Lake George Outlets Column Repair.General Observation.2023-10-03.Rpt.0001GENERAL OBSERVATION REPORT
Report Number:JB231160.0001
Service Date:10/03/23 30 Corporate Cir Ste 201
Report Date:10/04/23 Albany, NY 12203-5169
Task:Site visit for inspection and testing services 518-266-0310
Client Project
BBL Construction Services Lake George Outlets Column Repair
Attn: John Crupi 1468 US Route 9
302 Washington Avenue Ext Queensbury, NY 12804
Albany, NY 12203-7306
Project Number: JB231160
Services:
Terracon Consultants - NY, Inc. Rep.: J. Canonico
Reported To:Brian Decker of BBL
Contractor:BBLC
Report Distribution:
(1) BBL Construction Services, John
Crupi
Reviewed By:____________________________________
M. McHenry
Materials Department Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above
and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at
the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
DM010, 04-29-22 Rev.3 Page 1 of 1
General Information
Jake of BBL requested Terracon to be on site for observed parking garage column repairs at j-10 at the above referenced project. Observed work
was being performed by BBLC. The results of observations for today were reported to Brian Decker of BBL.
The construction documents referenced for this inspection include: S001, S102, 8/15/23.
Summary of Services
Observed contractor drill & epoxy repair reinforcement at referenced column.
Additional Comments
Contractor wrapped the entire lower/below grade pier with ties epoxied into the pier on 4 sides. See photo #8. Drawing shows less
reinforcement; in place/as-built pier reinforcement was more substantial than design. Contractor reported RDP would likely issue an email or
sketch pertaining to as-built condition.
Compliance Statement
Based on our observations, construction activities at the above referenced locations appeared to be completed in general accordance with the
project plans and specifications.
Photo Log
Report Number:JB231160.0001
Service Date:10/03/23 30 Corporate Cir Ste 201
Report Date:10/04/23 Albany, NY 12203-5169
Task:Site visit for inspection and testing services 518-266-0310
BBL Construction Services
Attn: John Crupi
CT0001, 10-16-13, Rev.10 Page 1 of 5
(P1) (J-10) 2nd column from East labeled C4; this work done before site visit. Cleaned rust and applied rust-oleum rust
reformer product. Contractor provided photo.
(P2) Applied Rust-Oleum after cleaning; North elevation
Photo Log
Report Number:JB231160.0001
Service Date:10/03/23 30 Corporate Cir Ste 201
Report Date:10/04/23 Albany, NY 12203-5169
Task:Site visit for inspection and testing services 518-266-0310
BBL Construction Services
Attn: John Crupi
CT0001, 10-16-13, Rev.10 Page 2 of 5
(P4) South elevation
(P3) Looking South; wide angle photo for location purpose
Photo Log
Report Number:JB231160.0001
Service Date:10/03/23 30 Corporate Cir Ste 201
Report Date:10/04/23 Albany, NY 12203-5169
Task:Site visit for inspection and testing services 518-266-0310
BBL Construction Services
Attn: John Crupi
CT0001, 10-16-13, Rev.10 Page 3 of 5
(P4) Hilti HIT-RE 500 epoxy
(P5) 7/8” vacuum bit for the #6 vertical bars
Photo Log
Report Number:JB231160.0001
Service Date:10/03/23 30 Corporate Cir Ste 201
Report Date:10/04/23 Albany, NY 12203-5169
Task:Site visit for inspection and testing services 518-266-0310
BBL Construction Services
Attn: John Crupi
CT0001, 10-16-13, Rev.10 Page 4 of 5
(P6) S102 drawing
(P7) Bonding agent batched May 5th 2023, good for one year
Photo Log
Report Number:JB231160.0001
Service Date:10/03/23 30 Corporate Cir Ste 201
Report Date:10/04/23 Albany, NY 12203-5169
Task:Site visit for inspection and testing services 518-266-0310
BBL Construction Services
Attn: John Crupi
CT0001, 10-16-13, Rev.10 Page 5 of 5
(P8) Looking NW at added pier reinforcement. Ties drilled/epoxied at all 4 sides. Contractor used Hilti HIT 200 at South
elevation ties; note color difference. (4) Long vertical #6 bars not yet installed at corners.