Loading...
IM Inspection Worksheet_17-10-2023_12-06-46INSPECTION WORKSHEET (FDTN-028361-2023) RC-0614-2023Case Number:Case Module:Permit Management 10/17/2023 Partial PassInspection Status:Inspection Date: Building FoundationInspection Type:Inspector:Charles Dyer Job Address:Parcel Number:113 Rockhurst Rd Queensbury, NY 12804 227.9-1-7 Company Name NameContact Type Applicant JOHN DICKINSON Engineer Hutchins Engineering Granted Permission LORRAINE DICKINSON TRUST Primary Owner LORRAINE DICKINSON TRUST Checklist Item CommentsPassed Building Inspector Notes False Footing Drain Stone - 12 inch width False PVC/Cast/Copper/Pex tubing False Pressure Test False Foundation / Wallpour False 5 psi or 10 ft. above highest conn. for 15 minutes False Masonry Wall False Air or head test False Footing Drain Stone - 6 inches above footing False Foundation Dampproofing False Plumbing Under Slab False Foundation Waterproofing False Footing Drain Daylight or Sump False Monolithic Slab True Footings False Footing Drain stone - 6 mil poly False Piers False Backfill Approval False Rough Grade 6 inch drop within 10 ft.False Foundation Insulation Interior / Exterior False Reinforcement in Place False Reinforcement in Place True Permit Card Visible From Road False A permit has not been issued for this project at this time, basically building inspector visit to verify size of slab / pluming under slab. Reuben Ellsworth on site at time of visit.10/17/23 Poly Under Slab False Footing Dowels or Keyway in place False October 17, 2023 Page 1 of 1