Loading...
IM Inspection Worksheet_13-10-2023_11-30-14INSPECTION WORKSHEET (BINS-028287-2023) CC-0699-2019Case Number:Case Module:Permit Management 10/13/2023 Partial PassInspection Status:Inspection Date: Building InsulationInspection Type:Inspector:Mark Smith Job Address:Parcel Number:1256-1264 West Mountain Rd Queensbury, NY 12804 288.-1-64 Company Name NameContact Type Applicant Schermerhorn Comm. Holdings LP Architect Rucinski-Hall Architecture Contractor Schermerhorn Comm. Holdings LP Granted Permission Schermerhorn Comm. Holdings LP Primary Owner WESTBROOK SENIOR RESIDENCES Checklist Item CommentsPassed Zip exterior sheathing, nailing & taping True October 13, 2023 Page 1 of 3 INSPECTION WORKSHEET (BINS-028287-2023) Checklist Item CommentsPassed Building Inspector Notes False 1/9/23 partial approval for insulation - R 19 sound insulation verified at the tub enclosure for each unit. 2/21/23 partial approval for insulation - proper vent in apartment room only verified. - insulation at box beam first and second floors apartment room only approved R 25 - R 38 insulation At elevator shaft lid and 4' down the walls verified. 3/9/23 partial approval for insulation - insulation approved at the areas listed below, ok to cover these areas with Sheetrock so mechanical work can be installed - third floor ceilings at north and south walls 48" from top plate, R 38 - third floor walls, north and south wall approximately 12" down from top plate, R 21 - first and second floors, ceilings 48" from top plate at north and south walls R 19 sound insulation. - first and second floor north and south exterior walls only approximately 12" down from top plate, R 21 4/3/23 partial approval for insulation - sound insulation at first and second floor corridor ceilings verified, R 21. 4/5/23 Building Insulation Partial Approval - Corridor Ceiling Sound Board 1st and 2nd floor approved. 4/19/23 partial approval for insulation R 30 insulation at cantilevered framing parking lot side of building verified, ok to install sheathing. 5/26/23 partial approval for insulation - insulation at electrical room walls first floor verified, ok to sheet rock this room only. 6/8/23 partial approval for insulation -sound insulation at electrical room ceiling, entrance foyer ceiling, and mail room ceiling verified, ok to install sound board and sheet rock these areas only. 6/20/23 partial approval for insulation - thermal insulation at mechanical rooms west end of building first and second floor verified. -thermal insulation at community room exterior wall verified 10/13/23 partial approval for insulation - thermal & sound insulation approved at the third floor only. U Factors = .3 cfm for windows, .5 cfm for doors False .28 Exterior wall outlets sealed True All Return Air Hard Duct Work False Duct work sealed properly / No duct tape True Duct Testing Outside Conditioned Space False Door / Window Sealed (No Insulation)True Air Seal Outside Penetrations True All Ductwork Sealed Return and Supply True Blower Door Test False October 13, 2023 Page 2 of 3 INSPECTION WORKSHEET (BINS-028287-2023) Checklist Item CommentsPassed Duct Insulation - if required in unheated spaces False Combustion Air Supply for Furnace False Fresh air supply 3' from grade True Window Sealing True Duct Blaster Test for duct work, R-8, unhtd spaces False Permit Card Visible From Road True Proper Vent, Attic Vent True Insulation ResCheck ComCheck True 4/5/23 Building Insulation Partial Approval - Corridor Ceiling Sound Board 1st and 2nd floor approved. 4/19/23 partial approval for insulation R 30 insulation at cantilevered framing parking lot side of building verified, ok to install sheathing. October 13, 2023 Page 3 of 3