IM Inspection Worksheet_19-10-2023_13-55-25.pdf Illl 111 IIII llllllll llllll4l IIIIIIIIIIIIIII IIIIIII llllllllllllllllllll 111111111 Illl IIII IIIII lull Illl llllllll���1�1 ll`1�111111111 IIII IIIII IIIIIIUUUIII IIIIIIIIIIIIIII lllllllllllll4l IU llllllll lllllllllllllll II1111l1I1U IIII IIII �1l 1111 l�l IIII IIII Illl 1�l II l lu ll UI IIIII l llll� � l 111 I l 111 I U llllllll lllllllllll llllllll I III I u �
i i i. moo moo moo moo u uuuuu �� �� �� uuuuu uuuuu uuuuu G� G u G� l�mo
� ������IIIIII���� II� ��� �IIIIIII��I ������IIIIII�� ���������I� �IIIIII�� �������� IIIIIIIII� IIIII �� IIIIIII lluu�llll�lllllll�� lllllll��llll�� �lllll �llll��lllll� ���lllll� ��lllll�iiu�llllllllllllllllllllllllllllllllll����������������������������������������
Case Number: SEP-0592-2023 Case Module: Permit Management
Inspection Date: 10/11/2023 Inspection Status: Partial Pass
Inspector: Mark Smith Inspection Type: Septic
Job Address: 20 Mayflower Ln Parcel Number: 227.6-1-6
Kattskill Bay, NY 12844
Contact Type Company Name Name
Applicant Morning Star Excavation &Septic
Contractor Morning Star Excavation &Septic
Engineer Kevin Hastings
Granted Permission Morning Star Excavation &Septic
Primary Owner Kimberly Pfeiffenberger
Checklist Item Passed Comments
Building Inspector Notes False 10/11/23 partial approval for replacement septic system.
-a new 1000 gallon septic tank with filter at outlet baffle and 64'of
eljen absorbtion trenches.
submit certified as built for final approval.
Roof gutters don't discharge over leach field True
Waterline separation distance True
Building to Tank True existing
[Provide extension collar if Yes] True
Tank to Distribution Box True 4"sdr 35
Opening Sealed True
End Cap True ends are looped with a vent
Absorbtion Fields: Total Length True to 32' absorption trenches of eljen mats.
Foundation to Tank True 19.5'
Engineer Report and As-Built False provide certified as built drawing
Inlet&Outlet manholes 12"+ below grade True
Type of Water: Municipal/Well Water True lake water supply
Locations/Separations True
Depth of Trenches True 30/36"
Length of Each Trench True to 32' absorption trenches of eljen mats.
System Use Status True system approved for use
Conforms as per Plot Plan True
Size of tank True 1000 gallon
Distribution box to Field/Pit True 4"sdr 35 to eljen mats
Foundation to Absorption True 20'
InletOutlet Pipes& Baffles True filter at outlet baffle
Soil Type: Loam True
October 19,2023 Page 1 of 1