management 10/13/2023 Partial PassInspection Status:Inspection Date: SepticInspection Type:Inspector:Charles Dyer Job Address:Parcel Number:95 Mason Rd Queensbury, NY 12804 226.12-1-27 Company Name NameContact Type Applicant Morning Star Excavation & Septic Contractor Morning Star Excavation & Septic Engineer Kevin Hastings Granted Permission Morning Star Excavation & Septic Primary Owner Janet Stasio Checklist Item CommentsPassed Building Inspector Notes False Soil Type: Sand True Eljen matts atop washed sand ETU Maintenance Contract provided False Size of Stone False N/A Final Electrical False N/A Waterline separation distance True Building to Tank True 2" force main SCHD 40 [Provide extension collar if Yes]False Tank to Distribution Box True 4" SDR 35 Opening Sealed:True 90% alarm level activates False End Cap True Absorbtion Fields: Total Length True 80 ft Foundation to Tank True 43+ft Engineer Report and As-Built False engineer onsite, to provide engineer asbuilt report Location of system on property True see asbuilt Inlet & Outlet manholes 12"+ below grade False Type of Water: Municipal / Well Water False lake George Locations / Separations True Length of Each Trench True Eljen B43 GSF modules lines @ 40 ft=80ft System Use Status True Conforms as per Plot Plan True Distribution box to Field / Pit True 4" SDR 35 perforated Foundation to Absorption True 30ft InletOutlet Pipes & Baffles True outlet is of effulent filter 50% alarm level activates False October 13, 2023 Page 1 of 1