Loading...
IM Inspection Worksheet_11-10-2023_11-28-53INSPECTION WORKSHEET (SEP-028210-2023) SEP-0435-2023Case Number:Case Module:Permit Management 10/11/2023 PassedInspection Status:Inspection Date: SepticInspection Type:Inspector:Charles Dyer Job Address:Parcel Number:12 Queens Ln Queensbury, NY 12804 301.5-1-34 Company Name NameContact Type Applicant IBS Septic Contractor IBS Septic Granted Permission Rick Davidson Primary Owner Rick Davidson Checklist Item CommentsPassed Building Inspector Notes True partial inspection only / placement of 1250 gallon fiber / plastic tank Soil Type: Sand True Size of Stone False N/A Waterline separation distance True Building to Tank True 4" SCHD 40 [Provide extension collar if Yes]True Tank to Distribution Box True 4" SDR 35 Opening Sealed:True End Cap True Absorbtion Fields: Total Length True not installed at time of inspection 7/20/23. Verified 10/11/23 - 150 ft / Infiltrators ARC 24 Foundation to Tank True 25+ ft Engineer Report and As-Built True As-built provided by installer Sump pump not connected to septic system True Location of system on property True Rear of garage / patio Inlet & Outlet manholes 12"+ below grade True Type of Water: Municipal / Well Water True municipal Locations / Separations True new tank off of patio behind garage Depth of Trenches True 4+ ft with vent Length of Each Trench True 50ft System Use Status True Conforms as per Plot Plan True Size of tank True 1250 gallon / plastic Distribution box to Field / Pit True 4" SDR 35 to Infiltrators Foundation to Absorption True 28+- ft InletOutlet Pipes & Baffles True only inlet at time of inspection / yes- effulent filter at outlet October 11, 2023 Page 1 of 1