Lake George Outlets Column Repair.General Observation.2023-10-03.Rpt.0001GENERAL OBSERVATION REPORT Report Number:JB231160.0001 Service Date:10/03/23 30 Corporate Cir Ste 201 Report Date:10/04/23 Albany, NY 12203-5169 Task:Site visit for inspection and testing services 518-266-0310 Client Project BBL Construction Services Lake George Outlets Column Repair Attn: John Crupi 1468 US Route 9 302 Washington Avenue Ext Queensbury, NY 12804 Albany, NY 12203-7306 Project Number: JB231160 Services: Terracon Consultants - NY, Inc. Rep.: J. Canonico Reported To:Brian Decker of BBL Contractor:BBLC Report Distribution: (1) BBL Construction Services, John Crupi Reviewed By:____________________________________ M. McHenry Materials Department Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. DM010, 04-29-22 Rev.3 Page 1 of 1 General Information Jake of BBL requested Terracon to be on site for observed parking garage column repairs at j-10 at the above referenced project. Observed work was being performed by BBLC. The results of observations for today were reported to Brian Decker of BBL. The construction documents referenced for this inspection include: S001, S102, 8/15/23. Summary of Services Observed contractor drill & epoxy repair reinforcement at referenced column. Additional Comments Contractor wrapped the entire lower/below grade pier with ties epoxied into the pier on 4 sides. See photo #8. Drawing shows less reinforcement; in place/as-built pier reinforcement was more substantial than design. Contractor reported RDP would likely issue an email or sketch pertaining to as-built condition. Compliance Statement Based on our observations, construction activities at the above referenced locations appeared to be completed in general accordance with the project plans and specifications. Photo Log Report Number:JB231160.0001 Service Date:10/03/23 30 Corporate Cir Ste 201 Report Date:10/04/23 Albany, NY 12203-5169 Task:Site visit for inspection and testing services 518-266-0310 BBL Construction Services Attn: John Crupi CT0001, 10-16-13, Rev.10 Page 1 of 5 (P1) (J-10) 2nd column from East labeled C4; this work done before site visit. Cleaned rust and applied rust-oleum rust reformer product. Contractor provided photo. (P2) Applied Rust-Oleum after cleaning; North elevation Photo Log Report Number:JB231160.0001 Service Date:10/03/23 30 Corporate Cir Ste 201 Report Date:10/04/23 Albany, NY 12203-5169 Task:Site visit for inspection and testing services 518-266-0310 BBL Construction Services Attn: John Crupi CT0001, 10-16-13, Rev.10 Page 2 of 5 (P4) South elevation (P3) Looking South; wide angle photo for location purpose Photo Log Report Number:JB231160.0001 Service Date:10/03/23 30 Corporate Cir Ste 201 Report Date:10/04/23 Albany, NY 12203-5169 Task:Site visit for inspection and testing services 518-266-0310 BBL Construction Services Attn: John Crupi CT0001, 10-16-13, Rev.10 Page 3 of 5 (P4) Hilti HIT-RE 500 epoxy (P5) 7/8” vacuum bit for the #6 vertical bars Photo Log Report Number:JB231160.0001 Service Date:10/03/23 30 Corporate Cir Ste 201 Report Date:10/04/23 Albany, NY 12203-5169 Task:Site visit for inspection and testing services 518-266-0310 BBL Construction Services Attn: John Crupi CT0001, 10-16-13, Rev.10 Page 4 of 5 (P6) S102 drawing (P7) Bonding agent batched May 5th 2023, good for one year Photo Log Report Number:JB231160.0001 Service Date:10/03/23 30 Corporate Cir Ste 201 Report Date:10/04/23 Albany, NY 12203-5169 Task:Site visit for inspection and testing services 518-266-0310 BBL Construction Services Attn: John Crupi CT0001, 10-16-13, Rev.10 Page 5 of 5 (P8) Looking NW at added pier reinforcement. Ties drilled/epoxied at all 4 sides. Contractor used Hilti HIT 200 at South elevation ties; note color difference. (4) Long vertical #6 bars not yet installed at corners.