Stamped Final Inspection Memo 23_10-06
27r.2MM =I., 0 t1j!;ftTIW Mr, 7rSqTI'I?&TR9#TIW TEL. (518) 793-7444 FAX (518) 793-7061 E-MAIL hjh@hjhllc.com To: Nate Merrill From: Dan De Nero CC: Date: 10/06123 Re: BD Glens Falls; Building 4 Handicap Ramp Final Inspection M On October 5, 2023, 1 completed a final inspection of the construction for the Building 4 handicap ramp. The construction was complete except for touch-up finish painting being completed at the time of the visit. An additional inspection had been conducted mid -summer to inspect the foundation and rebar for the foundation walls. All construction work was completed as per the plans and specifications develop by Haan.© Engineering. - A - 9- W . 4grafludIM-42ps MIZIZIA1216